shoring prop accessory for formwork

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Concept

We are the professional supplier of formwork, scaffolding, couplers, prop, etc. As the leading supplier of modular formwork in North East China, we endeavour to help you build faster and conveniently, and most important, guarantee the safety for workers. We also endeavour to protect environment because we only have one earth.






Thanks to our credibility and high quality products, the company has built long term cooperation relationship with many world class enterprises such as Saudi Arabia ATCO group,

Russia Sakhalin Energy Investment Company, Italy Geoplast Company, etc.




Specifications

1. light weight, high strength
2. sustainable and enviroment friendly  
3. reusable
4. eco-friendly
5. easy operation








Product Description

Shoring prop supporting system is used to support formwork system. The system composed by shoring prop, tripod, fork and H20 beam, and then put the formwork panels on the H20 beam to make slab. The maxium loading on one single prop (2-4m) is 1.1 ton when the height adjust to 4m, the high capacity of loading gurantee the safety of the whole formwork system.






Product Characteristics

product nameShoring prop supporting system
originChina
colorAs required
materialQ235
weight15kg
max load1.1 ton
brandBOFU
adjustable height2-4m
surface treatmentpowder coated




Product Introduction

Handier


The weight of prop is 15kg, one worker can hold it easily.



easy set up

Use tripod, prop, fork and H20 beam, the supporting system can be set up easily.








Strength


The material of prop is Q235, the maximum load of single prop is 1.1 ton when the height adjust to 4m, just add or reduce the number of props to fit 10-40cm thickness slab.






Package


The system can packed seperately by pallet, easy to transport.


shoring prop

H20 beam


project Sample


Please send your enquiry to us, we will be your service at any time.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How many meters of steel braced frame
[structural designer] by the "concrete design code" article 9.1.1 of reinforced concrete structural expansion joints of the maximum spacing should comply with the provisions of table 9.1.1: reinforced concrete expansion joints maximum spacing (m)
Q:Why subway steel erection erection to the design elevation of 800
The excavation of the foundation pit is divided into 3 steps: large scale mechanical excavation and 1 manual excavation, which are as follows: (1) the first layer is mainly made of short arm excavator, which is excavated to the ground below 0.9m
Q:How to adjust the ratio of steel support to X stable stress and strength design value
1, the replacement of the better properties of the cross-section (not necessarily increase the cross-section, to be specific)
Q:How to distinguish between the columns of single and double steel support
1, the post section is consistent with the single column brace. The upper and lower sections of the column are not consistent, and the lower column is supported.
Q:How much should be the concrete strength of the main structure of the steel support to carry out the construction
Support system of the special support for the following points: (1) the support of the switch must be in accordance with the principle of first support after the demolition
Q:Under the steel support line load is 420kn/m (design value)
So, what you said is the foundation pit excavation, pipe ends supporting, then why have load and steel 420kN/m?Do you want to build a house above the shop?
Q:Steel support can stay in the wall joint position, if not, then why?
Note: the I-beam is and even steel cage wall welded together, lifting and reinforcement cage is synchronous lifting installation, when pouring concrete, concrete and steel reinforcement cage are I-beam wrapped inside, while under load
Q:What is the size and wall thickness of the steel support inside and outside?
General internal tube is 48, the outer tube is a tube of, 2.0-3.5m steel support wall thickness 2mm, 2.4-3.9m steel support wall thickness 2.75mm.JDG is a compact zinc thin wall wire tube, which is connected to the top of the pipe to tighten the pipe. KBG buckling type thin-wall galvanized wire tube, the connection is pressing pliers, the pipe and fitting out of pits, closely connected.
Q:The exterior package aluminum plate, with steel support, about how much money.
General should be between 450-600 yuan / square meters. Only the price in this range, with a real to
Q:Steel support, mixed soil support, calculation method?
There are many kinds of support, you said, according to the points of the material as well as the credits,

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range