• Protection Platform formwork and scaffolding system System 1
  • Protection Platform formwork and scaffolding system System 2
Protection Platform formwork and scaffolding system

Protection Platform formwork and scaffolding system

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Protection Platform PP-50

A kind of new type construction protection system, applying operating platform and safer job

location for construction corps.


Characteristics:

◆ Easy and quick assembling.

◆ Lifted as a group, it is rapid and economic.

◆ Auto-climbing

◆ A safe and reliable anchor system

 1. Composition

 2. Assembly process of anchor system

(1) Embed V-climbing cone and anchor plate into the slab.

(2) Fix anchor shoe on the slab by tensile bolt.

(3) The fixed anchor shoe.

◆ High work efficiency with work platform and unload platform

◆ High light transmittance with the hollow block



Q:What are the quotas for the concrete
There are three items in the quota
Q:A lot of housing elevator shaft why have set up before and after the hole, obviously only one elevator front room, behind the structure of the hole to open what he used to do? Or in order to reduce the structural stiffness? Or in order to reduce the load? Seek the design elite to give thanks Thank you
The elevator shaft is handled according to the elevator company design, and the elevator design is needed according to the elevator. Generally before and after leaving the hole, that is, the elevator front and rear doors. I touched the elevator a lot, there are a lot of left and right are not left to die
Q:My family to buy a new house, a total of five floors, my second floor, the first floor with a basement, basement north of a row of garage. Now my house downstairs to buy two adjacent garage, with the basement to get through, in the basement built elevator directly to the first floor. Does this have any effect on my family? Housing quality, firmness, noise and so on! Thank you!
If you have to worry, directly to the property complaints ah, so that the family to give you a guarantee ah ~ ~ ~ ~ we say there is no impact and not the top things, to the property and this home to give you a statement is serious, It is best to text things, in the future to pass the skin also accounted for
Q:Check the wellbore height and well height respectively
The height of the wellbore is the height of the wellbore to the height of the wellhead. Well, is the space in the well to carry out the relevant operation. Check the chute of the well, with the same elevation of the same base, when people enter the inspection wells, to stand on both sides of the sink. So the bottom is filled with fine stone concrete, accounting for a certain height of the wellbore, the remaining wells, the net height is the height of the well
Q:Why did the Anping platform mean that the work surface could be mined?
The backward mining can find out the change of the geological conditions and the characteristics of the coal seam within the whole mining area through the roadway, which is beneficial to the mining preparation, and the mutual interference between mining and excavation is small, and the roadway maintenance condition is good.
Q:How much is the elevator floor
First look at what you are the speed of the elevator, the elevator speed is different, the buffer distance is not the same, requiring the height of the engine room is not the same, such as 2.5m / s elevator, with 4.0m / s elevator, the buffer distance is not the same The height of the engine room is not the same.
Q:What is well in the construction project
After the completion of the wellbore for the elevator, in the construction process of many ancients are in the wellbore, compared to what the crane
Q:Concrete is also used, grouting also note, the water does not leak are used, is infiltration
1, chisel in addition to paint to the structural layer. 2, the crack with a cutting machine cut into "V" word, with the expansion of rubber mosaic seal. 3, the loopholes in the use of Songshan plugging the spirit, pressure pump plug 4, with special cement paint leveling. 5, cross-painted polyurethane 4 times .6, with cement paint play a protective role.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords