• Tower Crane TC6016 QTZ100 Manufacture China System 1
  • Tower Crane TC6016 QTZ100 Manufacture China System 2
  • Tower Crane TC6016 QTZ100 Manufacture China System 3
  • Tower Crane TC6016 QTZ100 Manufacture China System 4
  • Tower Crane TC6016 QTZ100 Manufacture China System 5
  • Tower Crane TC6016 QTZ100 Manufacture China System 6
Tower Crane TC6016 QTZ100 Manufacture China

Tower Crane TC6016 QTZ100 Manufacture China

Ref Price:
$10,000.00 - 50,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Item specifice

Maximum Lifting Weight:
10T
Maximum Lifting Height(M):
200M
Rated Loading Capacity:
1.6T
Span:
60M
Rated Load Moment:
100T.M

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6016(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 200m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3) The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5) The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC6016

 

Free standing height (m)

50.5

Max height with attachment (m)

200

Working range can be adjustedm

485460

Min working rangem

2.5

Max lifting capacityt

10

Tip load @ 60mt

1.6

Hoist mechanism (VFD+PLC)

Falls

2

4

Lifting capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132S-4-5.5KW

Slewing mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-4KW×2

Climbing speedm/min

0.5

Counterweightt

48m jib  

54m jib

60m jib

15.45

17.85

18.9

Mast section sizeL×W×Hm

2×2×3

Working temperature

-40+60

Total power (KW)

60

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V      210A

Rated working voltage & current

380V                 116A

 

Loading diagram

 

60m jib length

R

2.5-22.4

30

40

50

60

a=2 (kg)

5000

3646

2630

2014

1600

R

2.5-11.245

20

30

40

50

60

a=4 (kg)

10000

5564

3573

2560

1944

1530

 

54m jib length

R

2.5-24.55

30

40

50

54

a=2 (kg)

5000

4028

2919

2246

2046

2.5-12.36

20

30

40

50

54

a=4 (kg)

10000

6130

3958

2849

2176

1976

 

48m jib length

R

2.5-25.69

30

40

48

a=2 (kg)

5000

4232

3073

2488

2.5-12.96

20

30

40

48

a=4 (kg)

10000

6431

4162

3003

2418

 

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Mast Section MC Factory

 

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Q:Do cranes play major role in Japanese culture? How so? Do cranes live in Japan?
cranes are a japanese bird. they show the symbol of courage. but cranes do not live in japan. i live in michigan and i have cranes roaming my meighbor hood.
Q:So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
Q:I've always wondered, how do they lift cranes? Bigger cranes? What do you think/know?
The use other large cranes. They put them up there piece by piece, and sometimes use cranes on the ground to hold pieces up while they assemble them.
Q:My hubby just passed his crane test yesterday, and I was wondering how much they pay? He was told to ask for 50k a year..that includes crane time where he works. Can we really ask that? He sets trusses for a big lumber company in Missoula Mt. Any help would be great.
The little that I do know is that it's one of the most dangerous jobs in the construction field including working around them...so it easily pays that much...
Q:It's better if the explanation is not complicated.TQ
Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
Q:if someone have formula for that, one telescopic crane is lifting and i know about the boom lenght and redius,then how i can calculate the angle,if crane crane angle indicator is not working.thankyou.
Boy! You really need to get the angle indicator fixed and calibrated! There are ways to estimate, but they are inaccurate and therefore not safe, if you have not got the expierence to do it. Don't use the crane for any load close to your SWL!!! An addition: unless you want to measure your reach, i.e. the distance from the crane pedestool to your load, then you can calculate the angle, but you don't need to anymore as you now know what the distance of your lift is and therefore you can look up the SWL on your chart. Get it fixed.
Q:is this a grey crowned crane?
yes it has to be
Q:What does tower crane jacking up mean?
Jack beam and the lifting sleeve frame is connected with the movable claw beam under the fulcrum can fall in the tower body section on the top step.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:I can't seem to find the item I'm looking for on-line. Maybe some fellow crane operator happens to know where I can find this. It's a quick releasing crane hook, it drops the load on cue. I think it would probably be remote-controlled.
We manufacture a QUICK RELEASE FOR CRANE look at www.craneequipment.ca

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords