UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Vertical embedding of hanging basket
. The steel wire mesh of the embedded steel bar and the roof must be fixed firmly
Q:Construction technology of bridge hanging basket
A, pillow and track installation;B, assembled hanging basket main frame;C, installing front cross member and front sling;D, the crane will be used to bridge the bottom of the bottom of the platform to lift the platform, and with the front sling, and then install the rear sling;
Q:Construction scheme of hanging basket of cable stayed bridge
The construction scheme for main bridge superstructure: installation of steel pipe column bracket in the cap on the box girder construction 0, No. 1 block on the bracket; 0, 1 complete block construction after the erection of rhombic hanging basket, piecewise symmetric cast until the completion of the No. 18 block construction (including 7 ~ 17 block cable block), forming the largest cantilever structure of T, and then by the side span to middle span by span symmetric closure.
Q:What's the best form of money or payment to use in Sweden? Traveler's cheques, atm or credit card or Swedish
The best method is your bank ATM card. It has the lowest fees and the correct exchange rate. With your ATM card, here is no fee for converting you money. No other method of getting local money does that, which is a huge savings. All the rest of them will charge you to convert your money. Your bank will charge you about $1-1.5 for using a ATM, the bank you are getting the money from won't charge you anything. You can't beat that deal with a stick, anything else will cost you more money. Travelers checks are very old school, I'm surprise they even make them anymore. Many stores and restaurants don't want to take them as they don't want to spend the effort to deal with them. Not only do you have to spend money to buy them, but they have to be converted to local money at some point. When that happens you get screwed on the exchange rate anywhere from 5-10%. That is a lot of money right out of your pocket. Credit cards are good too, but you company will charge you a transaction fee of 2-3% of the amount spent to convert the money. Whatever you do, do not get cash with a credit card unless you need too. Not only is there that same fee but they start charging you interest right away. They don't give you a grace period like other charges.
Q:Construction of hanging basket hanging blue construction
4, a hanging basket of the main truss of the back of a total of 4 finished steel rebar, a hanging basket after the anchor needs a total of 8 finished rebar rebar anchor, hanging blue in place to anchor in time;5, lifting jack hanging basket, lift the hanging basket to ensure the integrity of the crane, is strictly prohibited overload;6, the front of the top of the 4 straps to be uniform, in the adjustment of elevation, the top of the sling to be adjusted, can not be adjusted after the first 2 in the absence of the instrument to monitor the situation in addition to the other 2 root 4;7, hanging blue walk, to ensure that the sling, templates and so on and the separation of blue, and sent to observe whether the normal walk. Hang blue, template and box beam or other items are friction, care, and found that the abnormal walking should immediately stop, identify the reasons for treatment and then began to walk;8, the hanging basket to be symmetrical, before walking to the longitudinal axis, in the track to draw the control line, walking on both sides of the journey to be consistent, the right axis;
Q:How to deal with the cracks in the box girder
If the structure cracks, while continuing to the direction of the development of the proposed use of epoxy resin modified cement mortar repair.If the surface layer of cement slurry is too thick, it is recommended to clean the surface, re repair.
Q:The construction of the hanging basket of the bridge needs to be pre - pressed in each suspension section
The main equipment of cantilever pouring is a pair of walking hanging baskets
Q:Tensioning sequence of hanging basket
First look at the design instructions. General vertical first, followed by vertical, the last horizontal
Q:In the construction of the bridge hanging basket, the temporary prestress
Almost the same procedure. Install jack, Jack extended a distance, not fully stretched
Q:Hanging basket construction steel binding labor costs a ton of money
Steel straight, processing, assembling, derusting, welding, sleeve connection, transportation, installation, transportation and other mold materials on-site and reinforced construction about everything related ancillary work

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range