Ladder Frame Steel Rolling Scaffold with rubber wheel CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1.Quick Details
Brand Name: AJ steel rolling scaffold
Model Number: LF1700 steel rolling scaffold
Material: Q235 steel pipe
Color: Orange,dark red,blue
Surface treatment: Dip painted
Technique: CO2 arc welded
Diameter: 42mm
Height: 1.7 m /set
Thickness: 2.0/2.2mm
Type: light duty steel rolling scaffold
Application: steel ladder scaffolding for interior and exterior construction
Certification: SGS
2.Packaging & Delivery
Packaging Details:
Delivery Detail:
Steel tube is packed in bundles with steel strips; coupling is packed in carbons. |
20 days after the deposit |
Durable steel scaffolding systems tube&coupling
3.Details
1. Scaffolding systems tube&coupling is one of the most labor intensive scaffolding systems,but the return on time investment is nearly umlimited adaptability and access to even the most unique jobsite.
2.The normal size of scaffold tube is 5.8 meter long,diameter 48mm. It is compatible with scaffolding couplers 48.6*48.6mm or 48.3*48.3mm.
3. Scaffold tube can be joint at any angles you want with three simple components:fixed coupler,swivel coupler and sleeve coupler.
4.The steel scaffold tube are mainly used to cover the outside wall of building,adaptable to any construction situation.However,they are also suitable to support inside concrete walls.
5.The thickness of scaffold tube can be 3.2mm,3mm and 2.75mm,the surface can be black,painted or cold galvanized.
4.Feature
Name | Scaffold tube |
Material | 100% Q235 steel |
Length | 5800mm |
Diameter | 48mm |
Thickness | 3mm |
Weight | About 20kg |
Surface | Galvanized,black |
* 1000 square meter construction site needs about 13 tons of scaffold tube.
* 1 ton of scaffold tube need about 200 pieces of couplers.
5.
Fixed coupler | Sleeve coupler | Swivel coupler | |
Ratio | 7 | 2 | 1 |
6.What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
- Q:The name of the laws and regulations relating to the building, at least . The The
- Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
- Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
- Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
- Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
- This company is hiring that company for those who buys them for that thing, from now and then!!
- Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
- (Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
- Q:What would you like to ask?At what height do scaffolds have to be engineered?
- At all heights...they are engineered as a system.
- Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
- This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
- Q:Can the fifteen typhoon blow up the three - storey house?
- Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
- Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
- Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Ladder Frame Steel Rolling Scaffold with rubber wheel CNBM
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20 m.t.
- Supply Capability:
- 3000 m.t./month
Offcanvas right
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords