• Scaffolding System--Scaffold Top Frame with layher style CNBM System 1
  • Scaffolding System--Scaffold Top Frame with layher style CNBM System 2
Scaffolding System--Scaffold Top Frame with layher style CNBM

Scaffolding System--Scaffold Top Frame with layher style CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-TIF

  • Type: Scaffolding Parts, Scaffolding top frame

  • Scaffolding Part Type: Scaffolding Frames

  • Material: Steel

  • Surface: Galvanized or to be ordered

  • Function: Work as top rail

Scaffolding System--Scaffold Top Frame with layher style CNBM

Scaffolding System--Scaffold Top Frame with layher style CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: FAS-TIF

Product Name: Scaffolding System--Scaffold Top Interim Frame 

4.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube, Specification(mm): 732(W)x1000(L) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q: a paintbrush falls from a scaffold takes 3 sec to hit the ground. How high is the scaffold? Explain pls!?
Its 3 seconds high, but you would need to know how heavy the paintbrush is, could be as heavy as an anvil dropping from a building. (The scaffold would be as tall as the building)
Q: Would like to ask you under the construction of the rainy season, what measures ah? Teach the next sprinkle
pay close attention to weather forecast, do a good job in Taiwan flood prevention work, if necessary, should be reinforced in the construction of the project do a good job of building materials, rain and moisture work the construction site of the road, the facilities must be smooth drainage, as far as possible rain to stop the water, to prevent the ground water into the basement foundation, the basic project should do a good job slope anti-skid and anti-collapse in the rainy season before doing live housing, equipment, drainage and rain measures Ready to use the water pump and related equipment, prepare the right amount of plastic cloth, linoleum and other rain material encountered heavy rain should immediately stop the pouring of concrete, and has been pouring silicon parts of the plastic film covered all mechanical and electrical equipment to build the protective shed to be strong, and take rain, flood prevention measures, installation of grounding safety devices, electrical box leakage protection device must be sensitive and reliable, and often check the construction site of the tower crane, construction elevator, outside the scaffolding need to install lightning protection device, grounding resistance is not greater than 4Ω the rainy season construction to do a good job of anti-skid reinforcement work all mechanical equipment after the rain should first check whether the circuit is intact Dry and so on
Q: The obvious would be helpful too!
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q: Construction technology measures fee is directly into the sub - project costs
Construction technology measures fee is not directly into the sub-project costs, because the construction technology measures fees are measures fees rather than sub-project costs, measures fees, refers to the completion of the project construction, occurred in the construction and construction The cost of non-engineering entity projects during the process consists of construction technical measures and construction organization measures
Q: Im pretty sure that the 3 characters are Reverend Mr. Wilson, Governer Bellingham, and Mistress Hibbins. The hard part is finding what they represent.
First I would like to acknowledge that this question is from the book: The Scarlet Letter by Nathaniel Hawthorne
Q: Can the fifteen typhoon blow up the three - storey house?
The residents in the home against the typhoon to pay attention to what】? To put away a variety of hanging objects inside and outside the house to prevent the wind falling objects wounding; garden flowers with a bracket to protect, pruning branches to prevent the destruction or damage to the roof; The need for doors and windows, and add nailed wood; check the line, ready to flashlight, candles, storage of drinking water to prevent power off the water; more than a day food and vegetables, not necessary to go out
Q: A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q: for 10 sq. meters = ? h/sq. m. and how many person need to do the job?
It depend upon availability sorting of ledger to be used.If prop ledger has been transported sorted then three person can do 10 sqm in maximum 3/4 hour .i.e.0.075 h/sqm
Q: How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q: 2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches