Scaffolding Accessories Sleeve Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details
Place of Origin: | Model Number: | ||||
Type: | Scaffolding Part Type: | color: | |||
material: |
Packaging & Delivery
Packaging Detail: | in cartons or in weaving bags |
Delivery Detail: | within 30 days after we receving the deposits |
Specifications
scaffolding sleeve coupler
1.Pressed or drop forged
2.48.3mm,48.6mm,42mm
EN74 BS1139 scaffolding sleeve coupler
SPECIFICATIONS:
1 MATERIAL:Q235
2 SWIVEL AND DOULE RIGHT ANGLE COUPLER
3 DROP FORGED AND PRESSED
4 BS1139 AND EN74 STANDARD
5 SIZE:48.3*48.3MM
6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.
Pressed swivel coupler 1.02kg galvanized/ hot dipped galvanized
Pressed fixed coupler 0.85kg galvanized / hot dipped galvanized
DROP FORGED SWIVEL COUPLER 1.05kg galvanized / hot dipped galvanized
DROP FORGED SWIVEL COUPLER 1.2kg
DROP FORGED PUT LOG COUPLER 0.62KG galvanized / hot dipped galvanized
DROP FORGED SLEEVE COUPLER 1.1KG galvanized / hot dipped galvanized
DROP FORGED FIXED BEAM COUPLER 1.4KG galvanized / hot dipped galvanized
DROP FORGED SWIVEL GRINDER COUPLER 1.5KG galvanized / hot dipped galvanized
7 SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM
8 Payment terms:30%TT deposit, balance against BL copy or LC at sight
9 FOB .CIF.C&F ,CFR acceptable
10 Delivery time;20-30days after receiving deposit
- Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
- So do the project budget review work, will help improve the design level and investment efficiency
- Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
- the preparation of construction organization plan, according to the characteristics of the construction of the rain, will not be the construction of the sub-project in advance or delayed construction
- Q:What is the most important safety hazard at the construction site?
- 2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
- Q:PLEASE HELP!!!!!
- maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
- Q:What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
- ... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
- Q:The name of the laws and regulations relating to the building, at least . The The
- , Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
- Q:What is the distance from the external walls of the scaffolding and scaffolding?
- Under normal circumstances, horizontal horizontal bar extension does not exceed 300mm
- Q:How to do a good job in typhoon prevention work in rural areas?
- Listen to weather forecasts, reinforce Dapeng and other infrastructure, to prevent lightning, to quickly cut off all kinds of electrical power
- Q:Can the fifteen typhoon blow up the three - storey house?
- The residents in the home against the typhoon to pay attention to what】? To put away a variety of hanging objects inside and outside the house to prevent the wind falling objects wounding; garden flowers with a bracket to protect, pruning branches to prevent the destruction or damage to the roof; The need for doors and windows, and add nailed wood; check the line, ready to flashlight, candles, storage of drinking water to prevent power off the water; more than a day food and vegetables, not necessary to go out
- Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
- yes - she is looking down on them after years of them looking down on her because of her adultery
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Scaffolding Accessories Sleeve Coupler
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords