Aluminum Beams Formwork Girder for Slab Formwork

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Detailed Product Description


1.The aluminum material is made from brand of 6063T5.

2.High stability with “” section.

3.Especially designed for formwork used in slab.




H10 6063T5 Structural Aluminum Beams Formwork Girder for Slab Formwork

Description:

6063T5 Structural Aluminum Beams Formwork Girder for Slab Formwork


The aluminum beam is composed of aluminum frame, wood and connectors.It is easy to assemble, less weight than steel beam and the girders is good choice for slab formwork.

Competitive Advantage:

1. Easy assemble with simple structure.
2. Especially designed for formwork used in slab.
3. High stability with “6063T5 Structural Aluminum Beams Formwork Girder for Slab Formwork” section.
4. Filled wood structure increased strength of girder and it make easier connector for plywood by means of nails.
5. As the second beam for slab formwork, it is easier to connect with main beam by means of the neat fastenings from it.
6. The aluminum material is made from brand of 6063T5, good materials guarantee good products.


Applications:

6063T5 Structural Aluminum Beams Formwork Girder for Slab Formwork

6063T5 Structural Aluminum Beams Formwork Girder for Slab Formwork


Q:Bowl buckle scaffold is not a pipe fitting scaffold
The steel pipe scaffold is mainly used to connect the steel pipe, the specific method is different.
Q:What is the size of the bowl buckle scaffold?
Bowl buckle type scaffold poleName specification A (mm) B (mm) theoretical weight (kg)Riser LG-60 6004
Q:Okay I have some questions:-When I get it done can I have- 2 labret retainers put in to hide them from my school?-If I can, how discreet are the retainers?-How long to heal? (Even though the piercer will tell me)-Have you got a picture of a scaffolding piercing with retainers? May I see it (:-And a basic clear cleaning regime?Thankyous (: x
Im pretty sure you can have retainers for your industrial piercing if you get it done buuuuut you wont be able to put them in for a couple months cause industrials take a long time to heal. And like the person said below it really depends on your skin tone and what color retainer you buy. You shouldnt have a problem with the industrial though cause people cant see mine if I have my hair down. They take up to 1 year to fully heal. You can swap your piercings out after 3 months but beware it can close up on you if you have difficulty putting it in. You HAVE to wait 3 months before you can put retainers in. Industrials are 14g piercings so make sure your retainers are the right gauge. Your ear will be sore for a long time dear. Mine didnt hurt while getting it pierced cause I have a high pain tolerance but my ear was sore and bruised afterwards. The healing process is very delicate and your ear will be sore for a couple months. Make sure you get the piercing on the ear you dont sleep on. I use a 50/50 solution of Betadine and distilled water. Other piercers have different cleaning regimes though, so listen to your piercer. I always clean it with warm water and use a Q-tip to clean around the piercing. Then I put the cleaning solution on and twist the piercing around GENTLY so the solution will go into the cartilege. I do this 3 times a day and i will do it for a month. Industrials are really delicate piercings so always keep it clean :)
Q:Full house scaffolding height of more than the number of meters experts need to do
According to the "construction safety inspection standards" JGJ59-2011 "and the construction of steel tubular scaffold safety technical specifications" JGJ130-2011, the maximum height of steel tubular scaffold erection allowed is 50 meters, frame erection height of more than 50m, should prepare special construction scheme and not according to the provisions of the organization of experts, approval before implementation.
Q:What are the requirements for the erection of the bowl - shaped steel tube scaffold
According to the specification requirements of every three vertical and horizontal cross set with scissors support; height of more than 8 meters in the low to vertical, vertical and horizontal set of scissors. Generally speaking, the technical requirements of the roof beam, the coupling beam parts are independent support, whether the existence of suspension.
Q:An 800N painter stands 3.00m from the left end of a scaffold that is 4.00m long. The uniform wooden scaffold weighs 100N and is hung by a chain at each end. What is the tension in each chain?A uniform meter stick weighs 25 N. An 80 N weight is hung at the 20.0cm mark. A 70.0N weight is hung at the 90cm mark. what is the magnitude of the upward force needed to balance the meter stick?Please help! I have a huge exam on these and my teacher wouldn't help me! I am so stumped please help!
Required conditions for equilibrium (Other wise the scaffold is moving) Sum of forces = 0 Sum of Torques = 0 Sum of Forces Painter: 800 N DOWN Scaffold: 100 N Down Sum of tensions in chains = 800 + 100 = 900 N UP Sum of Torques (Pick one end, it does not matter which. I choose the Left end) Torque = Force * Lever arm Painter is 3.0 meters from Left end Tp = 800 N * 3.00 m = 2,400 N-m CW (Clockwise) Center of gravity is at the center of the scaffold or 4/2 = 2 meters from the Left enf Ts = 100 * 2 = 200 N-m CW This means that the chain on the Right end must supply 2400 + 200 = 2600 N-m CCW Tc = Fc * 4.00 m 2600 = Fc * 4 Fc= 650 N UP Total need up is 900 N====> 900 - 650 = 250 N in Left chain QED
Q:Wheel buckle scaffolding and scaffolding, do.
1 raw materials for steel tube is a pipe, two grade steel using many small workshop production and processing, easy to crack Bohou uneven uneven force, easy to cause the scaffolding collapse accident
Q:How to weigh the weight per meter of wrist button scaffold
Heavy 17.07KG. The main component is 48 *, Q235 welded steel pipe
Q:I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
well when i got my lip pierced idk if this is the same thing but when i woke up the next morning there was blood on my pillow, my face, and running down my neck and now its fine just be sure to clean it every day and it should be fine
Q:Ok, so I'm getting a industrial/scaffolding piercing tomorrow and I'm just wandering which ear I should get pierced?I sleep on my left ear;I have I side fridge that goes over my right eye.Also I know the right ear is more popular, is there a particular reason for this?Also how much pain should I be expecting?Thankksss..
Huh, I have mine on my left ear. I suggest getting it on your right ear, you really need to avoid sleeping on it, and trust me, it's really uncomfortable if you do!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request