• Scaffolding System--Scaffold Top Frame with layher style CNBM System 1
  • Scaffolding System--Scaffold Top Frame with layher style CNBM System 2
Scaffolding System--Scaffold Top Frame with layher style CNBM

Scaffolding System--Scaffold Top Frame with layher style CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t
Supply Capability:
3000 m.t/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAS-TIF

  • Type: Scaffolding Parts, Scaffolding top frame

  • Scaffolding Part Type: Scaffolding Frames

  • Material: Steel

  • Surface: Galvanized or to be ordered

  • Function: Work as top rail

Scaffolding System--Scaffold Top Frame with layher style CNBM

Scaffolding System--Scaffold Top Frame with layher style CNBM

2.Packaging & Delivery

Packaging Details:pallet

3.Product Description

Model No: FAS-TIF

Product Name: Scaffolding System--Scaffold Top Interim Frame 

4.Feature:

1. Made of Φ48.3mm x 3.20mm thickness steel tube, Specification(mm): 732(W)x1000(L) etc.

2. Surface: painted/cold (hot) dipped galvanized or to be order

3. Also can manufacture it as your requirement

Ring   Lock System Scaffold Standard / Verticals

Model

Description

Weight(kg)

Weight(lbs)

AR.S.3000

Ring Lock Standard 3000mm (9'10")

14.41

31.77

AR.S.2500

Ring Lock Standard 2500mm (8'2")

12.12

26.72

AR.S.2000

Ring Lock Standard 2000mm (6'6")

9.82

21.66

AR.S.1500

Ring Lock Standard 1500mm (4'11")

7.53

16.60

AR.S.1000

Ring Lock Standard 1000mm (3'3")

5.24

11.55

AR.S.500

Ring Lock Standard 500mm (1'8")

2.94

6.49

 

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Q:2009 and 2010 construction of secondary construction division of the exam questions and answers, Jiqiu ~!
(Construction project) single multiple choice questions (a total of 20 questions, each question 1 points
Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
That it is what to do with it, for home improvement, then, in the end how much help? Need to pay attention to a few points:
Q:Seeking construction machinery safety supervision papers can be greater than 100 words
Seeking construction machinery safety supervision papers can be greater than 100 words
Q:Renovation of construction guidance? (Refers to the carpentry, painters, mud and other approach to the entry. Tooling)
First, into the construction site personnel safety production notes
Q:Seeking real estate development project emergency rescue plan, the word asked a little more. Thank you
2 Hazard Analysis 21 Project Overview (omitted) 22 Hazard Source According to the characteristics of the project engaged in the project, the following projects are mainly mechanical equipment, electrical welding, aerial work and other construction
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
Especially when the project quality accident and other accidents need to be investigated, the supervising enterprise or the supervisor is often in a passive state of fear or fear , With the resignation of life to describe the situation at this time and then appropriate
Q:Can the fifteen typhoon blow up the three - storey house?
Strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:Construction scaffolding erected what is the standard, there is no template can refer to it?
scaffolding load shall not exceed 270kg / m
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products