• Scaffolding Pipe Pressed Coupler for 48mm diameter CNBM System 1
  • Scaffolding Pipe Pressed Coupler for 48mm diameter CNBM System 2
Scaffolding Pipe Pressed Coupler for 48mm diameter CNBM

Scaffolding Pipe Pressed Coupler for 48mm diameter CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 set
Supply Capability:
30 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: SC

  • Type: Scaffolding Parts

  • Scaffolding Part Type: Scaffolding Couplers

  • Usage: Pipe Clamp

  • Structure: Different type

  • Standard: BS1139/EN74

  • Workmanship: pressed

  • Surface: Galvanized/painted

2.Packaging & Delivery

Packaging Details:Steel Pallets

Delivery Detail:   20-30 days 

3.Product Description

Product Name: Ringlock scaffolding system-Diagonal Brace

 

4.Features:

1. Standard:  Made of 48mm O.D. x 3.2mm thickness high grade steel tube, 1 discal leg 0.5meter, Length: 3000, 2500, 2000, 1500, 1000, 500mm etc. Available, and can be to ordered by you,

2. Ledger: Made of 48mm O.D. x 3.2mm thickness high grade steel tube, length 730mm, 1090mm,1570mm, 2070mm, 2570mm, 3070mm, length can be ordered.

3. Diagonal Brace: made of high strength tube, specification(LXH): 1090x1500mm, 1570x1500mm, 2070x1500mm, 2570x1500mm, 3070x1500mm, 1090x2000mm, 1570x2000mm, 2070x2000mm, 2570x2000mm, 3070x2000mm ect

3. Ring: Made from cast-steel or pressed steel or forged

4. Ledger connection-peg: made from cast-steel,

5. Base screw jack: length 600mmx4.0mm thickness strength tube, length to be order, solid tube available.

6. U head screw jack: length 600mmx4.00mmthickness strength tube with U head plate, length can to be order, solid tube available.

7.  Surface: painted/electro (hot dipped) galvanized or to be order

8.  Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Scaffolding Pipe Pressed Coupler for 48mm diameter CNBM

Q:On my blackberry so bare with me, I got my scaffold pierced on monday, everything fine, monday night I saw a lil blood clot scab thing...being an idiot I picked it, since then its non stop bled on and off, its now wednesday and its bleeding heavily, I don't know what to do, it soaks up pads of tissue in minuets.Anyone have any suggestions? Thankyou x
it truly is no longer solid. Mine by no potential performed that yet per chance its in simple terms bleeding the position u were given it performed or are you picking at it alot? in case your worried bypass to the clinical specialist or call the well being line or perhaps the guy that pierced your nostril! if it hurts and its pink then take it out !!!!! i did not favor too yet i had too reason the girl performed mine with a gun and messed it up.Im getting mine performed again.in case your nostril is undesirable then sparkling it 3 circumstances an afternoon and if it receives worse take it out and proceed cleansing.The an infection can spread. solid success :)
Q:Mine has passed the healing date and i have had another one put in it's been over 2 months since i had it done...but there is still some swelling on the top half of the ear that is pierced...will it go down eventually or is there something wrong with it?
it will eventually go down. industrials can take up to a year to heal. don't worry about it.
Q:A 75kg painter stands on a 5.5m long uniform plank resting on a scaffold. If the plank's mass is 20kg , how close to the left end of the plank can he stand without tipping the plank? ( The scaffold supports are 2.5m apart, and the plank extends beyond the scafold supports, 1.5m on each end.)
The mass of the plank on the left side of the scaffold is: M? = (20 kg) × (1.5 m) / (5.5 m) = 5.45 kg The distance between the scaffold and the center of mass on the left side is: L? = (1.5 m) / 2 = 0.75 m So the torque of the plank on the left side is: T? = (5.45 kg)×(0.75 m) = 4 kgm The mass of the plank on the right side of the scaffold is: M? = (20 kg) × ((5.5 m) - (1.5 m)) / (5.5 m) = 14.5 kg The distance between the scaffold and the center of mass on the left side is: L? = ((5.5 m) - (1.5 m)) / 2 = 2 m So the torque of the plank on the left side is: T? = (14.5 kg)×(2 m) = 29 kgm Now, say the painter stands at X meter on the left side from the scaffold, so the torque added on the left side is: T? = X × (75 kg) The total torque on the left must be the same as the total torque on the right, so (4 kgm) + X×(75 kg) = (29 kgm) X×(75 kg) = (25 kgm) X = 0.333 m That is the maximum distance the painter can move away from the scaffold, so the distance to the end of the scaffold is: D = (1.5 m) - (0.333 m) = 1.167 m < - - - - - - answer
Q:I got my industrial pierced about three days ago. The shop I wanted to go to closed so I went to another one that cost a bit more. The guy who pierced it said to only clean it with warm water, but when I got my helix, tounge webbing and angel bites I was told that all new piercings need disinfectant. What are some disinfectants I could use and am I right by doing this or should I listen to the piercer?
Well you definitely need to use more than just warm water to clean it. Try using something like Provon soap and do sea salt soaks at least twice a day to keep it clean.
Q:Other than it being cheaper and more eco friendly than steel scaffolding, why is bamboo used to make scaffolding in hong kong and china?
Bamboo building were mainly used in HK and still being used. They are cheap, traditional, grow fast, easily decompose, lighter, easy to navigate, and faster. However they are not as strong as steel and have a higher chance of collapsing which is very rare.
Q:Requirements for the current bowl frame. What is the vertical distance, the horizontal distance and the step distance
The vertical distance is the distance between two adjacent vertical bars along the length of the scaffold
Q:I really wanna get one, but i have questions ? i already have a reg top cartilage piercing, so do i need only one more or does it have to be higher/lower? oh and do they have to make the hole bigger for the one i already have? or just the same? thanks :)
They can't use one of the holes you already have. Things won't line up properly and it won't heal. They will make the new hole either higher or lower, depending on how high your cartilage piercing is at the moment. I would assume they would try and make it higher, but it is about what will be best for the piercing.
Q:How much is the erection height of double row scaffold
Two are better than the former.The following are given single row, double scaffolding erection height requirements:
Q:Full house scaffolding height of more than the number of meters experts need to do
According to the "construction safety inspection standards" JGJ59-2011 "and the construction of steel tubular scaffold safety technical specifications" JGJ130-2011, the maximum height of steel tubular scaffold erection allowed is 50 meters, frame erection height of more than 50m, should prepare special construction scheme and not according to the provisions of the organization of experts, approval before implementation.
Q:I had my scaffolding piercing done on tuesday (now sunday) and it is still really painful and sore. But my main concern is that the skin under the bar looks like it's being pushed down and the skin is growing around the bar? Is this bad?
Yes it is bad if I looks as if it has the skin growing around it. I would see your piercer about that.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords