Steel Board Bracket Ringlock Scaffold CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: RS-BR

  • Usage: Construction

  • Material: Metal, Steel

  • Structure: Triangle Bracket

  • Standard or Nonstandard: Standard

  • Surface: Paint/electro- (hot dipped) galvanized or to be ordered

  • Specification: 390/730

  • System: Ringlock scaffolding

Packaging & Delivery

Packaging Details:Pallet

Delivery Detail:According to order quantity

2.Product Description

Model No: RS-BR

Product Name: Steel Board Bracket "O" For Ringlock Scaffold

3.Feature:

1) Main material: steel round tube

2) Specification(mm): 390/730(W)

3) Surface: painted/galvanized or to be order

4) Also can manufacture it as your requirement

4.

Ring   Lock System Scaffold Side Bracket

Model

Description

Weight(kg)

Weight(lbs)

AR.SB.400

Ring Lock Side Bracket 400mm (1'4")

4.88

10.77

AR.SB.650

Ring Lock Side Bracket 650mm (2'2")

6.72

14.81

AR.SB.880

Ring Lock Side Bracket 880mm (2'11")

8.12

17.91

AR.SBW.400

Ring Lock Side Bracket (Wall) 400mm (1'4")

4.82

10.62

AR.SBW.650

Ring Lock Side Bracket (Wall) 650mm (2'2")

6.72

14.82

AR.SBW.880

Ring Lock Side Bracket (Wall) 880mm (2'11")

8.36

18.44

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Steel Board Bracket Ringlock Scaffold CNBM

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding load shall not exceed 270kg & nbsp; # 47; m
Q:I would like to inquire cup lock system scaffolding, how much time per square meter and manpower to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
Q:a scaffold that weighs 300n supports two painters. one of the painters weighs 250n and the other weighs 300n.?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:What kind of insulation materials and equipment are allowed to be imported in China?
What kind of insulation materials and equipment are allowed to be imported in China?
Q:(Spoilers) In the Scarlet Letter if DImmesdale did not die on the scaffold would Chillingworth have killed him? He speaks of revenge.?
Chllingworth's revenge did not involve killing Dimmesdale. He preyed on Dimmesdale's guilty conscience and drove him to do what he did, out of guilt. What Chillingtonworth did was actually much crueler than just killing Dimmesdale outright.
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent ramps or independent ramps, there are construction organization design or construction program, according to the construction organization design or construction program requirements
Q:On the issue of compensation after the event of force majeure
It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range