Tower Crane TC5613 Climbing Cage CMAX Brand
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Specification
Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC5613(QTZ80)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.
It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.
It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.
The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC5613
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44、50、56 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)m | 1.8×1.8×2.5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Loading diagram:
56m jib length:
R | 2.5—13.7 | 14 | 20 | 24.9 | 26 | 32 | 35 | 38 | 44 | 50 | 56 |
a=2 | 4t—24.9m | 3.80 | 2.94 | 2.63 | 2.36 | 1.94 | 1.63 | 1.38 | |||
a=4 | 8t—13.7m | 7.79 | 4.12 | 3.92 | 3.72 | 2.86 | 2.55 | 2.28 | 1.86 | 1.55 | 1.30 |
50m jib length:
R | 2.5—15.1 | 16 | 22 | 26 | 27.6 | 32 | 35 | 38 | 42 | 50 |
a=2 | 4t---27.6m | 3.34 | 2.99 | 2.70 | 2.37 | 1.88 | ||||
a=4 | 8t-15.1m | 7.48 | 5.15 | 4.22 | 3.92 | 3.26 | 2.91 | 2.62 | 2.29 | 1.80 |
44m jib length:
R | 2.5—16.3 | 20.9 | 26 | 29.8 | 32 | 35 | 38 | 40 | 42 | 44 |
a=2 | 4t---29.8m | 3.69 | 3.31 | 2.99 | 2.79 | 2.63 | 2.48 | |||
a=4 | 8t---16.3m | 6.0 | 4.64 | 3.93 | 3.61 | 3.23 | 2.91 | 2.72 | 2.55 | 2.40 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q: JKD (Jeet Kuon Do)These are the best ones closest to my areaand i want to know which one is the best in terms of fighting (got the most effective and powerful swift moves)also one which has the best weaopn training and teaches you good trapping and pressure point techniquesWhich is the one which is shown in the movies most and what movies You dont need answer all of them just the main question which one of these are the best for fightingthnxxx
- Having done all three systems let me say this, fujian white crane has excellent trapping and pressure point fighting methods contained in the forms, it also teaches weapons such as the long pole, butterfly knives and long sword. It is idea for close in fighting as it protects the centreline (like wing chun), the kicks are low and thus practical. Jeet Kune Do can mean anything you want it to, no two clubs are the same but the good ones stress full-contact fighting, bag work and grappling - all useful stuff on the street and I should know having fought there a few times. Nam Pai is a lovely flowing style but a bit flowery for my tastes and not as practical as the above two. In the movies and on TV you get a lot of Jeet Kune do stuff, mostly done by actors pretending to be special forces guys. I haven't seen much crane or nam pai, which is a shame really.
- Q: i have an echo-1 m8a4 cqb it has a crane stock that fits a 9.6 1500mah battery but it wont fit a 2000mah so i want to switch to a full stock but im haveing trouble figuring out how to switch them. does anyone own this gun and know how to do it?
- Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!
- Q: Flocks of cranes shout'. Is it right to use the word'shout' here?
- No, it's not. First, the collective noun for cranes—its term of venery—is either herd or sedge, not flock. Second, the sound a crane makes is a whoop, or when not a whoop but a rattling sound, it is a bulge, not a shout.
- Q: how does the power electronic drives employed in cranes?
- The primary function of an electronic drive is to provide for operation at various speeds. Slow speed operation is used when moving a load into position. Faster speeds are used for moving loads over longer distances. When the operating speed is steplessly adjustable, ramped acceleration and deceleration control is easily provided as well. Controlled acceleration provides smoother operation because acceleration at a constant rate means accelerating with a constant force or torque. Electronic drives control torque and current during starting. They perform a function similar to a reduced voltage motor starter, but they do it steplessly, more efficiently, with more complete control of applied torque. They provide more torque per ampere of current than any other starting method. This is very beneficial for the frequent starting and stopping often required for cranes. Electromechanical motor controls for cranes require additional contactors, relays and other components to perform functions such as reversing, motor overload protection and braking. These functions are incorporated into the electronic controls with electronic drives. Electronic braking can return energy to the power supply and bring the load to nearly a complete stop before a friction brake is applied. For holding the load in position, an electromechanical brake is still required. Electronic drives can be used on bridge, trolley and hoist applications.
- Q: So I have this teacher for almost 4 years and I didn't very much liked her style of teaching. During my sophomore year I was getting fed up with having her in my favorite class. Unfortunately she got ovarian cancer. Now that I think for what she has done and not acknowledging her, I feel really bad. To make things up I wanted to give her I guess the 1000 cranes before I leave for college.Is it okay to give it to her? If so, what do you do once you have all 1000 of them folded?
- You string them in combination in order that they nest in combination in a protracted garland, after which fold the garland smartly in a field. It might definitely be ok to ship them--in particular for the period of a excursion for decorations-- despite the fact that the special location you might ship it might differ from location to location. I might additionally advise drawing near the media, your loved ones, peers and colleagues and asking them to sponsor cranes, in order that you're sending cash at the side of your thousand cranes. I'm folding cranes for charity. You can sponsor one for 5 greenbacks. Would do the trick, and it might upload to a symbolic gesture.
- Q: In Batman Begins, what was Dr. Crane/ Scarecrow (Cillian Murphy) after? What did he get in return with working with them and why did he work with them? He doesn't strike me as the kind to work with groups, he seems like a guy who rather work alone.
- because they all wanted to f*ck up gotham
- Q: I've come up with a few reasons, if someone could add on to it then that would be wonderful!Thank you for answering my question :D
- A crane allows us to place light or heavy loads with precession and safety; on top of buildings, across water ways, down mine shafts and over obstacles. Building a pyramid today would be done with cranes, instead of building ramps to slide the massive stone blocks up. Cranes speed up any construction project. Cranes eliminate a lot of manual labor. Cranes prevent injuries by doing the hard work. One example, we used a crane to lift off an entire house roof, in one piece. We then built a second story and then used the crane again to put the roof back on. Without a crane, it would have taken several days to tear off the shingles, remove the roof sheeting and the trusses, not to mention the money saved. The building codes do not allow the reuse of wood trusses, yet not taking the roof apart, allowed use to reuse the trusses, a savings of hundreds of dollars. Wingman
- Q: Lets say you are calling to get a crane truck to lift something, and they have 3 sizes of crane trucks. 17T (with a 70 ft boom), 23T (with a 101 ft boom), and 35T (with a 115 ft boom).All they ask for is how high you are lifting your equipment, how far over, and how many pounds it is.How do you use this information to calculate which size crane is used?
- I am not sure that you are giving us sufficient information. I presume that your crane truck has the boom hinged quite close to the ground, but I am sure that the specified lifting weights will not be achieved until the boom makes an angle of at least 45 degrees with the ground. The 115 foot boom will then sweep a circle of 115 x cos(45) = 81.3 feet, and lift a maximum of 115 x sin(45) = 81.3 feet above the hinge. If the boom is elevated to a 60 degree angle, the circle swept will be only 57.5 feet, but it will lift 99.5 feet. If the boom is lowered to 30 degrees, the circle swept enlarges, bt the distance lifted drops, and the weight lifting capability will also be derated. If the crane has a tower and the weight rating is for a horizontal boom, the maths are quite different.
- Q: vehicle's like car's,truck's etc.need's paper's or document's for regestration or license to used it.what if i mounted or install a crane on it,do i need some paper's or document for regestration or license for the crane?
- I am not sure, but you probably do not need one for a crane perse. Although if you do that, you are basically modifying your current vehicle and you may need documentation for that. To be sure, ask the Land Transportation Office. or visit their site: www.lto .ph/
- Q: You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- from the ground up
Send your message to us
Tower Crane TC5613 Climbing Cage CMAX Brand
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords