Frame Type Steel Scaffolding CNBM

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: FAD-BJ

  • Type: Scaffolding Parts, Hollow and Solid

  • Scaffolding Part Type: Scaffolding Jack

  • Specification: Base Jack

  • Length: 300mm-3000mm

  • Nut: Cast

  • Thread: By Rolling Or Lathe

  • Standard: EN12811

  • Frame Type Steel Scaffolding CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model Name:  Scaffolding Screw Base Jack

Model No.: FAD BJ


1) Material: Q235 tube with screw nut

2) Specification: 300mm-3000mm

3) Type: hollow

3) Surface finish: painted, electro-


4) Weight: 2kg-10kg

5) OEM services are provided.


Ring   Lock System Scaffold Standard / Verticals






Ring Lock Standard 3000mm (9'10")




Ring Lock Standard 2500mm (8'2")




Ring Lock Standard 2000mm (6'6")




Ring Lock Standard 1500mm (4'11")




Ring Lock Standard 1000mm (3'3")




Ring Lock Standard 500mm (1'8")




5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The definition of project supervision responsibility is a longstanding problem that has long plagued the supervision industry
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:What rights do I have as a tenant in regards to the scaffolding outside my window?
The scaffold is necesary, and already thre, and probably not coming down. I would think you have to LET the Land Lord give you a deal, and any decent LAnd Lord should respect wishes. You may have to move, but a deduction, possibly. Security, demand it ! Get the windows fixed, and if you are really unsure of the scaffold and window, get renters insurance, it's just twenty bux a month !. or buy a big DOG
Q:What are the measures in the rainy season? What precautions must be done?
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q:The name of the laws and regulations relating to the building, at least 100, The The
, Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:scaffold on a tall office building.?
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range