Fabric Formwork

Hot Products

FAQ

What is the waterproof layer and the waterproof cushion in the tile roof?
Waterproof layer: set in the tile or metal sheet below, from the waterproof, moisture-proof structure of the layer. The waterproof cushion plays an important role in the tile surface, because the "tile" itself can not be counted as a waterproof material, only tile and waterproof cushion combination to form a waterproof fortification.
Is foam concrete suitable for use as a cushion?
The foamed concrete is a foaming system through a foaming machine that allows the foaming agent to be fully mechanically foamed and the foam is mixed evenly with the slurry.
Do you need a cushion for roof waterproofing?
If the base layer of the waterproof layer is flat or in line with the requirements of the waterproof material process, you can not do leveling layer. For example, in the cast-in-place concrete roof with the pound with wiping light, may serve as the waterproof layer of the grassroots.
Large area ground concrete cushion seam Why is the separation of joints generally concrete
hird, the relevant parts Different types of rigid waterproof layer separation spacing in addition to meet the calculation needs, but also in the following parts set sub-grid joints. 1. The deformation of the roof structure sensitive parts; 2. Roof and roof drainage direction changes; 3. The junction of the waterproofing layer and the protruding roof structure; 4. Under normal circumstances, each bay load-bearing walls should be set sub-grid seam. 5. Between the waterproof layer and the load-bearing or non-load-bearing parapet or gable should be set sub-grid joints, and in the node structure for proper treatment.
Do you need a cushion on the ground floor?
First to ask the use of your huts, there is the strength of the huts. If you just get a little, then a few years into a dangerous floor, then calculate the ground, walls, roof (slope roof) area, doors and windows can be used as a wood plate loss.
Roof waterproof mattress should play the number of centimeters appropriate
Roof leaking of the construction program: ? 1. Need to remove the previous waterproof, such as paint, coil, etc., if it is to do the mortar waterproof can not be eradicated.
The cushion is usually in the housing which parts
First of all, the foundation refers to the basis of the ground below, the cushion is generally below the base, the base should be there, if the sewage treatment station, then you look at the sewage pool, the bottom of the pool should also have it
Maintenance time of the cushion on the roof of the building
Concrete watering maintenance time: the use of Portland cement, ordinary Portland cement or slag Portland cement mixed with concrete, not less than 7d;