Ringlock Q235/345 Steel Galvanized Product
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Ringlock Scaffolding
Ring Lock system is the latest item up to now. It’s mainly used in ship building, ship repairing, stage building etc.It’s stable, easy-assemble, easy working, safe-using and with big bearing capacity.
Main Features of the Ringlock Scaffolding
Place of Origin | Beijing, China (Mainland) |
Product Name: | Ringlock Scaffolding |
Custom Code | 7308400000 |
Color | Silver, golden |
Surface treatment | Painted,Hot-Dip,Galvanized,Electro Galvanized, Powder Coating |
Material | Q235,Q345.etc |
Package | Customized Package |
Payment Terms | T/T,L/C |
Delivery Detail | 15-25 Days |
Quality Control | IS09001 Certification, Quality Test |
Standard | 48.3*3.25*4000mm |
Ledger | 48.3*3.25*3072mm |
Ledger End | 1.2kg |
Advantages
1)To be erected easily and quickly
2)Installed to different angels with rosettes of
two different hole being positioned there
3)Ringlock scaffolding provides complete flexibility to lock in any angel.
4)Diagonal braces are to be tailored in
accordance with the lengths of vertical and horizontal tubes
Product Show
The modular RINGSCAFF system is characterised by the standardised, fast and simple assembly outlined above.
These procedures are continually repeated in the assembly of the scaffold.
In this way, as many as four ledgers and four diagonals can be attached to one ring! This creates a connection point which can bear very heavy loads.
Specification of Ringlock Scaffolding
The Standards(Verticals) | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
3000 | 3/3.25 | 48 | HDG/Painted | |
2500 | 3/3.25 | 48 | HDG/Painted | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1500 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
500 | 3/3.25 | 48 | HDG/Painted | |
The Ledgers(Horizontals) | ||||
Effective Length(mm) | Tube Thickness(mm) | Tube Diameter | Surface Treatment | |
2000 | 3/3.25 | 48 | HDG/Painted | |
1770 | 3/3.25 | 48 | HDG/Painted | |
1000 | 3/3.25 | 48 | HDG/Painted | |
The Diagonal Brace | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
2411 | 3 | 48 | HDG/Painted | |
2244 | 3 | 48 | HDG/Painted | |
The bracket | ||||
Length(mm) | Tube Thickness(mm) | Tube Diameter(mm) | Surface Treatment | |
730 | 3 | 48 | HDG/Painted | |
Plank | ||||
Effective Length(mm) | Width(mm) | Height(mm) | Surface Treatme | |
2050 | 480 | 45 | HDG | |
1820 | 480 | 45 | HDG | |
3000 | 240 | 45 | HDG | |
2000 | 240 | 45 | HDG | |
1000 | 240 | 45 | HDG | |
Hollow Head Jack And Jack Base | ||||
Length(mm) | Tube Diameter(mm) | Size of Plate(mm) | Surface Treatment | |
600 | 38 | 150*120*50*4 | HDG | |
600 | 38 | 150*150*4 | HDG |
- Q: Specification for bowl scaffold support top rod length of not more than 30cm, which is the standard which page specific ah, too lazy to check out, who knows?
- Specification for bowl scaffold support rod top length of not more than 30cm
- Q: Hello, in a Construction project who is required to check the scaffolding equipment?check the installation? and frequently check the scaffold during the day?is it the Planning supervisor, Contractor, Principle contractor, CDM coordinator or Works manager
- Each construction site is supposed to have a Safety Officer. If that is not the case...The superintendent of the company using and supplying the scaffolding need to comply with OSHA standards at the minimum. The primary contractor will be somewhat responsible to ensure things are properly inspected. The Army Corps Of Engineers insist that the scaffolding be inspected each day prior to use. Should an accident happen you need to make sure all sub-contractors have proper general liability and workers comp insurance. Otherwise total responsibility goes to the primary contractor.
- Q: What are the specifications for the setting of the wheel - fastener scaffold
- Wheel buckle scaffolding is a reference to the national standard GB24911-2010.
- Q: Everybody calls it either one, i want the one that goes across the top of your ear. Would it be safer to have two helix done instead of putting the bar straight in and getting the actual piercing or should i get two helix and put a bar in once it has healed? i would ask the piercer to line the two up. ive heard that industrails go wrong alot if a bar is put right in.
- I had a monroe piercing about 2 years ago. I think they look fab (little twinkling diamond sort). I went to a fully licenced piercing shop. They will draw a dot and ask if it's in the right place. Then a spray or numbing cream is applied inside and outside of the upper lip. The area is tightly clamped and a piercing is made with a sterile needle. Then the stud is inserted. The back (flat disc) is then screwed onto the bar. The process takes only a matter of minutes and you'll feel a second of pain that's all. Aftercare: Bath area with salted distilled water or even better Savlon Wound Wash after 2 weeks you need to visit the shop for a smaller bar to be inserted as the swelling will have gone done. Unfortunately my piercing never healed right (don't let that put you off as I do have very sensitive skin and reactions to all sorts of things) and it always looked a bit like a red zit so I decided to take it out. Also be prepared for very mixed reactions as some liked it and others hated it. Anyway good luck girl, go and get it done :)
- Q: What is the horizontal spacing of the wall of the bowl buckle scaffold
- Need to give you a standardized system to learn about ah? The arrangement of the wall parts shall meet the following requirements: (1) should be close to the main node, the distance from the main node should not be greater than 300mm;
- Q: i have an industrial piercing but the top piercing(scaffold) has a bump on it making it hard to find the hole to put other jewerly in besides the bar. how do i get rid of the bump?
- It is probably hypotrophic scarring. Cartilage piercings, especially all types of industrials, are prone to this type of scar. Hypotrophic scarring is a bump surrounding the exit hole, the same color as your skin. It may feel hard, but often are not painful. They are usually caused by jewelry putting pressure on the piercing, and the body responds by scarring. Hypotrophic scarring is often due to pressure on a piercing. Changing your jewelry is usually the best move. If the scar is around a ring or other curved jewelry, switch to something straight, like a barbell. If it's on an industrial, put individual jewelry in each piercing. Consult your piercer for jewelry changes in unhealed piercings. Time and oil massages often improve scarring. If hypotrophic scars don't improve after some time, steroid injections and certain topical creams may help. Consult a doctor to see if this is an option.
- Q: at what age can you get a scaffold/industrial piercing in england without parental consent?
- there actually are no laws in the UK about piercings other than the genitals and female nipples (you have to be 16 to get pierced in any of those locations) it is up to individual studios on what age they don't require parental consent. the best thing to do would be to contact your local shop.
- Q: What are the main types of bowl buckle scaffold
- The main load is the weight of people, and some building materials tools, etc.
- Q: How much is the erection height of double row scaffold
- Two are better than the former.The following are given single row, double scaffolding erection height requirements:
- Q: I recently had a scaffold piercing. It seems to be healing well, however it is still sore.My body tends to reject piercings, so is there anything I can do to help it heal?I am currently using saline solution taking vitamins.
- your body wont reject it cuz its cartilage and it wont reject. its just sore becuase you just go a while ago so it will hurt of a couple of weeks
Send your message to us
Ringlock Q235/345 Steel Galvanized Product
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 10 m.t.
- Supply Capability:
- 10000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords