Clear Stress Rhombic Form Traveller

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

RHOMBIC FORM TRAVELLER

The rhombic form traveller has the advantages of simple structure, clear
stress, big operational space under the main frame, and easy installation
and removal, etc..
The form traveller adopts wheels with bearing while rolling forward which
reduce the frictional resistance greatly during movement; At the same
time, the stainless steel paltes are welded on the rails which reduced
the frictional resistance bewwen the sliding bearing and the rails during
movement. The combination of these reduce the movement cycle of the
form traveler by simple and convinient operation.
In terms of safety, the form traveler is equiped with walking protection
system which guarantee the absolute safety during working. It’s safe, easy
and practical.

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the innovative points of hanging basket construction
Management points:1 the concrete pouring on both sides of the beam should be symmetrical and balanced, and the unbalanced construction load should not be greater than the allowable value;2 concrete should be rapid, continuous construction, in the first pouring of concrete before the first pouring all completed;3 the bottom plate, the web and the roof are symmetrically layered, and the layer thickness should not be greater than 30cm;
Q:In the construction of the bridge hanging basket, the temporary prestress
Almost the same procedure. Install jack, Jack extended a distance, not fully stretched
Q:How to define the construction stage of continuous beam bridge hanging basket construction
Continuous beam Shujing indeterminate structure, can solve the internal force of law
Q:What is the bridge hanging basket through hole
Mainly refers to the basket itself on the track to move forward
Q:Unit price analysis of hanging basket service
Do not know if you are a contractor or the contractor, is a general contractor and then do subcontracting work needs to do cost analysis
Q:Seven techniques of hanging basket
Concrete pouring management should pay attention to seven technical measures10, 1 square hole. When pouring the concrete at the bottom of the roof, the roof plate can be opened on the two 50x 50 cm square hole, the concrete poured into the hole, to be completed after the completion of the concrete pouring floor sealing hole;10.2. is not overweight. When hanging basket construction concrete pouring V type pier, the difference between the pouring weight of the cross box girder and the cross shore box girder can not exceed 15 tons;10.3. symmetry. When pouring concrete in the same box girder section, it is necessary to carry out the operation of the left and right symmetry, so as to avoid the lateral displacement of the guide beam and cause the displacement of the front plane of the beam;
Q:How to deal with the broken of the cross beam of the hanging basket
Measurement of cracks can be watered with black ink, and then cut a section of cracks observed.The subsequent construction, the need to strengthen quality control, especially the control of masonry cracks in protective layer, the protective layer is too large or because most of the causes of cast-in-situ box cantilever especially should improve the understanding of crack, prestressed anchor head near the pipeline, after the proposal directly after chiseling epoxy resin mending.
Q:What is the meaning of the bridge basket and bridge system
The main reason is because the bridge closure, temporary support, removal or addition of constraints, the system stress of bridge structure by the beam into continuous beam, or by the static structure into a statically indeterminate structure, or by N statically indeterminate structure into N+ (-) M statically indeterminate structure.
Q:On the problem of hanging basket preloading procedure
On the problem of the hanging basket preloading procedure? Construction of the two main piers, the progress is divided into
Q:The post tensioned prestressed anchorage of suspension bridge can be reused?
After tensioning is fixed in the beam, can not be reused

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range