• Ladder Frame Steel Tower Scaffolding light duty CNBM System 1
  • Ladder Frame Steel Tower Scaffolding light duty CNBM System 2
Ladder Frame Steel Tower Scaffolding light duty CNBM

Ladder Frame Steel Tower Scaffolding light duty CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Brand Name: AJ steel tower scaffolding

  • Model Number: LF1700 steel tower scaffolding

  • Material: Q235 steel pipe

  • Color: Orange,dark red,blue

  • Surface treatment: Dip painted

  • Technique: CO2 arc welded

  • Diameter: 42mm

  • Height: 1.7 m /set

  • Thickness: 2.0/2.2mm

  • Type: light duty steel tower scaffolding

  • Application: steel ladder scaffolding for interior and exterior construction

  • Certification: SGS


2.Packaging & Delivery

Packaging Details:

Delivery Detail:

1.steel tower scaffolding is in bare package, loading in container. 2.One 20 GP container can load almost 150 sets of Scaffold Building Tools

10-20 days after deposit

3.

Model No.

Standard 
  Length

Ledger 
  Length

Thickness

LF1700

1.7m

1.2m

2/2.2mm

LF1219

1.2m

1.2m

2/2.2mm

LF914

0.9m

1.2m

2/2.2mm

4.feature

 A set of steel tower scaffolding has 2 pieces of welded ladder frames, 2 pairs of cross braces,  4pieces of connect pins.

Steel tower scaffolding is the ladder type frame scaffolding which is made of Q235 steel pipes  .

Steel tower scaffolding can be moveable by installing caster wheels at the bottom of ladder scaffold.

Specification of steel tower scaffolding 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Ladder Frame Steel Tower Scaffolding light duty CNBM

Q:There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q:Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
Scaffolding erection specifications are as follows, if you want to do more understanding, then please look carefully Oh, a lot of content, looks a bit boring
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q:- Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
In the late 1950s, oil wells were specially developed for oil
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The definition of project supervision responsibility is a longstanding problem that has long plagued the supervision industry

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords