Flat Scaffolding Jack Base

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
500000根 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Scaffolding Jack Base

1.Steel material: Q235
2.Length:Customized.
3.Hollow .
4.Shpae of base: U head, plain head.

5.Surface treatment: Oiled Color painted, Hot dip galvanized, Electro galvanized

6.Usage:Scaffolding part, adjusts the balance of scaffolding frame.

Adjustable Scaffolding Base jack
Size: 35/38x4mm, 143x143x5/6mm, 600,914,1524mm
Material: Q235

Surface finish:painted,galvanized

Type: base jack, top jack

Diameter: 30mm, 32mm, 34mm, 36mm, 37mm, 38mm, 40mm

Length: 400mm, 600mm

Base plate: 140*140*5mm

OEM service provided

Screw Jack Base

Dimensions: Diameter 35/38mm, Base plate 143x143x5/6mm, length 600,914,1524mm

Item

Screw Jack Base

Material

Q235

Dimensions

35/38mm, 100x150mm, 600,914,1524mm

Surface

Hot-dip galvanization, electro galvanization ,or as your request

Standard

EN74

Note

OEM service is available

MOQ

1000pieces

Package

in steel pallet, or as your request

Payment Terms

TT,L/C, we can contact in detail

Delivery Time

20-30days

Feature of screw jack base:

1) Base plates provide extra stability.

2) Enables safe use on uneven ground.

3) Galvanization for long lasting protection.

4) Elements safely connected.



Type: base jack, top jack

Diameter: 32mm, 34mm, 38mm

Length: 400mm, 600mm

Base plate: 120*120*5mm, 140*140*5mm, 150*150*6mm

OEM service provided




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Will the concrete cloth machine and the tower crane is different, long quite like
Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
Q:There is no shelter outside the scaffolding project has been accident accident case
I do not know what the problem you said is not clear, to send the following to you, for your reference: [Case 1] a single industrial plant project, eaves high 20m, construction area of ​​5800m2
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
1) In three seconds the paintbrush accelerated to a speed of 96 feet/sec (ignoring air resistance) at a acceleration of 32 feet/sec/sec. 2) It started at a speed of zero, so the average speed for those three seconds was 48 feet/sec. 3) 3 seconds times 48 feet/sec. equals 144 feet.
Q:How to calculate the amount of steel pipe Pay attention to meters as a unit, or tons of units! Thank you
With the number of specifications after each, in accordance with the principle of 260M for a ton See how much the specific need to be able to You said ten layers, not all ten layers of all structures, you can build three layers of three 3m high So you need to use more than 25 high steel pipe, because there are up and down positions Hope to help you, if you still do not understand, you can go to China Building Materials Leasing Network wwwzzzlllcom inquiries
Q:Seeking the Responsibility System of Safety Responsibility of Each Function Department
System, and to monitor the implementation of the situation
Q:At the scaffold, Dimmesdale sees 3 people before Hester and Pearl. Who are they, what do they represent?Help!?
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
Q:scaffold on a tall office building.?
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range