• Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 1
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 2
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 3
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 4
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
10 m.t.
Supply Capability:
15000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

Standard:

ASTM, AISI, DIN, EN, GB, JIS

Place of Origin:

Hebei, China (Mainland)

Brand Name:

yize

Model Number:

yz-7475

Type:

Seamless

Steel Grade:

300 Series

Application:

Construction ,industrial material

Certification:

ISO

Welding Line Type:

Spiral Welded

Thickness:

0.25-3.0mm

Outer Diameter:

6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm

certification:

ISO, ISO 9001

Length:

1m-12m

application:

Fluid Pipe

Finish:

2B (Mill Finish), bright, satin, hairline, mirror ETC

mark:

heat number,material,size,standard

Material:

AISI 201, 202, 304, 304L, 316, 316L and 430

Thickness Tolerance:

0.25-3.0mm

uses:

Construction ,industrial material

2.Packaging & Delivery

Packaging Details:plastic bag for each piece then packed in seaworthy wooden cases
Delivery Detail:30 days

 

3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube


 

1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.

 

2) Standard: AISI, ASTM, DIN, GB, JIS, SUS 

 

3) Dimension: 3-400mm 

 

4) Length: 2-6m or as customer decided

 

5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,

 

6) Packing: Nylon bag or according to client's requirement

 

Terms:

 

1) Delivery term: FOB,CFR, CIF

 

2) Delivery lead time: 10 working days after received T/T or L/C deposit.

 

3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.

 

4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.


4.Product Application:

 

With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet

 

 cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.

 

5.Chemical composition and physical properties:

 

Grade

C

Si

Mn

P

S

Ni

Cr

Cu

Mo

Ni

304

Max0.07

Max 1

Max 2

Max 0.045

0.15to0.35

Max0.11

17.5to19.5

Max 1

-

8to 10

 

304L

Max0.03

Max1

Max2

max0.045

Max0.03

Max0.11

18to20

-

2to2.5

10to12

 

316

Max0.07

Max1

Max2

max0.045

Max0.03

Max0.11

16.5to18.5

-

2to205

 

10to13

 

316L

Max0.03

Max1

Max2

Max0.045

Max0.03

Max0.11

17to19

-

2.5to3

 

12.5to15

410

0.08TO0.15

Max1

0.04

0.03

-

-

11.5to13.5

-

-

 

-

430

Max0.08

Max1

Max1.5

0.04

0.03

-

12to14

-

-

 

-

 

Φ 48

(mm)thickness

length

Regular dimension

2.5、2.75、3.0、3.25、3.5、3.75、4.0

 

6

 

custom-tailored

1.0-5.0

 

1-9

 

6.Pictures 

 

Q:Will the concrete cloth machine and the tower crane is different, long quite like Please explain the structure of the application, 3Q
The role of the tower crane is to a variety of building materials (such as brick, mortar, concrete - also due to small units do not pump, components, etc); turnover materials (such as steel formwork, scaffold tube, etc) The Forearm without a pipe, some pipe is 50mm below the structure of the steel pipe is not connected to each other, the end of a hook Crawler cranes commonly known as crawler cranes, the boom is generally not scalable but can be long, both the boom (commonly known as boom) are able to pitch, no tower, you can I can not see the track, I have seen the largest car crane is the largest weight from 80 tons, I have seen the largest crawler crane is the largest lifting weight of 1350 tons Tower crane (commonly known as the tower crane) can not tilt the general boom, can not be stretched, have a tower, generally can not move, and some can move but on the default rail, can not move the seat on the concrete base The You said something and tower cranes can be too different
Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:A man of mass 74.4 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.9 kg and is 3.9 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? b) What is the tension in the left rope? thanks in advance.
this could be a 2d concern. The moments approximately any factor interior the gadget would desire to stability, in the different case the gadget (scaffold) would rotate. additionally, the vertical forces would desire to stability, or the gadget (scaffold) would translate. it form of feels to me that to the superb from the middle of the scaffold it somewhat is a distance one 6th of the dimensions of the scaffold is comparable to saying 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any factor. i will evaluate the left facet of the scaffold, the place the 2d produced by the left rope is 0. comprehensive M = 0 = scaffold M + guy M + suited rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is considered a factor mass located at its center the strain F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign remedy for F. To get the strain in the different rope, you are able to basically evaluate the vertical forces interior the gadget. on the different hand, you should sum the moments approximately another factor (say, the superb rope). wish this permits.
Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:so im 16 and only got into piecings within like the last year...iv only got my belly done, but iv been in love the scaffold piercing for ages, but im just wondering whether it would look really odd if i got it as it would be the only ear piecing i had, opinions??(and yes if i got it done i would go to a reputable place)
I pierce lots of Industrials on young girls and half of them say its their first piercing! They look great on a plain ear, because they are such a large piercing its good to have ears that arent covered in piercings already because it starts to look too much when you have heaps of piercings in your ears. You just need to be dedicated to it as it can be difficult to heal, so make sure you have a really good think about it before you get it done.
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords