Steel Scaffolding Shoring props

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
180000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Product name: scaffolding prop

Type:italian ,German,Spanish,Middle East prop, steel pipe surpport.

Adjustable height:0.8-5.5m

Pipe/Tube tickness:1.5mm-4mm

Innner Diameter:40mm,48mm,etc.

Outer Diameter:48mm,56mm,60mm,etc.

Plate type:square,flower/clover,U-head

Nut type: single handle(common,7-style, big 7-style),Cup-style/Double handle

Pin type:line stright with metal cap,line straight without metal cap,chain,G-style

Plate size:120*12*4mm,120*120*5mm,140*140*5mm/5.5mm,etc.

Surface treatment: painted,galvanized,powder coating

Color:orange,red,blue,green,white,etc.

OEM ACCEPTABLE


Fast delivery wihtin 30days

Professional and reliable

We are specilized in various kinds of steel props, the goods are in high quality and reasonable price.In case you are interested in our products, please do not hesitate to contact me.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:I need to know if these company is hiring scaffold builders Mobly Inc OKorder.com?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:There is no shelter outside the scaffolding project has been accident accident case
When the construction unit dismantles the top steel formwork, the 18 steel pipes (4m long) and the fasteners are removed to the hanging plate of the frame, and five workers fall from the roof with the hanging plate
Q:What would you like to ask?At what height do scaffolds have to be engineered?
At all heights...they are engineered as a system.
Q:What is the difference between a steel pipe stent and a steel scaffolding? The
Template support and scaffolding are force components can be wood structure, steel structure and prefabricated concrete structure, which is classified according to their use of the general should not share the same structure, so as to avoid the operation of the construction process caused by the template shaking and affect the quality of the project The In general, the template support is through the template to bear the relevant load from the concrete; and scaffolding to bear the construction workers, equipment and construction materials and other loads
Q:What are the measures in the rainy season? What precautions must be done?
reasonable organization of construction arrangements, so that sunny day to pay attention to outdoor work, rain arrangements for indoor work
Q:On the issue of compensation after the event of force majeure
It is the same as the construction machinery It is the equipment and facilities that guarantee the normal construction The cost of the construction shall be borne by the contractor For example, due to heavy rain caused by just a brick wall soon collapse, then restore the cost of the wall by the development between the commitment.
Q:A man is 2 ft from 1 end of a 6 ft plnk spprted at each end by scaffold. How much wght is spprted at each end?
the 4 ft end will support 66,66% of the weight and the 2 ft end will support 33,34% of the weight
Q:Sprinkling water on the construction helps to help reduce haze days
to strengthen the possible production of dust material management, bags of cement, fly ash, lime and other handling and use of the process, should avoid falling from the height, Put, should not be forced to beat in the cutting tiles, concrete and other bulk materials used wet method the construction site of the road, gravel and other building materials yard and other operating areas, continuous wet ground in the dry, often sprinkle water, keep the dust is not up bulk materials, construction waste must be in accordance with the provisions of the implementation of vehicle closed transport, loading and unloading is strictly prohibited volley scattered To strictly control the dust of the mixing machine Scaffolding and other facilities to be removed after the first dust removal, and to be removed when someone was monitoring safety and environmental protection Second, the dust management living area canteen stove as far as possible the use of liquefied petroleum gas, gas and electricity, shall not use wood and bamboo, etc, to reduce dust pollution the site is strictly prohibited incineration of waste and waste materials and linoleum, plastic, etc, in person to clean up garbage the scene is not allowed to melt asphalt, to prevent emissions and dust pollution the scene of cement into the library to prevent dust, pay attention to control the cement library purchase volume Third, the sound of environmental management (a) sound environmental management strict control of construction noise, noise emissions should be consistent with the state's "construction site environmental noise emission standards" (GB-90) should be scientific and reasonable arrangements for operating time, must be at night construction, according to the provisions of the construction permit, reduce construction noise
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range