• Facade Scaffolding System-Aluminium Scaffold Ladder CNBM System 1
  • Facade Scaffolding System-Aluminium Scaffold Ladder CNBM System 2
  • Facade Scaffolding System-Aluminium Scaffold Ladder CNBM System 3
Facade Scaffolding System-Aluminium Scaffold Ladder CNBM

Facade Scaffolding System-Aluminium Scaffold Ladder CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAD-AS

  • Type: Facade scaffolding stairway

  • Surface: In raw

  • Material: Aluminium 6063 T5

  • Hook style: For "U" profile

  • Loading Capacity: 400kg

  • Certification: CE

2.Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:

According to order quantity

3.Product Description

  

Model No: FAD-AS2570/3070
Model Name: Facade Scaffolding System-Aluminium Scaffold Ladder

 

4.Features:
1) Dimensions (Lx HxW ): 2570x 2000x610mm, 3070x2000x610mm

2) Made of Aluminum channel

3) Weight: 26/30kg
4) Special Used in facade scaffold systems
5) Surface: in raw.

6) Also can manufacture as your requirements.


 5.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Facade Scaffolding System-Aluminium Scaffold Ladder CNBM

Q: What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q: What kind of insulation materials and equipment are allowed to be imported in China?
What kind of insulation materials and equipment are allowed to be imported in China?
Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q: the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q: What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q: In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q: Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q: I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
Because you scaffolding too high pump enough, so you can only use the tow pump or car pump when the tow pump, the pump tube connected to the pouring site, with the pipe, pipe to complete the concrete pouring task
Q: Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords