• Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 1
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 2
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 3
  • Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube System 4
Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steeLltube

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
10 m.t.
Supply Capability:
15000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

Standard:

ASTM, AISI, DIN, EN, GB, JIS

Place of Origin:

Hebei, China (Mainland)

Brand Name:

yize

Model Number:

yz-7475

Type:

Seamless

Steel Grade:

300 Series

Application:

Construction ,industrial material

Certification:

ISO

Welding Line Type:

Spiral Welded

Thickness:

0.25-3.0mm

Outer Diameter:

6mm-219mm/10mmx10mm, 6mm-219mm/10mmx10mm

certification:

ISO, ISO 9001

Length:

1m-12m

application:

Fluid Pipe

Finish:

2B (Mill Finish), bright, satin, hairline, mirror ETC

mark:

heat number,material,size,standard

Material:

AISI 201, 202, 304, 304L, 316, 316L and 430

Thickness Tolerance:

0.25-3.0mm

uses:

Construction ,industrial material

2.Packaging & Delivery

Packaging Details:plastic bag for each piece then packed in seaworthy wooden cases
Delivery Detail:30 days

 

3.Seamless Stainless Steel Tube price per ton/ 304 Polished Stainless steel tube


 

1) Grade: 201,202,301,304,304L,310S,316,316L,410,430,etc.

 

2) Standard: AISI, ASTM, DIN, GB, JIS, SUS 

 

3) Dimension: 3-400mm 

 

4) Length: 2-6m or as customer decided

 

5) Condition: Hot Rolled & Pickled, Hot Rolled Black Bar,Cold Drawn,

 

6) Packing: Nylon bag or according to client's requirement

 

Terms:

 

1) Delivery term: FOB,CFR, CIF

 

2) Delivery lead time: 10 working days after received T/T or L/C deposit.

 

3) Payment term: .30% as deposit by T/T, balance will be paid by T/T against the copy of B/L.

 

4) Quality assurance: Mill Test Certificate is supplied with shipment, third Party Inspection is acceptable.


4.Product Application:

 

With bright surface, slight magnetism and no cracks on forming, is widely used in bicycle fittings, kitchen and sanitation tools, goods shelf, pet

 

 cages, gill racks, decorative handles and baskets, food and medical machinery accesses, etc.

 

5.Chemical composition and physical properties:

 

Grade

C

Si

Mn

P

S

Ni

Cr

Cu

Mo

Ni

304

Max0.07

Max 1

Max 2

Max 0.045

0.15to0.35

Max0.11

17.5to19.5

Max 1

-

8to 10

 

304L

Max0.03

Max1

Max2

max0.045

Max0.03

Max0.11

18to20

-

2to2.5

10to12

 

316

Max0.07

Max1

Max2

max0.045

Max0.03

Max0.11

16.5to18.5

-

2to205

 

10to13

 

316L

Max0.03

Max1

Max2

Max0.045

Max0.03

Max0.11

17to19

-

2.5to3

 

12.5to15

410

0.08TO0.15

Max1

0.04

0.03

-

-

11.5to13.5

-

-

 

-

430

Max0.08

Max1

Max1.5

0.04

0.03

-

12to14

-

-

 

-

 

Φ 48

(mm)thickness

length

Regular dimension

2.5、2.75、3.0、3.25、3.5、3.75、4.0

 

6

 

custom-tailored

1.0-5.0

 

1-9

 

6.Pictures 

 

Q:The name of the laws and regulations relating to the building, at least . The The
, Real estate and building regulations 1 Huadong City Real Estate Management on the promulgation of the month 5
Q:PLEASE HELP!!!!!
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety
Q:I'm still at school and if I got my scaffolding done at the start of the summer holidays it would have 6 weeks to heal, I would have to take it out once a week for 2 hours, would I experience any issues?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords