• Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM System 1
  • Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM System 2
  • Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM System 3
Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM

Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
20 m.t.
Supply Capability:
3000 m.t./month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Quick Details

  • Model Number: FAD-S

  • Material: Steel/Aluminium

  • Surface: Paint/Galvanized

  • Type: European Frame Scaffolding

  • Certification: CE

  • Standard: AS/NZ 1576

2.Packaging & Delivery

Packaging Details:Pallet

3.Product Description

Model No: FAS-S

Model Name: Speedy Scaffolding System

 

4.Features:

1. Made of high strength steel tube
2. Including:

1) Frame: 2000/1500/1000mm(H)x732mm(W)

               1000/666mm(H)x732mm(W) with connector

2) Clamp Horizontal: 1572/2072/2572/3072mm(L)

3) Single Beam: 700/1056/1540/2040/2540/3040mm(L)

4) Double Beam: 1540/2040/2540/3040/4112mm(L)x435mm(W)

5) Brace: 2824/3209/3632mm(L) with single clamp

              4433mm(L) with double clamp

6) Safety Gate: 696mm(W)x464mm(H)

7) Steel Plank: 690/1046/1530/2030/2530/3030mm(L)x320mm(W)

8) Aluminium platform ladder: 2530/3030mm(L)x610mm(W)

3. Surface finish: painted/electro (hot dipped) galvanized or to be order

4. Also can manufacture it as your requirement.

5.

Ring   Lock System Scaffold Bay Brace / Diagonal Brace

Model

Description

Weight(kg)

Weight(lbs)

AR.DB.3050x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.87

23.96

AR.DB.2745x2000

Ring Lock Bay Brace 3050x2000mm (10')

10.24

23.96

AR.DB.2440x2000

Ring Lock Bay Brace 2440x2000mm (8')

9.62

21.20

AR.DB.2130x2000

Ring Lock Bay Brace 2130x2000mm (7')

9.03

19.91

AR.DB.1830x2000

Ring Lock Bay Brace 1830x2000mm (6')

8.51

18.76

AR.DB.1520x2000

Ring Lock Bay Brace 1520x2000mm (5')

7.91

17.45

AR.DB.1220x2000

Ring Lock Bay Brace 1220x2000mm (4')

7.62

16.80

AR.DB.1150x2000

Ring Lock Bay Brace 1150x2000mm (3'10")

7.53

16.61

AR.DB.1065x2000

Ring Lock Bay Brace 1065x2000mm (3'6")

7.44

16.41

AR.DB.910x2000

Ring Lock Bay Brace 910x2000mm (3')

7.29

16.07

AR.DB.650x2000

Ring Lock Bay Brace 650x2000mm (2'2")

7.08

15.62

AR.DB.610x2000

Ring Lock Bay Brace 610x2000mm (2')

6.90

15.21





AR.DB.3072x2000

Ring Lock Bay Brace 3072x2000mm

10.95

24.14

AR.DB.2572x2000

Ring Lock Bay Brace 2572x2000mm

9.89

21.81

AR.DB.2072x2000

Ring Lock Bay Brace 2072x2000mm

8.93

19.69

AR.DB.1572x2000

Ring Lock Bay Brace 1572x2000mm

8.10

17.86

AR.DB.1400x2000

Ring Lock Bay Brace 1400x2000mm

7.86

17.33

AR.DB.1286x2000

Ring Lock Bay Brace 1286x2000mm

7.71

17.00

AR.DB.1088x2000

Ring Lock Bay Brace 1088x2000mm

7.47

16.47

AR.DB.1036x2000

Ring Lock Bay Brace 1036x2000mm

7.41

16.34

AR.DB.1020x2000

Ring Lock Bay Brace 1020x2000mm

7.40

16.32

AR.DB.880x2000

Ring Lock Bay Brace 880x2000mm

7.26

16.01

AR.DB.732x2000

Ring Lock Bay Brace 732x2000mm

7.14

15.74





AR.DB.3000x2000

Ring Lock Bay Brace 3000x2000mm

10.77

23.75

AR.DB.2500x2000

Ring Lock Bay Brace 2500x2000mm

9.74

21.48

AR.DB.2000x2000

Ring Lock Bay Brace 2000x2000mm

8.80

19.40

AR.DB.1500x2000

Ring Lock Bay Brace 1500x2000mm

8.00

17.64

AR.DB.1000x2000

Ring Lock Bay Brace 1000x2000mm

7.38

16.27





AR.DB.2400x2000

Ring Lock Bay Brace 2400x2000mm

9.55

21.06

AR.DB.1800x2000

Ring Lock Bay Brace 1800x2000mm

8.47

18.68

AR.DB.1200x2000

Ring Lock Bay Brace 1200x2000mm

7.60

16.76

AR.DB.900x2000

Ring Lock Bay Brace 900x2000mm

7.28

16.05

6.What is considerations of Scaffolding installation?

There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

(1) scaffold frontage hurtful to prevent falling objects protection is required.

(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

Layher Speedy Scaffolding System with AS/NZ 1576 standard CNBM

Q:Such as the title, raw materials and structural parts What is the difference, how to divide?
It is the main component form of a house
Q:There is a 6.0-kg pail of paint to one side.How close to the left end can he approach safely? How close to the right end can he approach safely? Can someone help me with this problem, I keep working and reworking it and coming to the same answer. I must be consistently making the same mistake. If someone can help me work through it I would really appreciate it. The answers I got were:Left: dmin, left = .54mRight: dmin, right = .77m
At the threshold of danger, the tension on the far rope reaches zero. (a) Distance from left edge = x; then summing moments about the left rope gives ΣM = 0 = 71.0kg * g * (1m - x) - 22.0kg * g * 2.0m - 6.0kg * g * 1m The g term cancels, and the rest solves to x = 0.296 m ? (b) Distance from right edge is X; summing about the right rope, and knowing the g terms will cancel, ΣM = 0 = 22.0kg * 2m + 6.0kg * 3m - 71.0kg * (1m - X) leads to X = 0.127 m ? Hope this helps!
Q:The name of the laws and regulations relating to the building, at least . The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q:Will the equipment based on the beam column and other structures, can not be poured once completed, should be set up civil construction or fixed?
The following model for your reference, the project budget is to determine the project cost and work, material consumption of the document, is the basis for assessing the economic investment
Q:What is the difference between a steel pipe stand and a steel pipe scaffold for pouring a bridge structure concrete? The The Now most of the construction units will be combined into one, and this is reasonable? The The
If you can "combine", it is a good thing, you can reduce the type of components and models, to improve the use of its turnover, thereby reducing the project cost
Q:Two painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N. 1 painter is standing 2.0 mg from the left end and 1 is standing .50 mg from the right end. The scaffold weighs 285 N. What is the tension in the 2 cables supporting the scaffold?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j
Q:What is the most important safety hazard at the construction site?
Civilized construction Site fencing Some works in the urban area of ??the main section of the site is not set above the 25m fence some site fence material is not strong, unstable, not clean, do not meet the local aesthetic requirements
Q:A man of mass 60.3 kg stands on a scaffold supported by a vertical rope at each end. The scaffold has a mass of 21.5 kg and is 2.3 m long. Suppose the man stands to the right from the middle of the scaffold that is a distance one sixth of the length of the scaffold. What is the tension in the right rope? Left Rope?Can someone please explain HOW you do this question!? Thanks!
this is a 2d concern. The moments approximately any component interior the gadget could desire to stability, in any different case the gadget (scaffold) might rotate. additionally, the vertical forces could desire to stability, or the gadget (scaffold) might translate. it style of feels to me that to the spectacular from the middle of the scaffold this is a distance one 6th of the dimensions of the scaffold is the comparable as announcing 2-thirds from the left-edge of the scaffold. The moments could be summed approximately any component. i will evaluate the left edge of the scaffold, the place the 2d produced by utilising the left rope is 0. finished M = 0 = scaffold M + guy M + spectacular rope M 0 = 23.7kg*9.8m/s^2*(3.1m/2) + 60.1kg*9.8m/s^2*(2*3.1m/3) - F*3.1m wherein: the scaffold is assumed to be a component mass placed at its middle the tension F acts opposite to the load of the guy and the scaffolding, and subsequently has -ve sign sparkling up for F. To get the tension in the different rope, you may basically evaluate the vertical forces interior the gadget. besides the fact that, you're able to desire to sum the moments approximately another component (say, the spectacular rope). desire this enables.
Q:On the issue of compensation after the event of force majeure
The cleaning and repair costs of the works do not include scaffolding
Q:I need to know if these company is hiring scaffold builders Mobly Inc okorder ?
This company is hiring that company for those who buys them for that thing, from now and then!!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords