Unconventional Rhombic Form Traveller

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the key processes of hanging basket construction
1, Block 0 (support) frame construction;2, bearing and temporary consolidation system construction;3, hanging basket construction;4, concrete pouring construction;5, prestressed construction;6, beam body linear control;7, closure section construction and system conversion.
Q:Construction technology of hanging basket construction:
The construction of a steel cable-stayed bridge, most of the factory welding process, transported to the site, with the crane as a whole lifting, or block lifting, in place after the formation of high-strength bolts.Two construction of concrete cable-stayed bridge with cast-in-place and precast assembly and other combinations of construction technology. 1 the installation elevation of the hanging basket should be in strict accordance with the designed value.
Q:Hanging basket construction 0# block which is, can provide a schematic?
The 0# block is the first block above the main pier. Drawing on my computer
Q:Construction of extra large bridge
The installation span closure section hanging formwork installation, closure segment skeleton, formwork, steel banding, installation of prestressed pipe and the core concrete - span closure section, concrete curing - tension closure segment longitudinal, transverse and vertical prestressed grouting, demolition - span closure segment construction support.
Q:Can you list all the characters form The Time Traveler's Wife and their descriptions?
Dasher, Dancer, Prancer, Vixen... er, no, wait Happy, Sleepy, Dopey, Sneezy... er, no, wait sorry, I never read it, maybe YOU should
Q:What is the meaning of "hanging basket" in building construction
It is a platform surrounded by railings, suspended on the roof of the wall with a rope
Q:Unit price analysis of hanging basket service
Or do you need to calculate the price of labor subcontracting, I do not engage in the contract, I just say to do this industry to understand these things.
Q:Construction of hanging basket. Pouring concrete and new concrete, how to achieve good adhesion
In order to achieve a good bond between old and new concrete, it is necessary to pay attention to the construction of hanging basket:(1) the pouring of concrete must be pushed forward by the front end of the hanging basket to prevent the concrete crack caused by the deformation of the concrete.
Q:Composition management of hanging basket
Back anchor system: to master the direction of rock steering wheel to ensure the direction of the double guide beam. The system is made up of 1 tie rods of rock and roll, and the 1 anchors are used to guide the o3.4. beam system: to master the integrity of the upper and lower beams. The system is composed of four beams, and the upper and the lower parts are correspondingly connected with the upper and the lower parts of the bottom plate of the 1 bottom box of the bottom plate of the bottom plate of the box girder of the 1 box beam, and the weight of the concrete bearing and the bearing of the concrete of the bottom plate and the side mould core of the bottom plate of the box beam of the bottom plate of the two box girders are respectively connected with the upper end and the lower end. Under the pull rod to complete the vertical mold 1 release work o
Q:On the problem of hanging basket preloading procedure
Install side span closure section, installation of hanging mold closure segment skeleton, formwork, steel banding, installation of prestressed pipe and the core concrete pouring, side span closure segment and maintenance - tension closure segment longitudinal, transverse and vertical prestressed grouting, removing the side line and cross - - side span closure segment construction support the landing gear box girder.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range