Mohawk Flooring

Hot Products

FAQ

To warm or water pipe leakage from the time of the warranty period
Hot work
Home 200 square meters electric heating boiler
Home 200 square meters electric heating boiler...
How long can I use water? How much does it cost each month? Which is the most professional to warm?
Theoretically can be 50 to 70 years, if the maintenance may be longer, plastic in the ground is difficult to corrosion, and generally not bad, but part of the metal parts for a long time to change it. But the maintenance is not good for decades do not clean, maybe it will be blocked. Charges, according to traffic charges is the future trend, which depends on the home requirements of the water temperature. Professional? This is not good to say, I installed when the election of more than 20, and finally the million OKorder for high Jia 薨 spring hong pseudo for the construction of the sickle moved me, I am very good at his home image.
What does building HVAC include?
This range is relatively broad, all with the building-related HVAC can be classified as such! Recommend forums Forums Public Utilities Engineers Forum
Radiator parallel system how to take pictures
The installation of the radiator is divided into two forms: the installation and installation of the radiator. The installation steps include the installation of the pipe, the installation of the radiator, the installation of the boiler, the pressure test and the customer acceptance. Trouble, need to slot and install the set of water, for the decoration of the housing, the general choice to install the radiator, installed both convenient and not damage the indoor decoration effect. 1. Laying the pipeline in advance with the customer to communicate with the location of the radiator after the installation of the need for the layout of the pipeline, the pipeline is generally in the ceiling, baseboard and other hidden places, the laying of the tube as much as possible not to affect To the interior decoration or take up too much space. 2. Install the radiator in the process of installing the radiator to the radiator to be stable, and to use the level of measurement to see if the installation is smooth, and then the valve connection and inlet and outlet valves connected, after checking the correct The pipe clamp is reinforced. 3. Installation of the wall-mounted boiler The installation of the boiler should be noted that with the open line and electrical equipment separated from the flammable and explosive materials can not be on the hair to promote the safety of the body, Table and gas stove should be more than 300mm distance. 4. Stress test and customer acceptance Construction workers in the pipe stamping test when there is no run, run, drain, drop and other phenomena, confirmed by the customer after the inspection can be accepted.
What does the boiler pressure mean?
The pressure must not be too high, 1.2 to 1.5 is the most appropriate range, more than will reduce the life of the sealing parts, too little pressure will not start the phenomenon, the solution is to open the bleed valve to open the water, open the water switch add water. Gas-fired boiler (also known as gas-fired heating water heater, see GB-2017 "gas heating water heater") is based on natural gas, artificial gas or liquefied petroleum gas as fuel, fuel burner output, combustion in the combustion chamber, by The heat exchanger absorbs the heat, and the circulating water in the heating system passes through the heat exchanger and is heated by reciprocating heat to continuously output heat to the building to provide heat to the building. In addition to the general dual-use gas boiler with heating function, both hot water function (that is, in addition to heating, but also with gas water heater function). The boiler can provide heat for the heat sink or heat source for the floor heating system. Commonly used wall-hung boilers are divided into two types of heating and heating dual-purpose furnaces and single-floor furnaces.
Gas boiler display hh what is the fault
Dddddddddddddddddddddd
To install the mixed water center also installed with a pressure differential bypass valve
The role of mixed water center is mainly to adjust the warm water supply problems, to achieve automatic control of water supply temperature. Reason: According to the provisions of the country to warm the installation, the water temperature should not be higher than 60 ℃: 1, to prevent the warm water in the warm pipe, water mixers and other heating system components in the scale. 2, to warm the pipe material for the plastic material, the higher the temperature of the working environment, the greater the pressure, will shorten the warm life. Municipal central heating more in accordance with the heating film heating temperature of 80 ℃ to the water, far more than the warm to apply the highest temperature. The mixed water center can mix the low temperature water of the heating system backwater into the water supply pipe, lower the heating water temperature, and then supply it to the floor. Refer to the following figure: Madison fireplace, dedicated to your service.