Scaffolding Accessories Sleeve Coupler

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8618101089932

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
China (Mainland)


Model Number:
COUPLER210
Type:
Scaffolding Parts
Scaffolding Part Type:
Scaffolding Couplers
color:
yellow
material:
matel

Packaging & Delivery

Packaging Detail:in cartons or in weaving bags
Delivery Detail:within 30 days after we receving the deposits

Specifications

scaffolding sleeve coupler
1.Pressed or drop forged
2.48.3mm,48.6mm,42mm

EN74 BS1139  scaffolding sleeve coupler

Product Description

SPECIFICATIONS:

1 MATERIAL:Q235

2 SWIVEL AND DOULE RIGHT ANGLE COUPLER

3 DROP FORGED AND PRESSED

4 BS1139 AND EN74 STANDARD

5 SIZE:48.3*48.3MM

6 PRESSED AND DROP FORED SWIVEL AND FIXED COUPLER/PUTLOG COUPLER/SLEEVE COUPLER/INNER CONNECTOR/BEAM COUPLER ETC.

Pressed swivel coupler 1.02kg  galvanized/ hot dipped galvanized

Pressed fixed coupler  0.85kg  galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.05kg       galvanized / hot dipped galvanized

DROP FORGED SWIVEL COUPLER   1.2kg  

DROP FORGED PUT LOG COUPLER  0.62KG    galvanized / hot dipped galvanized

DROP FORGED SLEEVE COUPLER     1.1KG    galvanized / hot dipped galvanized

DROP FORGED  FIXED BEAM COUPLER     1.4KG    galvanized / hot dipped galvanized

DROP FORGED SWIVEL GRINDER COUPLER     1.5KG    galvanized / hot dipped galvanized

7  SUITABLE FOR PIPE DIAMETER:48MM,48.3MM,60.3MM

8 Payment terms:30%TT deposit, balance against BL copy or LC at sight

9 FOB .CIF.C&F ,CFR acceptable

10 Delivery time;20-30days after receiving deposit


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q:Why the height increase of ten centimeters increase in housing ten percent
Increase the cost of ten centimeters increase in housing costs by about three percent
Q:Such as the title, raw materials and structural parts What is the difference, how to divide?
Prefabricated concrete pipe piles are structural parts Raw materials refers to the main components of steel, cement, sand, stone and so on
Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:The name of the laws and regulations relating to the building, at least . The The
, Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
Q:What is the vertical transport of construction and the high increase in fees
In the contract of the project, the construction unit is paid a fee for the construction unit
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range
客服
live chat