Erect scaffolding Steel Construction company cheap price CNBM

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
10 m.t.
Supply Capability:
3000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Quick Details

  • Model Number: XMWY-0001

  • Material: q235

  • Height: adjustable

  • Surface Treatment: electroploretic painted

  • Technology: welding Automatic

  • OEM: provide

  • install: convient,easy and quick

  • feature: no need cuupler used,reduce olsses rate in construction

  • reused: at least 6 years

  • Certification: ISO9001.ISO18001.ISO14001

  • Market: worldwide

2.Packaging & Delivery

Packaging Details:

Delivery Detail:

steel bracket /suitable for shipment

15-20 days

Erect scaffolding Steel Construction company cheap price CNBM

3.Brief Description

Saving timber, time and laber

Easy assemble and  stable

Q235 steel with electrophoretic treatment

OEM is availble

Auto-Carbon Dioxide arc welding

4.Product Description

Make up of Different sizes of vertical props and horizontal props.

Free size, suitable for any height by connecting different size vertical props together;

Easy operation, working under correct direction will be competent for the work;

Working load:450kg(max);

Rigorous quality control, reused for more than 300 times; 

Approved by ISO9001, ISO18001 and ISO14001;

Make the construction site neat and clear, improve the project quality. 

5.Slab Formwork System(shoring)

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Will the concrete cloth machine and the tower crane is different, long quite like
Forearm (long horizontal part) with more than 125mm of the pipe, and there is drooping hose (a bit like elephant nose, huh)
Q:I would like to know what the scope of responsibility for the construction engineering supervision is specific
The scope of project supervision responsibility should mainly cover two aspects: one must involve the project itself, the site management is different from the project management, the former is the contractor's responsibility, the latter is the responsibility of the supervision interval, and the project itself has nothing to do with the responsibility of the accident , If the accountability of enterprises or supervisors is not based on the responsibility Such as temporary construction, temporary electricity, erection of scaffolding, loading and unloading of various building materials, on-site transport equipment, etc, does not constitute the project itself, so even if the accident occurred, should not be held accountable or supervisory staff responsibility Second, it must involve the quality of the project, because the owner is the first person responsible for the quality of the project, the project supervision enterprises as a social intermediary service organization, its power, responsibility and obligation is derived by the owner commissioned by any supervision business can not exceed the owner commissioned Responsibilities and new powers and obligations Therefore, the supervision of enterprises not only to bear the corresponding responsibility for the quality of the accident, but also due to the quality of the accident caused by accidents, including accidents, including other accidents
Q:There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ​​the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:What is the difference between a steel pipe stent and a steel scaffolding? The
Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads
Q:significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
maybe because her partner in crime was in the crowd and she didnt give- that takes some big balls
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:How to carry out fire inspection at construction site construction site (including information and site)
How to carry out fire inspection at construction site construction site (including information and site)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range