• CMAX Tower Crane TC 5613 Construction Machine System 1
  • CMAX Tower Crane TC 5613 Construction Machine System 2
  • CMAX Tower Crane TC 5613 Construction Machine System 3
CMAX Tower Crane TC 5613 Construction Machine

CMAX Tower Crane TC 5613 Construction Machine

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Specification

Maximum Lifting Weight:
8t
Maximum Lifting Height(M):
200m
Rated Loading Capacity:
8t
Span:
56m
Rated Load Moment:
8t

CMAX Tower Crane TC 5613 Construction Machine

Product Description:

Descriptions of our tower crane:

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.


Advantage of our tower crane:


1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2,It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.




FAQ;

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Q: How much does it cost to build 18, 22, 35, 40, 50, 70, 100, and 120 ton cranes?
You would have to contact the crane manufacturer. Each size would have different cranes that meet that requirement, eg portable versus not portable. That's assuming those are total crane weight numbers? Or are they lifting capacities?
Q: A solid answer and links would be nice.Your help and/or attempts to help are appreciated
It's actually a POST WWII story: Sadako Sasaki, a Japanese girl who developed leukemia at age eleven as a result of exposure to atomic radiation when she was two years old, began folding paper cranes in observance of a Japanese belief that the gods will grant a wish to anyone who folds 1000 cranes. Although she died a year later, her friends took up the mission, and the paper crane has become a symbol of the hope for world peace. The site below tells the story far more movingly than this summary.
Q: What is the definition of lifting, slewing and luffing of tower cranes?
Rotary is cantilever tower crane tower crane rotary shaft winding;Is the hook shaft distance amplitude change;
Q: the way u find them climbing with the building makes me wonder how they become this long and what is the mechanism for that
The base and the arm can be expanded like the ladder of a fire fighter car.
Q: how do they get cranes on top of building sites?
With anouther crane.
Q: In Scottsdale AZ I have never noticed them before this year. They are on the walls all around our doors.
cranes leave their habitat because the first reason was the climate , second its mating season and lastly scarcity of food in their habitat during winter .
Q: In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
Q: why the new york cranes collapsed?
supply them time Dizz, ultimately some Lib will say that is Bush's fault because...he enable the metal marketplace crumple so the crane became created from chinese language iron...or he did not signal the bill to provide the city of lengthy island adequate money for inspectors...or he ordered it to make Bloomberg seem undesirable because Obama became thinking Bloomberg as vice president.
Q: A Korean kid at my school made me one in a new kid meeting. Sadly, he made it with my hall pass that needs to be signed with the teacher that organized it. But when she had to sign it she ripped it up and he won't make me another one! How can i make one myself?
I was going to do that once when I was about eleven... I got to like 156 and then stopped. Too many, and I had other things to do. I'd like to do it again though, maybe see if it's real or not this time... even if it's not, it would be pretty awesome to have that many cranes. I'm not sure if it will really make your wish come true... you have to make your own wish come true, folding paper can't really do that. But maybe it can help some. It's worth giving it a try.
Q: Building a new skyscraper? Tearing down the old Mellon Arena?
Get ready for the new tower.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords