• Frame Type Steel Scaffolding CNBM System 1
  • Frame Type Steel Scaffolding CNBM System 2
Frame Type Steel Scaffolding CNBM

Frame Type Steel Scaffolding CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAD-BJ

  • Type: Scaffolding Parts, Hollow and Solid

  • Scaffolding Part Type: Scaffolding Jack

  • Specification: Base Jack

  • Length: 300mm-3000mm

  • Nut: Cast

  • Thread: By Rolling Or Lathe

  • Standard: EN12811

  • Frame Type Steel Scaffolding CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model Name:  Scaffolding Screw Base Jack

Model No.: FAD BJ

Features:

1) Material: Q235 tube with screw nut

2) Specification: 300mm-3000mm

3) Type: hollow

3) Surface finish: painted, electro-

galvanized

4) Weight: 2kg-10kg

5) OEM services are provided.

 4.

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding erection specification staff up and down and transport materials When lifting the weight with the lifting device, it is not permissible to connect the lifting device and the scaffolding structure set up scaffolding work leaders should take the scaffolding to pass the test and issued a written proof of the use of the prospective use The person in charge of the maintenance work should check the status of the scaffolding and scaffold used daily, and if necessary, refurbish immediately is strictly prohibited with hand barrels, wooden boxes, bricks and other building materials take temporary plate to replace the regular scaffolding scaffolding on the prohibition of random wire Must be installed temporary lighting lines, wood bamboo scaffolding should be added insulators, metal pipe scaffolding should be another wooden cross the installation of metal pipe scaffolding, prohibit the use of bending, flattened or cracked pipe, the successive parts of each tube to be intact, to prevent dumping or moving metal pipe scaffolding of the pole, must be vertically placed on the plate, in the placement of the floor before the ground to consolidate, leveling The pole should be fitted with a pillar, which is made of a pillar base and a pipe welded to the floor metal pipe scaffolding joints, the application of special hinges overlap each other, this hinge for right angles, but also for acute and obtuse (for bracing, etc) The hinge bolts connecting the various components must be tightened scaffold board must be fixed in the metal pipe scaffold on the beam when moving scaffolding, the scaffolding of all staff must be down, above the work of the scaffolding prohibited to move.
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Sprinkling water on the construction helps to help reduce haze days
Construction site environmental protection measures are as follows: First, the dust management
Q:On the issue of compensation after the event of force majeure
If the rain will be the construction of the road also washed away, then the road and repair costs borne by the owners There is a principle, "who is the child who is going," the engineering entity itself is the owner of this needless to say; the scene of the material is also the owner of the stack; the road would have been "seven links and one leveling" content, ; Required engineers to stay in the construction site necessary management and security personnel are owners of the requirements of the engineers, should belong to the owners But scaffolding is a technical measure, you should bear Such a look, is not clear how much ah
Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords