• Protection Platform PP-50 formwork and scaffolding system System 1
  • Protection Platform PP-50 formwork and scaffolding system System 2
Protection Platform PP-50 formwork and scaffolding system

Protection Platform PP-50 formwork and scaffolding system

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Protection Platform PP-50

A kind of new type construction protection system, applying operating platform and safer job

location for construction corps.


Characteristics:

◆ Easy and quick assembling.

◆ Lifted as a group, it is rapid and economic.

◆ Auto-climbing

◆ A safe and reliable anchor system

 1. Composition

 2. Assembly process of anchor system

(1) Embed V-climbing cone and anchor plate into the slab.

(2) Fix anchor shoe on the slab by tensile bolt.

(3) The fixed anchor shoe.

◆ High work efficiency with work platform and unload platform

◆ High light transmittance with the hollow block



Q:What are the quotas for the concrete
(Concrete prefabricated) Prefabricated cover plate Installation of wellbore covers and associated scaffolding templates and even concrete transport, etc.
Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
This situation should be spare, there are some for the elevator through the door design
Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
There is no impact, with the specific construction program, the elevator shaft design structure, the specific installation location, elevator selection, late closure noise reduction measures have a great relationship ~ ~ ~ air on the air that has no effect, where to say ah
Q:Check the wellbore height and well height respectively
Manhole: connection (manhole) Sewage sewer and drainage pipes Maintenance workers Check through piping to prevent clogging of the structure. Precipitation and manholes are generally located at the intersection of the station's ground drains, drains, sewers or elevation changes that are prone to siltation, obstructions where it is convenient for dredging and a sedimentation draining well.
Q:Why did the Anping platform mean that the work surface could be mined?
The main drawback of the backward mining is the large amount of the initial project, the construction period is long and the production is slow. Progressive mining is the opposite of reverse mining.
Q:How much is the elevator floor
This is based on the requirements of the elevator manufacturers, generally in the design of the time, the owners have not set the elevator manufacturers, but can have intention, according to the intention of the manufacturers of samples, the appropriate amplification, in the structure before the construction, and then modify the official information Yes.
Q:What is well in the construction project
After the completion of the wellbore for the elevator, in the construction process of many ancients are in the wellbore, compared to what the crane
Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
It was you did not find a good construction team. Because you said the treatment, it is estimated that each time are handled separately it Cost is also a separate to it Tough leaking, the need for a one-time comprehensive management Caixing. We generally as a plugging to the subsequent free warranty for 5 years. So for the construction of the terms, more than a maintenance will be much more cost. Only once repaired, in order to produce a certain profit.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords