• Topkit Tower Crane TC6520 for Construction System 1
  • Topkit Tower Crane TC6520 for Construction System 2
  • Topkit Tower Crane TC6520 for Construction System 3
  • Topkit Tower Crane TC6520 for Construction System 4
  • Topkit Tower Crane TC6520 for Construction System 5
Topkit Tower Crane TC6520 for Construction

Topkit Tower Crane TC6520 for Construction

Ref Price:
$150,000.00 - 170,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Brief Description:

 

1. TC6520(QTZ160) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 65m, TC6520(QTZ160) tower cranes are famous for their large operating ranges, varied working methods and wide uses.  

2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.

3. It is original in design, reliable in operation and satisfactory in shape.

4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.

5. Slewing mechanism and trolleying mechanism all take VFD+PLC technical control.

6. Outstanding in working efficiency, operating speed and stability. Reduce future maintenance cost.

7. With scientific layout and beautiful appearance.

8.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. 

9.After sales service will be offered which will get rid of all your worries in the purchase of our product


Features:

 

ItemParameter
Independent height (m)50
Max height with attachment (m)200
Working range can be adjusted(m) 55/60/65
Min working range(m) 2.5
Max lifting capacity(t)10
Tip load @ 65m(t)2
Hoist mechanism (VFD+PLC)Falls24
Lifting capacity(t)0-2.50-50-50-10
Speed(m/min)0-800-400-400-20
MotorYZPBF250M1-6-45KW
Trolleying mechanism (VFD+PLC)Speed(m/min)0-56
MotorYZPBE132S-4-5.5KW
Slewing mechanism (VFD+PLC)Speed(r/min)0-0.6
MotorYTW112M-4-5.5KW×2
Climbing speed(m/min)0.5
Counterweight(t)21.3
Mast section size(L×W×H)mm2000×2000×3000
Working temperature-40-+60°C
Max working wind(m/s)20
Total power(KW)63
Rated working voltage & current380V/121A


Topkit Tower Crane TC6520 for Construction

Topkit Tower Crane TC6520 for Construction

 

Loading Diagram:

Topkit Tower Crane TC6520 for Construction 

FAQ:


Q: What kinds of tower crane are available now? 

A: Four main categories: normal  tower crane  with cat head, internal climbing  tower crane , top less  tower crane  and luffing  tower crane.  

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Q: What is the difference between crawler crane and tower crane?
Tower cranes are generally used in high-rise building construction. They are self elevating and attached. The boom is very long and the construction site is very common. Multi story buildings can be replaced by automobile cranes.Crawler cranes are used in municipal engineering, such as subways, bridges and so on. Lifting weights can be moved.It's very easy to tell from the outside, so you can search for some pictures.
Q: Ok, so I figured out that last step after watching an origami tutorial thing on youtube
It okorder / The animations on this site are good, showing what you have to do, without hands in the way.
Q: What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel. Specific include construction lifting signal division, cable construction, lifting machinery, tower crane driver (T), construction crane, tower crane installation, demolition worker (T), and height job basket, installation, demolition workers.
Q: i was reading this chapter in the book Catching fire (part of the Hunger Games Series) and this one part said she wrote Seneca Crane on the dummy with mud,, who is Seneca Crane?
u know at the end of the hunger game book...when katniss and peeta were both bout to put the berries in their mouth? and then the announcer said..no no no..and u both win, rite? the announcer was seneca crane...the capitol was mad at him for doing that so they killed him...:(
Q: what would you wish for?also, when your done making your 1000 cranesm what do you need to do next? to like, make your wish come true??
I would wish for immortality.
Q: I have these sand cranes that always come up to our house and we feed them bread they never were aggressive but now one certain one is getting more aggressive. We have a screened porch and they come up to it and there putting holes in it to get our attention and there making like a noise thats not that normal when they see us. The one certain one is getting more aggressive towards the other birds poking on the them and chasing them. There is a group of four and they always stay together. the other three arent as aggressive as the one. He is bigger then the rest of them and is almost like the boss you could mostly tell he was before. He always let the other eat first while he watched around and when we gave them bread he used to be the last one up there now hes the first one there and literally runs to us when he sees us.
Sounds like the aggressive is the Dominate male of the herd. I know you like to feed them but that's what started the problem. He is being Dom so he can get more food and be the first to eat. Once they figure out you're not going to feed them they will go back to behaving normal. These are cool to look at, even though they can get loud sometimes. Have you ever seen tourist feed sea-gulls at the beach. Locals don't do it. Sea Gulls will get as aggresive as the Sand Cranes and actually dive bomb people. Imagine what a Sand Crane can do being what 10 times the size
Q: Please help!
there are several kata, that was influenced by it, like niahanchin (tekki), chinto, rohai and many others
Q: Ty Crane is the star basketball player for st.francis, what is he doing now? Where is he? Why is he not in the NBA?
Ty Crane is the next ersan ilyasova (PF Bucks)
Q: What prior education and skills are needed to become a Crane operator ?
A basic education is required, no need for major courses. Skills however is developed through training. One is communication skills using a radio. Because crane operators have a partner called rigger, who overlooks the movement of crane below while telling instruction to the crane operator. Another skill is synchronization. Crane operators should possessed good movement synchronization and operation of levers and buttons inside his cabin. Another is good eyesight. Lastly, safety skill. Operators should know the capacity or the equipment he is operating and the calibration of the machine he is using.
Q: In what circumstances should a tower crane be demonstrated by an expert?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsBuilding quality [2009]87 number]Annex twoMore than a certain size of the risk of larger sub sub project scopeI. deep foundation pit engineering......

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords