QTZ125 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
QTZ125 tower crane is hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.
The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.
All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises
The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.
Technical Performance Parameter Table
Item | Unit | Magnification | ||
α=2 | α=4 | |||
Rated lifting moment | kN.m | 400 | ||
Maximum lifting capacity | t | 2 | 4 | |
Working amplitude | m | 3 ~50 | ||
Maximum amplitude lifting capacity | t | 0.8 | ||
Lifting height | Independent | m | 29 | |
Attached | m | 120 | ||
Time of moving outrigger end to rotation center | m | 50.74 | ||
Time of moving balance arm tail to rotation center | m | 12.816 | ||
Counter weight | t | 8.54 | ||
Total motor power | kW | 24.9 | ||
Allowable working temperature | 0C | -20~+40 |
(1)4-magnification Lifting Performance Table
Amplitude(m) | 3-10.966 | 11 | 12 | 13 | 14 | 15 | 16 | 17 | 18 | 19 | 20 |
Lifting capacity(t) | 4 | 3.98 | 3.64 | 3.36 | 3.10 | 2.89 | 2.70 | 2.54 | 2.39 | 2.26 | 2.14 |
Amplitude(m) | 21 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | 31 |
Lifting capacity(t) | 2.04 | 1.94 | 1.85 | 1.77 | 1.69 | 1.62 | 1.56 | 1.50 | 1.45 | 1.39 | 1.35 |
Amplitude(m) | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | 41 | 42 |
Lifting capacity(t) | 1.30 | 1.26 | 1.22 | 1.18 | 1.14 | 1.11 | 1.08 | 1.05 | 1.02 | 0.99 | 0.97 |
Amplitude(m) | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |||
Lifting capacity(t) | 0.94 | 0.92 | 0.89 | 0.87 | 0.85 | 0.83 | 0.81 | 0.80 |
(2)2-magnification Lifting Performance Table
Amplitude(m) | 3-21.4 | 22 | 23 | 24 | 25 | 26 | 27 | 28 | 29 | 30 | |
Lifting capacity(t) | 2 | 1.94 | 1.85 | 1.77 | 1.69 | 1.62 | 1.56 | 1.50 | 1.45 | 1.39 | |
Amplitude(m) | 31 | 32 | 33 | 34 | 35 | 36 | 37 | 38 | 39 | 40 | |
Lifting capacity(t) | 1.35 | 1.30 | 1.26 | 1.22 | 1.18 | 1.14 | 1.11 | 1.08 | 1.05 | 1.02 | |
Amplitude(m) | 41 | 42 | 43 | 44 | 45 | 46 | 47 | 48 | 49 | 50 | |
Lifting capacity(t) | 0.99 | 0.97 | 0.94 | 0.92 | 0.89 | 0.87 | 0.85 | 0.83 | 0.81 | 0.80 |
- Q: How to choose tower crane in engineering, such as arm length and lifting weight?
- 1, according to the general layout plan on the mechanical layout requirements to determine. The tower crane's arm length should be swept to the required area, otherwise the worker's formwork and materials can not be transported vertically. (tower crane is the main tool to solve vertical transportation, and auxiliary tools are derricks and double cage elevators)2. After a project has been obtained, it is important to design the layout plan of the field machinery at first. It determines the position of the tower crane and uses several tower cranes, etc. it also conforms to the requirements of economic rationality.3, we should take into account the location of the tower crane, but also take into account the length of the tower crane, but also to meet the requirements of the site construction schedule.
- Q: I have a problem in discovering the breakdown in the tower crane control panel. If you can give me a procedure to follow the problem in the control panel.
- Generally tower cranes have their electrical panels at the ground floor. Troubleshooting in the tower crane is not different to any other electrical system. First check the power circuit healthiness--switches,fuses,contactors and then go for control circuit. The cranes have few additional interlocks for excessive forward movement, extra long travel etc. Just go through the drawing and u will get the problem solved
- Q: would a tower crane be a first class, second class, or third class?
- Did you open your ME book? The answer is in there.
- Q: What symbols are there in the story? What might be the symbolic meaning of the sea? the boat? the seabirds? the shark? the unmanned life-saving station? the lighthouse? the tourists on the beach?What is the theme of the story? What does the story as a whole say about human beings and nature? about male bonding? about survival? how are these three topics related in the story as a whole?
- This Site Might Help You. RE: The Open Boat by Stephen Crane? What symbols are there in the story? What might be the symbolic meaning of the sea? the boat? the seabirds? the shark? the unmanned life-saving station? the lighthouse? the tourists on the beach? What is the theme of the story? What does the story as a whole say about human beings and nature?...
- Q: I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
- He angered the President by failing to stop the contestants from beating the game, so his death was demanded.
- Q: There are a range of cranes to be selected for a particular type of job. Please provide any suitable method so that we narrow down our selection criteria .
- What is the load weight? How high is the lift? Obstruction, possibly needing a jib? If you are placing a load onto a roof, how far from the edge of the roof is the load going to be placed? How far from the crane pivot is the load on the ground and how far are you going to to move the load away from the crane to place it in position? How close can you get the crane to the load and to the load placement site. The usual scenario is to call a crane outfit and they will ask you these questions over the phone or come to the site and discuss the lift with you. A crane is rated for maximum lift as close, usually 10 feet,to the cab pivot center. As the distance increases, the maximum load that can be lifted, decreases. Our 15 ton crane can pick 15 tons/ 30,000 pounds at 10 feet from pivot center. With the boom fully extended; the boom is 100 feet, at a 30 degree angle, it can pick up only 5,000 pounds. Inside of every crane cab should be a chart that shows the lift capacity at various boom angles and boom lengths. Also is included is a chart for the Jib, if the crane has one. Wingman
- Q: How to distinguish self lifting tower crane with counterweight and lifting tower crane without counterweight
- 1 self lifting tower cranes with counterweight are common tower cap tower cranes, plate type tower cranes and flat head tower cranes, characterized by a counterweight made of several concrete on the balance arm,
- Q: did stephen crane win any awards?
- Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
- Q: explain thoroughly please
- Sure. Let's say that a crane needs to hoist a load of 10 tons, and that because it needs to reach over some obstacles, needs to lift at a horizontal distance of 50 feet away. That creates a torque about the base of the crane of 500 ton·ft. By positioning a counterweight on the opposite side of the tower, the magnitude of the moment can be mitigated. For instance, let's say a counterweight of 10 tons is positioned at 25 ft on the other side of the tower. The moment produced by the counterweight is 250 ton·ft, so the net moment at the base is 250 ton·ft. Furthermore, when the 10 ton load is positioned and release, there is still a 250 ton·ft moment at the base of the tower; it has simply switched direction (say from rotating the crane to the right, to rotating it to the left). If you find this helpful, please award Best Answer!
- Q: You know those big cranes that sometimes hang above constructed buildings. I usually thought a crane is used to build that crane but then how is that first crane that built the crane get there in the first place?
- from the ground up
Send your message to us
QTZ125 tower crane
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 12 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
Hot products
Hot Searches
Related keywords