• TC5012 tower crane  /  QTZ63 tower crane System 1
TC5012 tower crane  /  QTZ63 tower crane

TC5012 tower crane / QTZ63 tower crane

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ63(TC5012) tower crane is a fixed, self-erecting and wall-attached tower crane. In addition to its advanced parameters, reliable performance, well-looking appearance, and excellent quality, it has characteristics such as long boom, larger working coverage, hydraulic rising, and tandem mounted tower body. Its design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels. Its lifting height is obviously increased thanks to its self-erecting and wall attached function. It is applicable for construction of different industrial, commercial, office, and civil building lower than 160m, and thus becomes an ideal service-building machine at home.




 

Q:What is the theme of the poem A man to the universe by Stephen Crane?
In the poem “A Man said to the Universe” by Stephen Crane three distinct images appear as the reader relates man and universe as they fit into their cosmic role. The simplicity of the five line poem envelopes man’s perception of his place among the universe, the universe’s perception of its role in the order of life, and the relationship of both man and universe in regards to the enormity of the cosmos. Collectively, these three components create a profound thought on creation. By Folrani Adewale
Q:What is a "crawler crane" and what kinds of jobs is it good for?
*A crawler is a crane mounted on an undercarriage with a set of tracks (also called crawlers)that provide for the stability and mobility of the crane. Crawler cranes have both advantages and disadvantages depending on their intended use. The main advantage of a crawler is that they can move on site and perform lifts with very little set-up, as the crane is stable on its tracks with no outriggers. In addition, a crawler crane is capable of traveling with a load. The main disadvantage of a crawler crane is that they are very heavy, and cannot easily be moved from one job site to the next without significant expense. Typically, a large crawler must be disassembled and moved by trucks, rail cars or ships to be transported to its next location. Crawler cranes range in lifting capacity from about 40 US tons to 3500 US tons.
Q:Vtwin doc helped me out with this dam thing recently Im thinking he has the 411! So here goes: My friends coil went bad and we used a single fire coil on a dual fire ignition. V twin doc showed me how to do that. But it still doesnt quite run proper. So here are the settings:Its set at 5900 R.P.M. limit,with advance slope at 9.the rear cylinder is set at 0.Its set on dual fire,its set on electric start.and its set on multi spark not single.Its a crane fireball hi 4e model 8-3100. It cranks for a bit before starting and runs a little rough at low R.P.M. ran just fine with the stock coil.
I don't know how much this is gonna help, but on my Ironhead I use a 8-2100, set at 1degree BTDC, and rear at 2 BTDC and electric start in race mode. Now I have aggressive cams and I don't know how it's supposed to be for a stock single stick.
Q:does it only carry thousand of pounds stuff or wat?? for science project??
Cranes are large, long-legged and long-necked birds of the order Gruiformes, and family Gruidae. While folklore often states that cranes mate for life, recent scientific research indicates that these birds do change mates over the course of their (considerable) lifetimes (Hayes 2005). Some species and/or populations of cranes migrate over long distances, while some do not migrate at all. Cranes are gregarious, forming large flocks where their numbers are sufficient.
Q:The truck has a Comprehensive Motor insurance cover. There is no exclusion in the policy in respect of tools of trade.
try okorder /
Q:Absolutely bs. I hope a crane falls on ALL these effin construction workers and their families and the building executives' heads. Let THEM have family members die or get hurt from these accidents - then they will get what's coming to them. They should all burn in hell. Total greed total total greed. They will pay
i think of they're injuries. regrettably people who artwork for the city government - a minimum of in massive apple - are fairly incompetent and corrupt. What makes you assert that No inspector might intentionally ignore a destructive present issue ? That 's precisely what the inspector of the 1st crane crumple did. Oops, my mistake. He did no longer examine the cranes in any respect. And all those people who died these days in shape by using being blown off by using wind from large heights??!! I even have not at all heard something like that till now. Who supplies those human beings the needed helps?? How knowledgeable are those human beings? the place is their union?
Q:analysis of jib crane?
I would suggest that you delete this question and submit a new question with enough details for someone to give you an answer. This is not a question I can give you much help on
Q:Do they have to be taken apart... if so, how are they taken apart... by another crane? - but how did that one get there etc etc
it depends on the crane over the road mobile cranes drive them selfs to the job site and they have a dolly for the conter weights and then on the larger ones a semi brings in the conter weights. Then on a latise boom crawler crane it depends on the size of the crane if its a small one say a 150 ton crane the body and tracks can usally be moved together on a semi and the lattice boom will come on a seperate truck and is usally assembled with a all terrain fork lift. Then say on a larger crawler crane like a 500 tonner the body and tracks and carrige all come in seperate peices and are ussally put togther with a RT crane(more on the latter) and these cranes are held together with massive pins i saw a crew build a 400 ton manitowac crane with 150 feet of stick in less then a day. Now if they have to add more stick like say 200 feet of main stick and 150 feet of luffing jib they will build it all on the ground and then another crane will help lift the stick up Then there are RT cranes or rough terrain cranes they are moved on a semi to and from the job site and usally require no assebley thats all i know about i cant say how a tower crane is build iv never see one build hope this helps
Q:Ok, so I figured out that last step after watching an origami tutorial thing on youtube
It okorder / The animations on this site are good, showing what you have to do, without hands in the way.
Q:How does the torque of a construction crane relate to the torque of a car?
Torque is force x distance. In a car, the torque is the force twisting the drive axles, and the distance is the radius of the driving wheels. It controls the rate of acceleration of the car. In a crane, the force is that provided by the winch cable, and the distance is the length of the jib. It controls the weight the crane can lift.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords