Galvanized Adjustable scaffolding props Jack Post
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 180000 /month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Product name: scaffolding prop
Type:italian ,German,Spanish,Middle East prop, steel pipe surpport.
Adjustable height:0.8-5.5m
Pipe/Tube tickness:1.5mm-4mm
Innner Diameter:40mm,48mm,etc.
Outer Diameter:48mm,56mm,60mm,etc.
Plate type:square,flower/clover,U-head
Nut type: single handle(common,7-style, big 7-style),Cup-style/Double handle
Pin type:line stright with metal cap,line straight without metal cap,chain,G-style
Plate size:120*12*4mm,120*120*5mm,140*140*5mm/5.5mm,etc.
Surface treatment: painted,galvanized,powder coating
Color:orange,red,blue,green,white,etc.
OEM ACCEPTABLE
Fast delivery wihtin 30days
Professional and reliable
- Q: Will the scaffolding steel pipe specifications are generally how much ah? What are the specifications?
- scaffolding load shall not exceed 270kg / m
- Q: A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
- (332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
- Q: Pain on a scale of 1-10Advice on piercing?I heard it's easily infected??
- Pain will differ from person to person so no one can really answer that. My advice is to sleep with your arm bent under your head so your ear is in that little whole and nothing can bother it. Also, avoid dying your hair for the next two months and be care when putting on sweaters, shirts, brushing hair, et cetera. Infection is a problem if you keep it clean but irritation is because every time you bump on side, you bump the other as well. Good luck!
- Q: Why the height increase of ten centimeters increase in housing ten percent
- Increase the cost of ten centimeters increase in housing costs by about three percent
- Q: Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
- Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
- Q: On the issue of compensation after the event of force majeure
- It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
- Q: What is the most important safety hazard at the construction site?
- Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
- Q: Such as the title, raw materials and structural parts What is the difference, how to divide?
- There are columns: pipe pile, frame column, independent column, structural column, Cylindrical, L-shaped columns; brick columns, concrete columns, wooden columns Beam: frame beam, connecting beam, over beam, ring beam, cantilever beam, curved beam; steel beam, wooden beam, concrete beam Plate: cast-in-place board, prefabricated flat plate, prefabricated hollow plate; reinforced concrete plate, wood board Wall: brick wall, concrete wall, roof daughter wall, light partition Doors: solid wood doors, plywood doors, steel doors Windows: steel windows, wooden windows, aluminum windows, steel windows Building accessories are construction and construction components other than building blocks, such as scaffolding, pipe thread regulators for construction, construction bars, triangular construction supports, and steel joints
- Q: Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
- Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.
- Q: What is the vertical transport of construction and the high increase in fees
- In the contract of the project, the construction unit is paid a fee for the construction unit
Send your message to us
Galvanized Adjustable scaffolding props Jack Post
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- 180000 /month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords