• Protection formwork System 1
  • Protection formwork System 2
Protection formwork

Protection formwork

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Protection Platform PP-50

A kind of new type construction protection system, applying operating platform and safer job

location for construction corps.


Characteristics:

◆ Easy and quick assembling.

◆ Lifted as a group, it is rapid and economic.

◆ Auto-climbing

◆ A safe and reliable anchor system

 1. Composition

 2. Assembly process of anchor system

(1) Embed V-climbing cone and anchor plate into the slab.

(2) Fix anchor shoe on the slab by tensile bolt.

(3) The fixed anchor shoe.

◆ High work efficiency with work platform and unload platform

◆ High light transmittance with the hollow block





Q:What are the quotas for the concrete
If the inspection wells in your project are the stereotypes in the standard set, you can select the corresponding quotient subheads with the corresponding sounding wells. If the non-stereotyping wells can be installed by the cast iron cover, such as the underlaying, the bottom of the well, the borehole, the covers, and the cast iron covers can be used to calculate and apply the quotas separately.
Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
In order to open the door on both sides, especially the cargo ladder. This is usually used to open the door before and after, mainly spare
Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
If you have to worry, directly to the property complaints ah, so that the family to give you a guarantee ah ~ ~ ~ ~ we say there is no impact and not the top things, to the property and this home to give you a statement is serious, It is best to text things, in the future to pass the skin also accounted for
Q:Check the wellbore height and well height respectively
The height of the wellbore is the height of the wellbore to the height of the wellhead. Well, is the space in the well to carry out the relevant operation. Check the chute of the well, with the same elevation of the same base, when people enter the inspection wells, to stand on both sides of the sink. So the bottom is filled with fine stone concrete, accounting for a certain height of the wellbore, the remaining wells, the net height is the height of the well
Q:Why did the Anping platform mean that the work surface could be mined?
The backward mining can find out the change of the geological conditions and the characteristics of the coal seam within the whole mining area through the roadway, which is beneficial to the mining preparation, and the mutual interference between mining and excavation is small, and the roadway maintenance condition is good.
Q:How much is the elevator floor
This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.
Q:What is well in the construction project
There is no specific definition of "wellbore" in the construction project. It is estimated that you may say that the underground pipe network and the pipeline repair well are surrounded by the cylindrical part of the tank, and the high-rise building is reserved for the elevator.
Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
1, chisel in addition to paint to the structural layer. 2, the crack with a cutting machine cut into "V" word, with the expansion of rubber mosaic seal. 3, the loopholes in the use of Songshan plugging the spirit, pressure pump plug 4, with special cement paint leveling. 5, cross-painted polyurethane 4 times .6, with cement paint play a protective role.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords