• yuchai YC260R Rotary drilling rig. System 1
yuchai YC260R Rotary drilling rig.

yuchai YC260R Rotary drilling rig.

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

yuchai YC260R Rotary drilling rig

Technical Specifications

Item

Parameters

Chassis

Engine Model

 

CUMMINS QSM11-C330

Rated Power/Speed

kW/rpm

246/2100

Outer Width of Crawler

mm

4400

Width of Crawler Plate

mm

800

Hauling Force

kN

520

Power Head

Maximum Torque

kN·m

260

Speed

r/min

6-26

Maximum Pressure

kN

200

Maximum Pulling Force

kN

250

Pressurized Cylinder Stroke

mm

5000

Hoist

Main Hoist

 

 

First Layer of Lifting Force

kN

280

Maximum Lifting Speed

m/min

55

Diameter of Wirerope

mm

Φ32

Auxiliary Hoist

 

 

First Layer of Lifting Force

kN

80

Maximum Lifting Speed

m/min

65

Diameter of Wirerope

mm

Φ20

Mast

Rake Angle

°

5

Left/Right Tilt Angle

°

±4

Hydraulic Pump

Maximum Pressure

Mpa

35

Hole Depth

Hole Diameter

Maximum Drilling

mm

2500

Maximum Drilling Depth

m

80

Drill Pipe

Drilling Pipe

mm

Φ508

Working Weight

t

82

Keywords:rotary drilling dig,yuchai rotary drilling dig,weichai rotary drilling rig,weichai,chinese rotary drilling rig


Q:How much is the man-machine charge of the percussive drilling pile driver per meter?
Hello, impact drilling pile driver is about one hundred thousand and one sets, the specific depends on how big you hit the pile, the specific configuration, Nantong punching pile machine factory specializing in the production of punching piling machine, hand impact drill, hoist.
Q:What are the types of construction piling? What are the characteristics?
Pile foundation treatment has many ways, but according to the current market situation and the country's strict requirements for the foundation, many processes are not applicable, such as manual excavation, etc., the following are common and common process methods.According to backfill points: commonly used are lime soil pile, plain soil pile, cement pile, garbage pile and so on.According to the backfill compaction type: clamping rod hammer compaction, heavy hammer compactionAccording to the hole forming process: the diesel hammer is immersed in the hole, the spiral drilling hole, and the Luoyang shovel holeIn accordance with the general classification of hole forming and compaction type: diesel hammer hole clamping hammer tamping hole; diesel hammer tamping; spiral drilling tamping (DDC); Luoyang shovel hole tamping and spiral drilling concrete pile (CFG). And what you say, pipe pile and fish, hammer, strong rammer are also belong to composite foundation. Among them, the pipe pile is divided into static pressure pile (suitable for static pressure machine into the ground) and diesel hammer pipe pile (diesel hammer directly into the ground).Several of the above are mainly to eliminate collapsibility and increase the composite bearing capacity, which belong to composite foundation.
Q:The impact of drilling pile driver how much money
See how big you want to play, I want to hit a big pile on your point
Q:What are the types of hammer pile drivers?
There are diesel tube pile driver, power source brand, Zhong Zhong brand, and Zhejiang is very popular guide rod hammer
Q:What are the main types of pile drivers?
In three, diesel hammer hammer x0d is composed of a cylinder body and a plunger piston which is similar to the working principle and the single cylinder two stroke diesel engine into the cylinder combustion under high temperature and high pressure atomized diesel combustion chamber by injection pressure generated by the detonation driven hammer. Diesel hammer according to its structural form, rod and tube type. Guide rod type diesel hammer for hammer pressure in the plunger seat the pile cap, the cylinder for hammer along two guide rods. The lifting pile, the pile hanging in place pile frame in Longmen, then put the diesel hammer at the top of the pile, the hook will lift down the cylinder, and the cylinder sleeve let off hook falling into the plunger, will be closed in the steam The in cylinder air compression cylinder rocker pin until the pressure continues to fall outside the cylinder pushing hammer seat fuel pump, fuel pump will be injected into the cylinder oil mist, oil mist meet high temperature gas burning immediately above, blasting, explosive shock down make the pile sinking, to the top push the cylinder cylinder to be picked up, to fall along the guide rod, and the beginning of the second cycle. The impact of diesel hammer to hammer cylinder as the base, and directly with the lengthened cylinder wall direction, eliminating the two guide rods, the plunger is movable under the hammer in the cylinder. When the pile. The hammer seat at the lower part of the pile cap pressure at the top of the pile, lifting plunger with a hook, and then down from shock compressed in the cylinder in the closed air.
Q:Invite friends together to buy a long spiral step of 30 meters of the pile driver, told me as long as the project profits are objective, you can package to 200W/, would like to ask the experts familiar with the bank bosses according to your local market if the annual package is how much money, how much is the monthly package, or by how many meters.. Thank you。。 Thank you
The drilling system comprises a power head and the output shaft of the power drill head and screw drill is hollow, with long spiral hole, drill pipe through the center of the concrete [or] of the mud pumping concrete CFG pile construction, which can be a drilling machine once completed, can also be used to dry hole, grouting altering tool can also be taken deep mixing a variety of Engineering construction.
Q:Multilayer, six layers! Real Estate Company real estate. I would like to ask you to build the foundation is a good pile or independent column good? May I have some questions from insiders?! Thank you
Depends on geological reports, can not pile, it is best to save a lot of money Oh!
Q:Will the crawler auger / pile driver dig out the soil and put it aside or can it be removed far away?
According to the length of the pole of the pile driver, the distance is different.
Q:Can you drive an excavator? Can you learn it quickly?
What you said is the steel sheet pile hammer shock, will not have to open the machine learning
Q:Excavators, pile drivers, how to operate? The master knows,
Then, the left handle back down and right arm handle down the left arm when receiving bucket, bucket is full. Then the big arm, left or right rotation and small rotating arm bucket on the line! Got it?! You can also question me!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords