STEEL FLOORING
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
raised access floor system;Raised access flooring;Steel panel
1)IS09001 CO
2)15year experience in producing raised floor syste
Raised access floor system;Raised access flooring;Steel panel
Steel infilled cement covering the HPL
Product Advantage
- Free standing for easy & fast access
- Electrostatic dissipative, drain static charge slowly to avoid charge built-up on the panel
surface
- Easy maintenance & durable surface cover - Resistance to many chemicals that are
found in industrial environments
Understructure System
Rigid Grid Bolted Stringer System (Cross-Pieces)
Workers accessing under the floor never seem to put the floor components back in properly if the grid snaps (snap on stringers) in place. That is why it is highly recommended to bolt the grid, to discourage workers from disassembling the floor system.
We have found that with heacy loads, it is a much safer environment when the grid is bolted. Bolting the stringers (cross-pieces) to the pedestal (floor jacks) creates a rigid grid even when floor tiles are removed.
HUIYA computer, server, control room, and general office access floors is China fastest growing raised access-flooring manufacturer. HUIYA help design and create smarter buildings utilizing HUIYA's state of the art raised flooring systems to help organize your voice and data requirements. Create your intelligent building by using the access floor as an open-air plenum. With over 15 years of experience around the construction industry, HUIYA is committed to being part of the solution.
Businesses have responded quickly and dramatically to rapid technological changes over the last several years. Yet, building systems have been slow to accomodate these demands. Changes to office environments continue to be disruptive, slow and wasteful. Repairs to sensitive equipment and data remains unnecessarily high. Environmental efficiency and comfort is more important than ever. HUIYA's Raised Access Flooring systems eliminate the need for embedded wiring and provides instant access to wiring and cabling, allowing for quick and easy reconfiguration of your office space. HUIYA has the technology to address advances in electronic work flow, conservation and occupant comfort.
- Q: Anti-static PVC board where the use of, please give details of Thank you very much! The The Questions added: or what type of business with anti-static board, the best example Thank you ~ ~ more
- Cleaning equipment, observation windows and equipment hoods, electronic test fixtures and semiconductor equipment and microelectronic equipment, electrical and electronic, pharmaceutical food, precision instruments and biotechnology, etc., which require ESD anti-static insulation technology and equipment, clean room space separation field. Requires anti-static technology and equipment, clean room space separation, clean equipment, observation window and set nail Fu teeth Huangjiao Hao Xie ketone hides the equipment, electronic test fixture and fixture. Such as Intel, AMD's wafer production and other high-end products
- Q: What kind of chair will not damage the anti-static floor
- Below with wheels ,so cool.
- Q: Do you have a grounding grid for your own anti-static floor?
- According to the national elevator inspection regulations and GB7588-2003 requirements, the elevator power supply system requirements are TN-C or TN-CS system, and your own grounding network, is generally connected with the earth directly, the ground wire is not in the total air (TN-CS) or directly connected to the power supply neutral point of the transformer (that is, the TT system is not in compliance with the relevant regulations.
- Q: The height of the static floor in the central control room is not required
- Of course! The height is related to the material of the electrostatic floor
- Q: Anti-static floor cracked how to do
- Anti-static floor cracking after the repair: protective 籂 pole dumplings bogey boge off Kurong 1, the old anti-static floor surface veneer clean; 2, the old anti-static floor surface clean; 3, will have been cut a good new anti 4, will clean the floor surface evenly coated; 5, to be anti-static veneer glue, the floor surface glue dry paste.
- Q: Machine room length 7.6m, width 5.3m, about 40 square meters, the existing grounding copper belt 100m, specifications 3X30MM, insulated helium for the reclamation of the old rush to protect the child 10cm / sets, 100 sets, tin plating busbar 8 * 100 * 400mm, 1 set, lightning down ground, specifications 50mm2,1m, ground terminal, specifications 4 * 40 * 400 + 2000mm flat steel, 1 item. Room electrostatic floor there are others to do we only mine, I would like to ask 1, the room needs to be connected to the number of copper meters? 2, the above products how to do lightning protection grounding specific steps and what to pay attention to. 3, horizontal ground and electrostatic floor between the height of 15cm enough? (Between the ground and the electrostatic floor has a 10cm high trough) is best to give a set of programs, to help me solve the problem to the 100 Thank you more
- Weak mine grounding: copper belt laying method There are several cases, 1, if the whole shop is 600 * 600 grid, 40 square will be 140 meters, so the cost is too high, the general project will not do so. 2, you can use the copper machine around the room is about 26 meters, the middle of a thin copper foil instead of doing electrostatic copper network, so a lot of low cost, but also in accordance with the norms to do this is more commonly used method. 3, can also be made "day" field head, so you can save a lot of material costs. Copper tape laying in the vicinity of the electrostatic floor bracket, copper belt and bracket, equipment to make a good connection between. These methods are useful to the project, the specific use of which method, this should be based on the design side or your material engineering offer. Insulators are mainly fixed, insulated copper role, the cost is cheaper. Horizontal ground and electrostatic floor between the helium for the reclamation of the old rush 15cm height enough. The main role of the busbar is to connect all the equipment ground, copper, pooled on the busbar, and then connected to 50 square bus, bus can be connected to the building public ground, the specific needs of how many meters, this should be based on distance. Probably this way. I hope I can help you
- Q: Will the silk be static?
- I have learned that the same is true of electricity from the glass rods worn with silk, called positive electricity; and rubber bands that have been rubbed with fur. The same electricity is called negative.
- Q: How many anti-static floor with feet and beams
- A square anti-static floor, the ratio of feet is 3.5, beam ratio is 5.5, an anti-static floor 0.36 square, calculated down, an anti-static floor foot ratio is 1.26, beam ratio of 1.98, do the project are generally So the ratio, if the wholesale, that ratio will be much less, should be wide floor professional to do the project, so the fight against the attack Jiqiu fluttering Wei Wei two pieces are according to this ratio, in summary, that 100 Block floor, feet to be equipped with 126, beam 198, 396 screws, a beam with 2 screws, and so on
- Q: In addition, the anti-static floor of the anchor room, the stent is the wooden keel removed after laying another classroom, the area is different. Is this okay? If not why can not it? More
- You have to take into account the color of the floor to buy and support the brackets, each manufacturer's production of electrostatic floor of the stent and the surface layer will have some differences in the number of laying of the old OKorder guilty of profiling arrogant anchor when there will be large gap Situation, is not conducive to the post-maintenance of electrostatic floor, the more the gap will be bigger. The best way to use ceramic electrostatic floor, this floor anti-static effect is superior, durable, use for decades do not have to replace, carrying high, maintenance is very simple. Usually with a wet cloth mop on the line.
- Q: Antistatic aerial floor how much money a square meter?
- More than 80
Send your message to us
STEEL FLOORING
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords