• TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars System 1
  • TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars System 2
  • TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars System 3
TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars

TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

With level beams, trolley radius changing, swing top and versatile crane including the following characteristics:

1.With domestically advanced technology and capacity indexes matching up with international level, the tower crane’s working radius can reach 43 meters.

2.With an internationally fashionable appearance, the crane enjoys popularity among both domestic and overseas users.

3.The working style of this tower crane can be divided into 2 ways: base fixation and wall-attached fixation with independent erecting height up to 25 meters. On the basis of independent erecting, the attached erection can be achieved by adding standard sections and additional devices and the height can be 100 meters.

4.With high efficiency and excellent timing capacity, the tower crane is liable and safe. The rotating structure is driven by Epicyclic reducer. The elevating system is featuring in tight structure, high efficiency, convenient to use and maintain and safety.

5.Safety devices are integral and belong to mechanic and electric appliances with great reliability and can be used in wild and harsh environment.

6.The tower crane applies hanging jibs with large breadth and bi-tie bars. The jibs is very rigid , light in weight, pleasing to eyes, small in base with great capacity to shoulder pressure and resist wind.

7.The driver’s cabin is independently designed with good sight and spacious interior.

TOWER CRANE SL5013 hanging jibs with large breadth and bi-tie bars

 

 


Q:where does it live? what does it eat? How do you feel about it? (positive side)thank you! thank you! thank you!help!help!help!
In the spring and summer, the Red-crowned Crane breeds in Siberia and occasionally in northeastern Mongolia (i.e., Mongol Daguur Strictly Protected Area). Normally the crane lays 2 eggs, with only one surviving. Later, in the fall, it migrates in flocks to Korea, Japan, China, Taiwan, and other countries in East Asia to spend the winter. All Red-crowned Cranes migrate, except for a flock that is resident in Hokkaidō.
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley
Q:i just ordered a new JG 614 crane stock and do not know how to use the crane stock i would like to learn before it arrives can i have a link to a video or explanation please
You first need a crane stock battery, as a normal battery won't fit in just one side of the crane stock. When you but the battery, you'll have two or three clusters of cells. Begin experimenting with the cord placement in the stock, by putting one cluster on one side and one (or two) on the other. You'll see what I mean when you get the gun. That's all there is to it, just a little experimenting.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:What company makes a good engine crane I can order online?
I would suggest going to Harbor Freight or Oreilley's auto parts... they both should have them at at very reasonable price...if you order online it wouldnt be cost effective due to the shipping and handling added on to the price.
Q:I was told that this was taking place, so i would like to fax the info to the proper local
Is that a woof woof dog, or a dogman? A dogman is the person responsible for loading a crane. In days gone by, he often rode on the load while it was being hoisted. Maybe some still do?
Q:its huge and it is in my kitchen what to do with it it is freakin me out!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
No daddy long legs are real because when I got home from last night and I also saw 5 crane flies on my door so daddy long are at are real after all and also crane flies aren't poisonous.
Q:A crane lifts a 425 kg steel beam vertically a distance of 117m. How much work does the crane do on the beam if the beam accelerates upward at 1.8 m/s^2? Neglect frictional forces.a.) 3.4 x 10^5 Jb.) 4.0 x 10^5 Jc.) 5.8 x 10^5 Jd.) 4.9 x 10^5 JSolved as W= mgh but obviously that is wrong. Where do I go wrong?
You have the right idea, the answer is d. EDIT: Well I actually read the rest of the question (sometimes I get an itchy trigger finger!), and the net force should be found first, the net force includes the weight and the tension in the crane's cable (so you need to find the tension): ∑F = ma = T - mg T = m(a + g) = 425kg(1.80m/s? + 9.80m/s?) = 4930N So the net force is the sum of the tension in the cable and the weight of the beam, or: F = T - mg = 4930N - (425kg)(9.80m/s?) = 735N Then, the work done by the crane is: W = FΔy = 735N(117m) = 8.95 x 10^4J Does not match any of your choices, so I am perplexed! Maybe someone will straighten me out. Apologies if I failed to help.
Q:What tower cranes are used on the 30 storey house?
The 30 storey building on the height of about 100 meters to 120 meters, plus 2 to 3 layers of basement, the tower crane must set the height of 110 meters to 140 meters, if the single building is less than 60 thousand square meters of building square meters, as the total number of square meters, using a two QTZ63 type tower crane is enough,
Q:IN HEAVY LIFTING WORKS, Which type of crane is better ? Certain area I See Cranes with JIbs are being used and for same type of lifting jobs i See TELESCOPIC CRANES are used. Ofcourse both are Mobile cranes. I see JIB cranes are assembled at site ...
And your question is?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords