• Scaffolding Double Pipe Coupler with top quality CNBM System 1
  • Scaffolding Double Pipe Coupler with top quality CNBM System 2
Scaffolding Double Pipe Coupler with top quality CNBM

Scaffolding Double Pipe Coupler with top quality CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Material: Carbon Steel

  • Technics: pressed

  • Type: Coupling

  • Model Number: KZ48-1

  • Connection: bolts

  • Shape: right angle

  • Head Code: Hexagon

  • Usage: Pipe Clamp

  • Structure: Fixed type

  • Standard: BS1139/EN74

  • Workmanship: pressed

  • Surface: Galvanized/painted

2.Packaging:pallet

3.Product Description

Model No: FAS-LP

Model Name: Scaffolding Hook-Lock Pin

Features:

1) Material: made of  Φ9 steel bar.

2) Surface: electro-galvanized/hot dipped galvanized

3) Weight: 0.1kg

4.


Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring   Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring   Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring   Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring   Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring   Lock Bay Brace 1520x2000mm (5')

7.91

17.45

5.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding Double Pipe Coupler with top quality CNBM

Q:What is the most important safety hazard at the construction site?
2 Closed management some of the site door does not set the corporate logo to enter the construction site staff wearing a work card is not complete
Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:Is it necessary to use a mat on the floor? Is that norm prescribed?
Scaffolding load shall not exceed 270kg & nbsp; # 47; m
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
No provisions are calculated according to the actual number of seats , the shelves of the ramp are dependent and independent of the ramp, the erection should be based on the actual needs of the project or construction organization design requirements Such as the need to set up shelves ramp, shelves ramps should be calculated by a seat, a ramps for a , shelves, high-rise buildings on the street, to prevent the construction materials and other items fall and pedestrians to take preventive measures, and has a windproof effect The shelving of the shelves shall be calculated in terms of the vertical area Seal material is considered in the fixed bamboo mat, such as the construction organization design using other materials, can be added to the additional quota
Q:the reading on the left scale is 400n what should the reading on the right scale be?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:How to do a good job in typhoon prevention work in rural areas?
Close the doors and windows, so as not to be strong wind blowing, check and tightly easy to be the wind to the objects, such as windows
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:what do you call a place of great significance? such as the scaffold in the Scarlet Letter?
Historical a place with alot of history attached to it Landmarks
Q:for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q:Also if its possible part B wants to know A ball thrown vertically upward is caught bythe thrower after 2 s.Find the initial velocity of the ball. Theacceleration of gravity is 9.8 m/s2Answer in units of m/sFind the maximum height it reaches.Answer in units of m
Use, Vf = Vo + g * t With Vo = 0 , Vf = g * t = 9.8 m/s^2 * 3.39 s = 33.222 m/s. part B, use the same equation, but take into consideration to watch for direction and adopt a convention. As before we have considered +ve for downward direction. Now Vf = 0 0 = Vo + g * t. Vo = - 9.8 m/s^2 * 2 s = -19.6 m/s . Negative means upward direction according to the adopted convention.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords