Aluminum-Frame Formwork
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Square Meters m²
- Supply Capability:
- 10000 Square Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1 . INTRODUCTION of Aluminum-Frame Formwork
As the framework,it is adapted to the plywood with thickness of 18mm.High-precision production line guarantees the perfect products.It is very light,it can be operated by single labor.
2 . CHARACTERISTICS of Aluminum-Frame Formwork
Few parts for fast forming.
Max.Concrete pressure:80KN/M2
Aluminum frame
The thickness of plywood is 18MM
The complete formwork system for slab casting,easy& quick assembly
`
Light panel weight,easy to carry
Economical,versatile& hi-speed formwork system,comes with a permissible slab thickness of 400MM
Working efficiency is greatly improved by fast erection and dismantlement
The panel can be supported by both props and scaffolding.
High standardization with components
3.PROJECT APPLICATION of Aluminum-Frame Formwork
Aluminum Formwork
1.Introduction of Aluminum Formwork
Whole aluminum formwork is a new technology for formwork,It is very light and the concrete
surface is more smooth than traditional method.All the material is recyclable.
2.Characteristics of Aluminum Formwork
Lighter weight but high bearing capacity.
Manual transportation can be achieved,greatly reduces the aggregate cost.
Perfect design,excellent produce and well welding make sure the flatness of concrete surface.
It is with the advantages of standard design,excellent applicability and interchangeable.
Simple,safe and fast.
No rust corrosion,easy maintenance,and high turnover rate.
The formwork series are a complete system with a full set of accessories,can be set up flexibly
according to project.
3.Details of Aluminum Formwork
- Q:The whole concrete wall climbing frame or good use of steel scaffolding
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction
- Q:What is an integrated climbing frame? What are the works? What are the advantages
- And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings. Rental fees do not want the same
- Q:Advantages and disadvantages of climbing frame and floor type scaffold
- 2) easy to install and disassemble, set up flexible. Because the length of the steel tube is easy to adjust and the fastener is convenient to connect, the utility model can be used for various buildings and structures with various planes and elevations.
- Q:What are the maintenance and maintenance of hydraulic climbing formwork
- After the shift between the device and the main girder is inserted on the pin and the pin card, after the shift is already used for rear jacking jacking, wind cable is tightened, the adjacent frame between the climbing frame is firmly rachel.
- Q:Climbing frame is divided into several kinds, what is its running mode? What is the rental cost? Please explain in detail! Thank you very much
- Install the lifting seat and a guide seat is connected with the high wall, main frame vertical rod, the frame set up to the designed height, laying the top scaffold, block feet - laying bottom safety nets and scaffolding, making turning plate - the upper part of the frame body structure and effective tie (tie spacing is not greater than 6m) - display efflux dense mesh safety net to the top of the shelf, the anti dropping boom is inserted into the base anti dropping device, the installation of steel rope - placed distribution cables, installation control cabinet, electric hoist, electric wiring and debugging system, pre inspection, electric hoist, demolition of frame body and the upper structure of pulling and synchronization a layer - installation completed, enter the upgrade cycle
- Q:The difference between the scaffold and the scaffold
- Climbing frame, also known as the lifting frame, according to its source of power can be divided into hydraulic, electric, manual pull and other major categories. It is a new type of scaffolding system developed in recent years, which is mainly used in high-rise shear wall construction. It can climb up or down the building. This system makes the change: one is the scaffold without turning over shelf, two is exempt from the disassembly process of scaffold (an assembly has been used after the completion of construction, and not affected) building height restrictions, greatly saves manpower and material. And in terms of security is also a big change for the traditional scaffolding. Highly developed in high-rise buildings.
1. Manufacturer Overview |
|
---|---|
Location | Shanghai,China |
Year Established | 1949 |
Annual Output Value | Below US$1 Million |
Main Markets | North America South America Eastern Europe Southeast Asia Africa Oceania Mid East Eastern Asia Western Europe Central America Northern Europe Southern Europe South Asia Domestic Market |
Company Certifications | ISO 9001:2008 |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | SHANGHAI |
Export Percentage | 91% - 100% |
No.of Employees in Trade Department | 200 |
Language Spoken: | English,Chinese |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Aluminum-Frame Formwork
- Loading Port:
- XINGANG
- Payment Terms:
- TT or LC
- Min Order Qty:
- 500 Square Meters m²
- Supply Capability:
- 10000 Square Meters per Month m²/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords