• TC5020 tower crane  /  QTZ125 tower crane System 1
TC5020 tower crane  /  QTZ125 tower crane

TC5020 tower crane / QTZ125 tower crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125(TC5020) tower crane is a fixed, self-erecting and wall-attached tower crane. In addition to its advanced parameters, reliable performance, well-looking appearance, and excellent quality, it has characteristics such as long boom, larger working coverage, hydraulic rising, and tandem mounted tower body. Its design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels. Its lifting height is obviously increased thanks to its self-erecting and wall attached function. It is applicable for construction of different industrial, commercial, office, and civil building lower than 160m, and thus becomes an ideal service-building machine at home.




 

Q: I work in downtown Atlanta, and they are doing some kind of work on top of one of the high rise buildings downtown with a big crane. I was wondering how they got that heavy of a crane there to begin with? Thanks ahead of time!
Detailed okorder /
Q: What does tower crane 400tm mean?
Lifting torque of 400 tons. Meters, also known as 4000KN/m, refers to the QTZ400 tower crane, the general maximum lifting capacity of 25 tons, big arm 70 meters, the most front-end hanging 5.2 tons, independent height of about 70 meters. Normally we say QTZ40 tower crane is lifting torque of 40 tons. Meters, 400KN/m.
Q: Is tower crane a tower crane?
It is tower crane, tower crane, commonly known as tower crane, tower crane --- tower crane. Ha ha, hope to adopt.
Q: What should be included in the disassembly plan of the tower crane?
- 2 - (1)Project and safety supervisor with safety certificate and mechanical management personnel.(2)Construction crane with qualification certificate for construction operationMachinery installation, disassembly, lifting, signal workers, electricians, lifting drivers, cable operators and other special operations personnel.The above constructors shall fill in the name, type of work and qualification number of the constructors.11 、 installation procedure and safety quality requirement;In strict accordance with the tower crane product specifications, installation procedures and safety quality requirements of the implementation of the organization of safety construction technical disclosure and signature confirmation.12, installation self-test;After installation, the installation of the unit with the installation quality testing, debugging safety device and complete self-test report.13, major sources of risk and safety technical measures14, emergency plans and so on
Q: I still cannot grasp how a crane was taken apart on a building with no roof
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
Q: What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
Any modifications to a crane or other hoisting device should be checked with the manufacturer or designed by an Engineer schooled in the proper discipline IE: not an electrical or nuclear engineer.
Q: The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
Sorry the only information on Cranes here is of the Feathered variety, you have entered the wrong section sorry.
Q: I'm talking about one of the ones where the cabin and the worker is high up in the air. You cant exactly remove a part of the bottom of the cranes structure because it would fall on top of you but you cant remove the cabin because its so high up and what can get up that high to remove it except another crane BUT how did that get built ?Thank you.
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q: I have to answer some questions about an except from Where I Lived, and What I Lived For by Henry Thoreau. I don't need an explanation for all the metaphors he uses and what they mean, but what is he talking about with the Pygmy thing? Do the pygmies battle the cranes because... they want to eat them? Are cranes just d!cks? Is a crane some type of weapon?
Pygmies Definition

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords