• Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 1
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 2
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 3
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 4
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
10 m.t.
Supply Capability:
15000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

Standard:

ASTM, AISI, DIN, EN, GB, JIS

Place of Origin:

Hebei, China (Mainland)

Brand Name:

yize

Model Number:

yz-7475

Type:

Seamless

Steel Grade:

300 Series

Application:

Construction ,industrial material

Certification:

ISO

Welding Line Type:

Spiral Welded

Thickness:

0.25-3.0mm

Outer Diameter:

6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm

certification:

ISO, ISO 9001

Length:

1m-12m

application:

Fluid Pipe

Finish:

2B (Mill Finish), bright, satin, hairline, mirror ETC

mark:

heat number,material,size,standard

Material:

AISI 201, 202, 304, 304L, 316, 316L and 430

Thickness Tolerance:

0.25-3.0mm

uses:

Construction ,industrial material

2.Packaging & Delivery

Packaging Details:plastic bag for each piece then packed in seaworthy wooden cases
Delivery Detail:30 days

 

3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube


 

1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.

 

2) Standard: AISI, ASTM, DIN, GB, JIS, SUS 

 

3) Dimension: 3-400mm 

 

4) Length: 2-6m or as customer decided

 

5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,

 

6) Packing: Nylon bag or according to client's requirement

 

Terms:

 

1) Delivery term: FOB,CFR, CIF

 

2) Delivery lead time: 10 working days after received T/T or L/C deposit.

 

3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.

 

4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.


4.Product Application:

 

With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet

 

 cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.

 

5.Chemical composition and physical properties:

 

Grade

C

Si

Mn

P

S

Ni

Cr

Cu

Mo

Ni

304

Max0.07

Max 1

Max 2

Max 0.045

0.15to0.35

Max0.11

17.5to19.5

Max 1

-

8to 10

 

304L

Max0.03

Max1

Max2

max0.045

Max0.03

Max0.11

18to20

-

2to2.5

10to12

 

316

Max0.07

Max1

Max2

max0.045

Max0.03

Max0.11

16.5to18.5

-

2to205

 

10to13

 

316L

Max0.03

Max1

Max2

Max0.045

Max0.03

Max0.11

17to19

-

2.5to3

 

12.5to15

410

0.08TO0.15

Max1

0.04

0.03

-

-

11.5to13.5

-

-

 

-

430

Max0.08

Max1

Max1.5

0.04

0.03

-

12to14

-

-

 

-

 

Φ 48

(mm)thickness

length

Regular dimension

2.5、2.75、3.0、3.25、3.5、3.75、4.0

 

6

 

custom-tailored

1.0-5.0

 

1-9

 

6.Pictures 

 

Q:Why the height increase of ten centimeters increase in housing ten percent
Increase the cost of ten centimeters increase in housing costs by about three percent
Q:The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q:What is the speed of the falling brush after2.67 s? (Neglect drag forces.) The accelera-tion due to gravity is 9.8 m/s2.Answer in units of m/s.
... v = a t = -9.8 m/s/s * 2.67 s = 26.2 m/s round appropriately When you get a good response, please consider giving a best answer. This is the only reward we get. You may have to wait an hour to award BA.
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:For many years did not renovate the old house, the original is the kind of cement outside the gray, remove the gray + with cement and sand tiles, no glue, this method a square hand fee how much money? The original wall is to take the line, how to deal with. The local master said the line and the socket lifted up temporary hanging, finished tiles to say, can be decorated to electricity, I always feel this method is not safe, there is no better way?
Hello, "farmers from the building, the most important is the quality and safety
Q:Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:my scaffold piercing has been bleeding since yesterday and ive had it done for 3 month what do i do?help?!?
Probably infected. I recommend you see an internist medical specialist for your condition and have them perform a diagnostic test. That way, you can find out the nature extent of the problem and a treatment plan can be formed. Good luck.
Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords