• Steel Faslework Frame Scaffolding Scaffold Plank CNBM System 1
  • Steel Faslework Frame Scaffolding Scaffold Plank CNBM System 2
Steel Faslework Frame Scaffolding Scaffold Plank CNBM

Steel Faslework Frame Scaffolding Scaffold Plank CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: RS-AP

  • Type: Scaffolding Parts, Without ladder

  • Scaffolding Part Type: Scaffolding Planks

  • Material: Aluminium

  • Feature: Light Weight

  • Loading Capacity: 300lkg

Steel Faslework Frame Scaffolding Scaffold Plank CNBM

2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:

3.Product Description

Model No: RS-AP

Model Name: Ringlock Scaffolding System-Aluminium Scaffold Plank
4.Features:
1) Dimensions (Lx W ): 2070x610mm, 2570x610mm, 3070x610mm
2) Made of Aluminum channel and sheet
3) Used in ringlock scaffold systems
4) Surface: Aluminum oxygenation

5) With hook for tube and u-profile

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:I have been siding my house using pump jack scaffolding on wood poles. I am at a second floor section that is located over a pitch roof. Is there a safe way to mount poles on top of pitch roof to finish this section?
At that height you need support beams, scaffolding alone won't cover it.
Q:i know they are meant to be done as one piercing and with one bar to reduce the risk of them not aligning properly but is it possible to have it done as one piercing and then replacing the bar with two separate ones after it has partially healed. is there still a risk? also, how low down and at what angle should the bar be?thanks x
They can be done as two separate piercings, and it is up to the piercer and the shape of your ear to decide if something like that will be done. However, I would not recommend it, because even if it is partially healed, putting two separate earrings in can still misalign the piercing when you go to put the bar back in later. I would recommend keeping the bar in, it's a guaranteed way to make your piercing work out. Besides, once you get used to the bar, you won't even know you have it in! Much easier than keeping track of two separate earrings and making sure they still align months down the road. As for the angle, it depends on your preference and what is able to be done due to the shape of your ear. Some people want theirs straight across, others want a much steeper angle. It all depends on preference and shape of ear. Hope this helps, good luck!
Q:Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
not all jobs are as big as the ones reffered to but I learned something here
Q:How much is the price of the bowl buckle scaffold
The price of the bowl buckle scaffold is 3850 yuan / ton, the cross bar is 1.2 meters, and the price is 3700 yuan per ton, which is about 0.9 yuan,
Q:I got my scaffolding piercing yesterday (a bar through the cartilage) and when i woke up this morning there was quite a lot of blood, i mean like there was big clumps of it around the holes. I've cleaned it up and it seems to look okay and it isn't any more painful than when i got it done yesterday. Is this normal?Thanks (:
Yeah, your body is reacting to having a giant metal rod through it =] Its likely that in your sleep youve rolled onto it and that has caused the piercing to bleed. You can try putting a pillow next to you to aviod you rolling over. Otherwise dont sweat it just keep cleaning twice daily and youll be fine.
Q:at what age can you get a scaffold/industrial piercing in england without parental consent?
there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.
Q:this work wont start till tuesday and the scaffold has blocked my sky tv. am i within my rights to remove this scaffolding?
No you are not within your rights to remove the scaffolding. Call the landlord to see if anything can be done. Or you could read, go for a walk. It is not the end of the world to not have tv.
Q:For my last piercing i think im gona make it worth it and get one of them ^^^ but i just looked on a website that describes them as both of them words i was just wondering are they completely different piercings ? and if so which one would be the better one to get?
both are built to have supports
Q:im quite high up so would have to do the job internally (from the inside..avoiding climbing on roof). it seems that a material (looks like cement?) was used on this old roof (on the inside) and some of this has washed away as i can see daylight where the rain water is leaking through. there's also no black felt evident
You cannot repair any roof from the inside. Whoever did that internal patch was a hack.
Q:I've been wanting an industrial piercing for quite a while now, and thankfully I convinced my parents to let me get it done about two weeks ago. We were on vacation in Florida last week and my mom said I could get it done there if I wanted, so we went into a tattoo shop and asked about it. They told me something I'd never heard before, that they would pierce the holes with hoops and in about a month I could put the barbell in. The piercers told me it would heal a lot easier this way and if the barbell was put in right away I'd end up taking it out because of the pain. This makes sense of course, but I have NEVER heard of it being pierced this way, and once the holes heal, won't they be off in aligning the bar with the piercings, causing me even more pain?They told me if I get it pierced in my home town to tell the piercer to do it the way they suggested but I'm not sure at all. I could take the pain if that was the only issue, but if it would heal better.. I'm not sure. Help? Thanks!
Stretching shouldn't hurt if you're giving it enough time... so this really isn't a good comparison! A single cartilage piercing doesn't hurt much more than your standard earlobe (lobe being 2, cartilage piercing being 3 on a scale of 1 to 10). But I've never had a scaffold or orbital of any kind, so I don't have much first hand experience. Honestly though I wouldn't worry about it. It will be over in 30 seconds, 1 minute tops. And you get to come away with a pretty new piercing! Yay!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords