• Frame Scaffolding System-Board Hopup Bracket CNBM System 1
  • Frame Scaffolding System-Board Hopup Bracket CNBM System 2
Frame Scaffolding System-Board Hopup Bracket CNBM

Frame Scaffolding System-Board Hopup Bracket CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FS-BHB

  • Type: Scaffolding Parts, Frame scaffolding bracket

  • Scaffolding Part Type: Scaffolding bracket

  • Connect: By tube clampe

  • Material: Steel

Frame Scaffolding System-Board Hopup Bracket CNBM


Packaging & Delivery

Packaging Details:pallet

2.Product Description

Model No: FAS-S

Model Name: Speedy Scaffolding System

3.Features:

1. Made of high strength steel tube
2. Including:

1) Frame: 2000/1500/1000mm(H)x732mm(W)

               1000/666mm(H)x732mm(W) with connector

2) Clamp Horizontal: 1572/2072/2572/3072mm(L)

3) Single Beam: 700/1056/1540/2040/2540/3040mm(L)

4) Double Beam: 1540/2040/2540/3040/4112mm(L)x435mm(W)

5) Brace: 2824/3209/3632mm(L) with single clamp

              4433mm(L) with double clamp

6) Safety Gate: 696mm(W)x464mm(H)

7) Steel Plank: 690/1046/1530/2030/2530/3030mm(L)x320mm(W)

8) Aluminium platform ladder: 2530/3030mm(L)x610mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement.

4.

Ring   Lock System Scaffold Steel Plank (9.5" wide)

Model

Description

Weight(kg)

Weight(lbs)

AR.SSP.3050

Ring Lock Steel Plank 3050mm (10')

20.56

42.92

AR.SSP.2440

Ring Lock Steel Plank 2440mm (8')

17.01

35.13

AR.SSP.2130

Ring Lock Steel Plank 2130mm (7')

15.21

31.17

AR.SSP.1830

Ring Lock Steel Plank 1830mm (6')

13.47

27.34

AR.SSP.1520

Ring Lock Steel Plank 1520mm (5')

11.66

23.39

AR.SSP.1220

Ring Lock Steel Plank 1220mm (4')

9.92

19.56

AR.SSP.1150

Ring Lock Steel Plank 1150mm (3'10")



5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
the HOW is that if he moves 1/6 of the way to an end, then he's 1/3 of the way from that end and 2/3 of the way from the other end. The tension from the platform doesn't change, but the tension from the man on either rope is inversely proportional to his distance from either end; in other words, he's 1/3 of the way from the right end, so 2/3 of his mass goes to tension on that rope; he's 2/3 from the other end so 1/3 of his mass goes to tension on the left rope. the rest is just math!
Q:There is a 5.0 kg pail of paint to one side, as shown. How close to the end can he approach safely? Express your answer using two significant figures. If there is more than one answer, separate them by commas.
I am looking for as shown, as I am not psychic.
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:What is the distance from the external walls of the scaffolding and scaffolding?
Common terminology in the construction industry, refers to the construction site used in the external walls, interior decoration or high height can not be directly the construction of the place Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials Scaffold board can be made of steel, wood, bamboo material, single scaffolding quality should not be greater than 30KG
Q:Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help. Please help from the human, financial, facilities, steel, fastener configuration to help answer. Greatful
Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
Of course, you can make your own soil to do a radius of 4 meters small cloth machine
Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches