• Shaft Platform for Build System 1
  • Shaft Platform for Build System 2
Shaft Platform for Build

Shaft Platform for Build

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Shaft Platform

As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft,

equipment shaft, stair shaft of high-rise building and so on.


Characteristics:

◆ The length of shaft beam is adjustable.

◆ Flexible structure makes lifting easier.



Q: A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
The elevator shaft is handled according to the elevator company design, and the elevator design is needed according to the elevator. Generally before and after leaving the hole, that is, the elevator front and rear doors. I touched the elevator a lot, there are a lot of left and right are not left to die
Q: Check the wellbore height and well height respectively
Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
Q: Concrete is also used, grouting also note, the water does not leak are used, is infiltration
1, chisel in addition to paint to the structural layer. 2, the crack with a cutting machine cut into "V" word, with the expansion of rubber mosaic seal. 3, the loopholes in the use of Songshan plugging the spirit, pressure pump plug 4, with special cement paint leveling. 5, cross-painted polyurethane 4 times .6, with cement paint play a protective role.
Q: Why did the Anping platform mean that the work surface could be mined?
The backward mining can find out the change of the geological conditions and the characteristics of the coal seam within the whole mining area through the roadway, which is beneficial to the mining preparation, and the mutual interference between mining and excavation is small, and the roadway maintenance condition is good.
Q: What are the quotas for the concrete
If the inspection wells in your project are the stereotypes in the standard set, you can select the corresponding quotient subheads with the corresponding sounding wells. If the non-stereotyping wells can be installed by the cast iron cover, such as the underlaying, the bottom of the well, the borehole, the covers, and the cast iron covers can be used to calculate and apply the quotas separately.
Q: What is well in the construction project
(20-30 degrees below) called the inclined well, in the civil foundation of the basic engineering, the construction of the coal mine, metal ore, non-metallic mineral industry from the ground down to the mining level of the channel called the well, vertical called the shaft, For the hard soil in the past by the artificial excavation of pouring reinforced concrete is also called wellbore, and now more use of mechanized pile foundation construction, wellbore less.
Q: My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
If you have to worry, directly to the property complaints ah, so that the family to give you a guarantee ah ~ ~ ~ ~ we say there is no impact and not the top things, to the property and this home to give you a statement is serious, It is best to text things, in the future to pass the skin also accounted for
Q: How much is the elevator floor
First look at what you are the speed of the elevator, the elevator speed is different, the buffer distance is not the same, requiring the height of the engine room is not the same, such as 2.5m / s elevator, with 4.0m / s elevator, the buffer distance is not the same The height of the engine room is not the same.

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords