Ring-lock Scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


                                                                                              Got 23 national patents


   Products Introduction & Application:
During construction, scaffolding shoring system has great difference in designing and manufacturing, as they have different loading mode and magnitude on the vertical standard. To distinctively use them in the construction can ensure security, reduce steel consumption,  and save assembly & dismantling time and freight cost.
M60 is the professional supporting system invented and designed by our Group by introducing the new technology and notion and combining the Chinese construction practices and features. M 60 is specially applicable to the formwork supporting of high large bridge, widely used for the bridge construction of highway, railway and high-speed rail.
Learned advanced technology and idea and considered Chinese particular traits and habits, we developed 2 types of formwork-supporting system: M60 and M48. M60 is applies for exterior wall construction, ship construction, large industrial construction, stage construction, as well as light-load house roof supporting system.


Features:

(1)Five Advantages
① Greatly Reduce Steel Consumption
Adopt many patented designs like high-strength low-alloying steel tube, rosette joint, self-lock wedge and so on. The tower structure with standard bay brace can make the load capacity of vertical standard be as much as 20T, which greatly reduced steel consumption during the construction. Compare to cup-lock scaffolding, M60 can save over 2/3 steel amount. For instance, building a bridge with 180m length, 50m width and 11m height, a cup-lock scaffolding need 3,473 ton steel, while M60 need only 919 ton, saving 74% steel. Reducing steel quantity is not only "low-carton green", but also a safe and reliable solution for construction cost saving.
②Time efficient during assembly and dismantling
Compare to cup-lock scaffolding, M60 formwork supporting system need less materials, less assembly & dismantling time and cost. Also for above instance, cup-lock scaffolding need 558,000 scaffolding pipe, while M60 needs only 10, 000 units with 82% time efficient. Therefore, our patented M60 can improve construction efficiency, reduce high-altitude working to guarantee workers' safety.
③Save Freight Charges
Still for above instance, if the freight charge is USD $30/TON, M60 can save USD $83,000.
④20-year Product Lifetime
With hot dipped galvanized processing, the product can be used over 20 years. It completely eliminate the unsafe trouble that caused by rested supporting system, and save cost.
⑤Worry-free Recycling Programme
Provide worry-free recycling programme, the customers can enjoy zero-risk investment.

(2)Ladder Scaffolding system

Ladder scaffolding is stable and reliable, its level access way keep workers safety and flexibility when they walk up and down the stairs. Convenient for transportation, storage and worksite management, it takes standardized management for construction.

(3)Professional Welding Technology

As welding technology is the key to safety of scaffold and shoring system, we import advanced specially designed full-automatic welding, and our welders are regularly trained and assessed by foreign exports. Our product quality is guaranteed.


Parameters:



Projects:


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Muslim scaffolding question for dbq? Please help.?
It seems like he is describing them like he respects them. He is idolizing their humility and pride. Is DBQ a Document Based Question? just wondering, if you are in APH, good luck! :) Addition: I found your post responding to this one. lol Hopefully this helped! I remember those DBQs, kinda a pain. lol....but it was a fun class and it is well worth taking!
Q:my scaffold piercing wont stop bleeding, really scared, please help?
it truly is no longer solid. Mine by no potential performed that yet per chance its in simple terms bleeding the position u were given it performed or are you picking at it alot? in case your worried bypass to the clinical specialist or call the well being line or perhaps the guy that pierced your nostril! if it hurts and its pink then take it out !!!!! i did not favor too yet i had too reason the girl performed mine with a gun and messed it up.Im getting mine performed again.in case your nostril is undesirable then sparkling it 3 circumstances an afternoon and if it receives worse take it out and proceed cleansing.The an infection can spread. solid success :)
Q:Shear strength of steel tubular scaffold
The rail is made of steel plate, the load is 0.11kN/m, the safety net load is 0.0050kN/m2. Under the foot of the small cross bar on the top of the big bar, and a small bar between the main node. Basic wind pressure 0.35kN/m2, height variation coefficient 1.2500, shape coefficient of 1.1280. The standard value of bearing capacity of foundation is 190kN/m2, the basal area is 0.250m2, and the coefficient of bearing capacity is 1.
Q:my scaffolding piercing.. read more?
do no longer rotate it and end utilising hydrogen peroxide in basic terms use heat water blended with sea salt or anti-bacterial cleansing soap(dial),saline answer(touch purifier),h20ocean piercing spray discovered at hottopic. you are able to turn the bar to scrub it to get the different area clean yet never rotate it. it's going to make the piercing healing technique alot slower and it ought to reason issues.
Q:Can you shorten the steps of the bowl buckle scaffold
The step distance of the bowl buckle steel tube frame must be determined through calculation; for example, the vertical distance of the vertical rod is 120
Q:Scaffold piercing question..Please help?
Mine really hurt, but I didn't scream. For the first few days I couldn't sleep on it, I noticed bubbles forming around the ends but, that's normal with piercings with cartilage. Make sure you go somewhere who uses the tube for the needle. When I went, since my ears were small, he used two different needles it lasted too long. But it wasn't worse than my tragus so, I was able to accept the pain.
Q:I'm thinking about using commercial industrial scaffolding for my next deer stand.?
I don't see why not. It would certainly be sturdy enough, just be sure to secure it to the tree. I've known guys that have made them out of electrical conduit so I don't see why scaffolding wouldn't work.
Q:Did the pageantry of pain at the scaffold actually deter people of crimes during the 18th century?
Nope. There are plenty of accounts of people sentenced to death for crimes (such as pickpocketing) that they committed AT somebody else's public execution.
Q:how to know if the scaffolding piercing would suit me?
These days piercings are so common they'll suit anyone. Not everyone has enough room in their ear for a scaffolding or industrial piercing, so check with a piercer first. It's better to have two separate bars in while it's healing, because if you think about it, the long bar will make sleeping so uncomfortable and will put pressure on the piercings which will not allow it to heal to the best of your body's ability.
Q:I got my scaffolding piercing yesterday?
Yeah, your body is reacting to having a giant metal rod through it =] Its likely that in your sleep youve rolled onto it and that has caused the piercing to bleed. You can try putting a pillow next to you to aviod you rolling over. Otherwise dont sweat it just keep cleaning twice daily and youll be fine.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range