UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Does the behavior of American Travelers help Form your opinion of How all Americans really are?
Americans USED to be much better hosts then guests. Now we are pretty much crap at each side.
Q:How does the prestressed tensioning in the construction of the bridge hanging basket?
The post tensioned prestressed precast box girder is prefabricated by a prefabricated field or a prefabricated factory, and then transported to the site erection; (2) the post tensioned prestressed cast-in-place box girder is directly poured into the box girder and the prestressed tension on the bridge. Cast in situ prestressed box girder, according to the support structure is different, the full frame pouring box beam and hanging basket construction pouring box beam. The hanging basket construction is the use of suspension facilities, segmental mold hanging and binding steel corrugated pipe, installation, concrete pouring, wearing steel strand, stretching and grouting, the completion of a segmental box girder, a segmental box girder, until the completion of the entire construction segment.
Q:What are the key processes of hanging basket construction
The key process of hanging basket construction: 1, No. 0 block support (support) frame construction; 2, support and temporary consolidation system construction; 3, hanging basket construction
Q:Construction scheme of hanging basket of cable stayed bridge
2, rhombic hanging basket structure and technical parameters2.1 rhombic hanging basket structure and technical parametersThe rhombic hanging basket is mainly composed of a rhombic truss, an upper cross beam, a bottom mould platform, a hanging system, a walking system, an anchoring system, a side mould, an internal mould and a bracket, etc.. Technical parameters: applicable to the largest segment of 400t; maximum segment length 4m; beam height of 4.822 ~ 2.5m; for Liang Kuan 37.4m; walking for walking without balance weight; weight hanging basket (including template and support) is 170t; the hanging basket overturning stability coefficient, concrete pouring for 3.2, walking when 11.
Q:Hanging basket in the construction of the 2 block construction is also need to press it
4 anchor bolts to be tightened by means of jack.5 the outer side of the mold at the anchor plate do not pack dead.6 when you walk in the basket, be sure to move smoothly.7 cantilever pouring concrete should be from the basket to the front of the basket to the end of the basket
Q:What is the length of the bridge hanging basket construction?
As for the weight of the piece, the largest piece of the current piece is about 350 tons.
Q:Hanging basket construction 0# block which is, can provide a schematic?
Because hanging blue is anchored in the pouring stage and then pouring the next paragraph, so the top of the pier to be poured 0# block, hanging blue can be installed. The 0# block is to be erected to support pouring. The 0# block is shaped like a T font.
Q:Tensioning sequence of hanging basket
And then, at the top of the tension plate, the steel strand of the web, and then the residual steel beam of the beam, and finally the vertical finishing steel.
Q:Hanging basket dry steel, steel hinge line, how much money a ton
Two provide semi-finished steel transport B from the steel processing field will be processed to cantilever at
Q:Construction of extra large bridge
The installation span closure section hanging formwork installation, closure segment skeleton, formwork, steel banding, installation of prestressed pipe and the core concrete - span closure section, concrete curing - tension closure segment longitudinal, transverse and vertical prestressed grouting, demolition - span closure segment construction support.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range