• Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM System 1
  • Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM System 2
  • Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM System 3
Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM

Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: KU48-1

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Couplers

  • Usage: Pipe Clamp

  • Structure: Swivel

  • Standard: BS1139, EN74

  • Workmanship: pressed

  • Surface: Galvanized/painted

2.Packaging & Delivery

Packaging Details:pallet

Delivery Detail:According to order quantity

3.Product Description

Model No: FAS-TB/S

Model Name: Scaffolding Toe Board-Washboard

4.Features:
1) Dimensions (Hx L ):

150x730mm for end

150x 1090/1570/2070/2570/3070mm for side

2) Made of pre-galvanized steel
4) Used in facade scaffold systems
5) Surface: in raw or painting.

5. 

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding Pipe Coupler- Swivel Pipe Clamp CNBM

Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:Sprinkling water on the construction helps to help reduce haze days
Sprinkling the construction site is an effective means to reduce the construction of dust, you can indirectly less haze days
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end.The sca?old weighs 332 N and is 3.5 m long.Assume the window washer stands 1.36 mfrom the left end.What is the tension in the rope on the right?Answer in units of NWhat is the tension in the rope on the left?Answer in units of N
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Please advise the construction industry experts: residential full scaffolding inside the frame how to calculate the number of steel pipe needs, pay attention, I asked how many meters! Or tell me how many meters per square meter of steel pipe? And then attached to the high requirements, thank you For example: now a layer of 1000 square meters area, a total of 10 standard layer of residential buildings, 3 meters high! How to calculate the amount of steel required to do a layer? The amount of steel pipe in meters, or tonnage units.
Steel pipe commonly used specifications for 1m-6m first determine your height and length, width
Q:What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
Bowl buckle structure is generally used as a scaffolding, of course, can also be used as cast-in-place concrete plate template bracket View original post & gt; & gt;
Q:How to carry out fire inspection at construction site construction site (including information and site)
the construction unit should establish fire safety management organizations and voluntary organizations, and clear responsibility and responsibility
Q:In the housing budget in what circumstances calculate the dependent chute and independent ramps? Thank you
Dependent chute and independent chute are calculated by seat, the height of the same with the height of the outer scaffolding
Q:- Construction safety and quality control report for the depth of construction quality and construction safety production, to ensure the safety and use of structural features to prevent the fall, collapse, mechanical injuries and other multiple accidents,
In the late 1950s, oil wells were specially developed for oil
Q:The name of the laws and regulations relating to the building, at least . The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords