Ring-Lock Scaffolding Accessories

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ring-lock Scaffolding

A support system for construction, ownsadvantages of both cup-lock scaffolding andshoring tower.

It is in the development direction of new typescaffolding.

It is widely used in buildings, bridges, tunnels etc..


Characteristics:

◆ Easy to storage and transportation

◆ High degree of standardization

◆ Easy and quick erection

◆ Excellent stability and bearing capacity



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Door type steel pipe scaffold, bowl type, plate type, what is the disc pin?
Scaffolding and scaffolding for large, mainly used for heavy-duty supporting thickness of concrete thick bearing capacity of the two systems, such as subway, station, bridge etc..
Q:What do people think of scaffold piercings on guys? thinking of getting one?
Disgusting
Q:Industrial/scaffold piercing question?
There is no way to know, everyone's ear is a different size so length of the bar is going to vary from person to person. Go to another piercer to have them fit jewelry to you.
Q:Where can I buy Web-Tex scaffolding?
you can also search the inter for the best supplier of that product......
Q:how much does a scaffold/industrial piercing cost?
it really depends on where you get it done i not really good on math but it should only cost 30 or so check around where you live and see go to a local tattooing shop they should do piercings there for cheap and on the pain level i give about a 6 or 7 depending or youre pain tolarance i hope this helps
Q:Physics Problem - A 56.0kg painter is on a uniform 23.5kg scaffold supported from above by ropes?
Torques left, about right rope. Scaffold is 6m long. 23.5/6 = 3.91667kg per metre. 3.91667 x 5m = 19.58335kg/m. 5kg x 3m = 15kg/m. Total = 34.58335kg/m torque. Torque right. 1 x 3.19667 = 3.91667kg/m. Subtract right from left, = 34.58335 - 3.91667 = 30.6667kg/m can be applied by the painter. 30.6667/ 56 = .548 metre, the painter can move to the right of the right rope.
Q:to avoid scaffolding etc is there a roof sealant/filler to fill leaking roof?
You cannot repair any roof from the inside. Whoever did that internal patch was a hack.
Q:Why not connected with the bracket or arch construction scaffolding
2 the support column must fall on the foundation with enough bearing capacity, the bottom end of the column must be provided with a backing plate or a concrete cushion block. The foundation of the support is forbidden to be soaked by water, and the measures to prevent frost heave must be taken in winter construction.3 both sides of the support hole should be reinforced, the night should be set warning lights. In the construction of the river which is easy to be affected by drifting objects, a strong protective device should be set up.4 installation bracket and arch process, should be installed with the erection of temporary support. The multilayer bracket, horizontal plate bracket should be horizontal, vertical column should, on the lower column should be in the same center line.5 frame or not connected with the construction scaffolding and arch bridge.
Q:A window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 210 N?
assuming the scaffold is uniform weight, take moments around 1 end to get the tension in the rope of the other the ∑M = 0, take the rope tension direction as positive 690 x 2.3 + 210 x (3.3 / 2) = T1 x 3.3 T1 = 586N Now moments around the other end 690 x (3.3-2.3) + 210 x (3.3/2) = T2 x 3.3 T2 = 314N You can check your answers as ∑F = 0, so 586 + 314 - 210 - 690 = 0
Q:massless scaffold is held up by a wire at each end. The scaffold is 12m long. A 300-N box sits 4.0 m from the?
And you asked this physics question in the math section of answers because? Let Tl and Tr be the tensions in the left and right wires. We are told the weight of the box is W and that the scaffold is weightless.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range