ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver for Sale
Lower Energy Consumption: | |
>>We use variable hydraulic systems with low loss and constant power in this series of products, so that energy consumption decreases by 30% and working efficiency increase by 60%. |
High Efficiency: | |
>>To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. |
High Reliability: |
>>To ensure the high reliability of our products which engineering machines should possess, we improve the design and use very reliable materials or components which we select carefully in the process of purchasing. |
|
Convenience in dismantling, transportation and maintenance: |
>>Since we have constantly improved our design of pile drivers for more than 10 years, every part of the machine is easy to be taken apart, which provides convenience in transportation and maintenance. |
|
Multi-function: |
>>Our products are multi-function static hydraulic pile drivers with embracing pile driving, top-pressing pile driving or both at the same time because they are well combined with each other. |
Systemization and Maximization: |
>>Our company has developed 14 models of pile drivers with the capacity of 60 tons to 1200 tons and each model is classified into 4 kinds according to its function with the maximum tonnage of 1200. |
|
Flexibility in Designing: |
>>To keep up with the development in the engineering machinery of the world, we will integrate all useful high technologies from machine-building, electricity, hydromechanics and electronics into our products and meet different individual needs of our customers. |
|
Two Patents: | |
>>The design of inverted cylinder as a supporting leg which avoids the radial force on the piston extends the life-time Of the cylinder. |
Parameter/Model | ZYC800 | |
---|---|---|
Rate piling pressure(KN) | 8000 | |
Piling speed(m/min) | Fast | 6.8 |
Low | 10.2 | |
Piling stroke(m) | 1.9 | |
Pace(m) | Longitudinal | 3.6 |
Horizontal | 0.7 | |
Angle range(°) | 11 | |
Rise stroke(m) | 1.2 | |
Square pile(mm) | Max | 550 |
Circle pile(mm) | Max | 600 |
Side piling(mm) | 1420 | |
Corner piling space(mm) | 2850 | |
Lifting weight(t) | 16 | |
Pile hanging length(m) | 15 | |
Power(KW) | Piling | 141 |
Lifting | 30 | |
Main dimension(m) | Work length | 14.00 |
Work width | 8.32 | |
Transpot height | 3.15 | |
Total weight(t) | 800 |
FAQ
1.Which payment terms can we accept?
Normally we can work on T/T term or L/C.If you choose T/T,30% payment is required in advance and 70% balance shall be settled before shipment often,it rang a little.
2.How long will our price be valid?
We are friendly dealer, never greedy windfall profit, our price remains stable,except the exchange rate and the increasing labor cost and material cost.
3.What are our advantages compared with manufacturers?
a.Detailed training-We can provide training services to different users. The training sessions include product training,operating training, maintenance know-how,standard and so on to fulfill your individual needs.The training can be conducted at client’s site.
b.Available after service-With our global distributor network, you are guaranteed with fast deliveries and services if you submit your requests.
Company Information
China National Building Materials Group Corporation is the full name of CNBM, which is one of the largest state-owned group in China. In 2013, the total asset of CNBM exceeds US$60 billion dollars with a total staff of 180,000. CNBM is listed in the World Top 500 Enterprises!
CNBM International works as the international platform for CNBM Group. In 2013, our total sales income was more than US$16.8 billion dollars.Every year we import large quantity of iron ore, coking coal and thermal coal etc from India, Brazil, Australia and Russia and other countries.ld'>Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
Our major responsibility is international marketing of different construction machinery & formwork, including lifting machinery, concrete machinery, earthmoving machinery, brick/block machinery; steel frame formwork, H20 timber beam formwork, aluminum formwork etc.
- Q:I have learned how to drive a pile driver. I want to know what the salary is. How can I find a job in the future?
- I drive a pile driver. What kind of pile driver do you learn?
- Q:Is there an operation certificate for percussive drill driver?
- Connected by the braking device and the automatic operation mechanism; the automatic operation mechanism through the transmission device and the winding part is fixedly connected; the main frame is connected with the chassis hinge, the main frame on both sides are fixedly connected with the strut, to control the tilt angle of the main frame and increase its stability;
- Q:My family from the building, a three storey, only two and half layer design now, frame structure and prefabricated panels, a total of three half empty, with the inner diameter of the air is piling machine, 30CM in the field, with an average depth of 6 meters, I asked how wide a safe? The master said, "one meter, one. I feel a little too dense."! Ask everybody specially!How many meters can I use if I choose an empty 80CM pile driver? My maximum span is 4 meters, and some are 3 meters and 2 meters. Because the master is how many piles count money, so there is little doubt!
- Under normal circumstances, only in the bottom of the structural column to the base of the force transmission area, piling, three layers of self building (small span), each column at the bottom of the general arrangement of 1-3 piles, but the depth of the pile should be determined according to the local geological conditions. The spacing of the piles is usually 3-3.5 times the diameter.
- Q:Why should the pile foundation be excavated after the pile driving?
- The construction of the pile foundation shall be done by piling and excavating the earth as follows:The first excavation, construction and basement, excavation depth from plus or minus 00 may have a depth of 4 meters, 4 meters below the ground, the general quality is difficult to ensure, at this time it is difficult to support the ground operation requirements, especially when the mechanical operation. It is difficult to estimate the change of groundwater, the coming of rainy season, and the cost and time of these external factors will be played directly as compared with the original ground.In general, the plant should dig the earth before the foundation pit is supported, and then the pile will be made. Concrete car can be outside the pit, by pouring over to the bottom of the pit. Of course, if the surface of the excavation is silt layer / or below the shallow water level is special. If the deep foundation pit is used, it is better to dig the soil first and then make the pile, so the concrete pouring is not a problem.The soft soil area must have been dug before and after, for a very simple reason. Soft soil generally has a hard surface layer, so that it is conducive to the movement and construction of pile foundation. If there is no hard surface on the surface, then make the cast-in-place bottom and then pile the pile. In addition, the foundation pit supporting in the soft soil area is a relatively difficult and easy to occur accident process, and the construction grouting pile will certainly affect the excavation and support of basement, and the mud pool will not know where to put it.
- Q:What is the maximum CPU of a pile driver? What about the performance of graphics will be piling machine CPU?
- AMD pile driver FX8350 performance similar to 640 graphics cardsAMD's new series, CPU, has a core code called Bulldozer, and the Chinese translation is bulldozer.
- Q:Code for installation and operation of pile drivers
- First, piling machine operators must be familiar with the structure of the machine, performance, operation essentials and safety precautions, after passing the test and obtain a certificate, you can operate alone.Two, operators must concentrate on the operation. Do not talk, laugh, play or make trouble with unrelated persons. No smoking or food is allowed during the operation.Three, strictly abide by the relevant provisions of the maintenance of pile drivers, conscientiously do all levels of maintenance, to ensure that pile drivers are often in good condition. And pay attention to the rational use, correct operation.Four, the pile driver in the work should be prepared for the following:1, to the construction staff understand the construction conditions and tasks, and construction problems found in this class should pay attention to matters.2. Adjust the position of the speed change gear of the pile driver according to the vibration force required by the construction personnel.3. Check whether the insulation of cables and wires is good. Check that the controller's contacts are good and that the bounds are correct.
- Q:AMD pile driver FX-8350 with what motherboard good?
- AMD 8350, the motherboard recommended using 990X and 990FX, so that CPU can play a good performance.Can be said to be the king of the game. Graphics card or 7870 of the bar, two of the game graphics do not mistake.
- Q:What does a driver of a pile driver do? Playing in the sky?
- To serve as the foundation of the buildingThere are many types of pile driversThe operator works in the ground operating room
- Q:What about the engine power of a hydraulic pile driver?
- The pile machine is not only efficient, economical and practical, it is the best choice for customers, but also can adapt to various bad weather and working conditions of the operating environment.
- Q:Mechanical piling machine about how much money?
- A guide frame consisting of two guide rods is used in front of the pile to control the direction of the pile driving so that the pile can be accurately penetrated into the formation in accordance with the design orientation. The basic technical parameters of a pile driver are impact weight, impact kinetic energy and impact frequency. According to the motion of the pile hammer power source can be divided into hammer, hammer, diesel hammer, hydraulic hammer etc..
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
ZYC800 Hammer Pile Driver Hydraulic Static Pile Driver for Sale
- Loading Port:
- Shanghai
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1000 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords