Frame Scaffolding System-Steel Catwalk CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FS-CW

  • Type: Scaffolding Parts, Wire mesh scaffolding plank

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Steel

  • Surface: Paint/electro- (hot dipped) galvanized or to be ordered

  • Load capacity: 300kg

  • Hook: 4 pieces

  • Frame Scaffolding System-Steel Catwalk CNBM

    2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Description

Model No: FAS-A

Model Name: Layher Aluminium Facade Scaffolding System

4.Features:

1. Made of high strength aluminium tube and pofile
2. Including: Assembly Frame, guardrail, diagonal brace, scaffolding deck, base plate, toe board etc.

3. With a few basic elements and a few basic operations, this FACADE SCAFFOLDING will provide you at lightning speed with a safe foundation for any job. It has been the leading frame scaffolding on the Europea market now, and with this unbeatably fast yet strong and safe system you can cope with almost every requirement. FACADE SCAFFOLDING can be used profitably both for scaffolding work and for building trades thanks to its versatile and well-thought-out parts range.

4. With only 6 basic elements, this classical Facade Scaffolding is assembled in no time at all. The system is extendable with lots of logical extension possibilities

5. Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery
Q:would it be weird if the scaffold piercing was the only ear piecing i had?
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 3?
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range