• Frame Scaffolding System-Step Ladder  CNBM System 1
  • Frame Scaffolding System-Step Ladder  CNBM System 2
  • Frame Scaffolding System-Step Ladder  CNBM System 3
Frame Scaffolding System-Step Ladder  CNBM

Frame Scaffolding System-Step Ladder CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FS-SSL

  • Type: Scaffolding Parts, Step stair

  • Scaffolding Part Type: Scaffolding stair

  • Material: Steel

  • Surface: Paint/ galvanized

2.Packaging & Delivery

Packaging Details:Pallet

3.Product Description

Model No: RS-H-E

Model Name: Ringlock Scaffolding System-Removable Interior Stair handrail

4.Features:
1) Dimensions: used for 2070x 2000mm, 2570x2000mm, 3070x2000mm section

2) Made of steel

3) Weight: 28/32/36kg

4) Special Used in ringlock and facade scaffold systems
5) Surface: hot dipped galvanized.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Frame Scaffolding System-Step Ladder  CNBM

Q: Bridge template support bowl button steel scaffolding, you need to set the sweeping rod
Sweeping rod: part of the scaffolding works, sweeping rod distance from the ground 200mm, connecting the vertical pole of the horizontal rod. Divided into vertical and horizontal sweep rod, play the role of scaffolding stability.
Q: I got my industrial pierced about three days ago. The shop I wanted to go to closed so I went to another one that cost a bit more. The guy who pierced it said to only clean it with warm water, but when I got my helix, tounge webbing and angel bites I was told that all new piercings need disinfectant. What are some disinfectants I could use and am I right by doing this or should I listen to the piercer?
Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
Q: What is scaffolding in the psychology field?
I study Psychology but never heard of the term scaffolding. I know a scaffolding is a structure outside of a building used to clean windows and paint walls. But if you're not careful you will fall. So I guess if this is to apply to Psychology it must be an effect in that if one chooses things in life that are dangerous and not really thinking about the consequence of their actions, they are going to fall to their detriment. I guess!
Q: I've had my industrial piercing for about 6 months, about 2 months after I had it done I thought it was healed and stupidly changed the bar to a cheap on I bought off ebay. BIG mistake I know, it got infected and I was put on antibiotics. It's been healing well for about 3 months now, but how long roughly will it take to fully heal?
It depends on different people. It takes quite a while for industrial piercings to heal, it can take from 3 months, but usually it takes about 10 months to a year to fully heal.
Q: What kind of piercing would you recommend a scaffold piercing in the ears cartlidge or a belly button piercing?
I have both my cartilage and my belly button pierced. I love them both! Cartilage piercing was initially less painful until you had to turn it once a day during cleaning - that hurt a lot. Also, whichever side you get it pierced on - it will hurt SO bad if you sleep on that side. It takes around 8 months to a year to completely heal. Cost was $40. Belly button - It felt like a pinch when I got mine done. Clean this one 2x a day with sea salt soaks. Don't swim until it is completely healed. It takes 6-8 months to completely heal. Cost was $20 on half price piercing day - so it's usually $40.
Q: Now there are oblique cast-in-place concrete beam bridge with oblique oblique do not know whether the bowl buckle scaffold or plug type scaffold can freely adjust the angle of skew, plug type scaffolding steel pipe is also 60cm, 90cm a root length
Bowl buckle scaffold cross is 90 degrees, auxiliary scissors to see the general situation in the 45 degrees -60 degrees.
Q: Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what. I would like to buy a large number of scaffolding, and then lease out, which type of scaffolding to buy what is better?
Now most of the crowd is the bowl buckle scaffolding, but now slowly being eliminated by the market
Q: The main load-bearing structure of the bridge is a hole L0=36 m reinforced concrete arch, with a total width of 3.4 meters, the highest to the lowest level of 17 meters, the use of bowl buckle scaffolding, scaffolding longitudinal 0.6m, transverse 0.9m, step 1.2m. Help me to calculate the bearing capacity of ah thank you!
Fulcrum spacing is 60cm longitudinal timbers, fulcrum M, square distance is W then according to uniform load distribution Q=p/wThen according to the number of cross W-1 span continuous beams with calculated Pmax and MmaxIn the calculation of I, W, E the final Mmax/W< limit stress but also to calculate the degree of winding </1400L (I value according to the size of the calculation, i=bh^2/6)The first layer of wood even finished the calculationThen go down and check it outThe second layer is the fulcrum of wood 90cm
Q: I am doing a resource in class about the benefit of bamboo scaffolding and I can't find anything where in the us that it is used?
I suspect that it doesn't meet the requirements of OSHA.
Q: Requirements for the current bowl frame. What is the vertical distance, the horizontal distance and the step distance
The specification of bowl buckle frame is JGJ 166-2008 "safety technical specification for construction of bowl buckle scaffold"

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords