• QTZ125  tower crane System 1
  • QTZ125  tower crane System 2
  • QTZ125  tower crane System 3
  • QTZ125  tower crane System 4
QTZ125  tower crane

QTZ125 tower crane

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

QTZ125 tower crane is hoisting and conveying machinery which is designed by Shandong Fuyou Co., Ltd. by fully utilizing the group technology, the combinational design technology and the finite element analysis technology and taking the tower crane microcomputer design platform as a tool and has excellent performance.

The crane is a horizontal-arm-rest trolley-amplitude upper-revolution hydraulic lifting type crane which has the effective amplitude of 50m and the maximum lifting moment of 438kN•m. The tower crane has the lifting height of 29m and the adhesion lifting height of 120m (2 magnification) during independent use.

All the speed indexes of the crane meet or surpass national standards.
The crane has the total installed capacity of 24.9kW, features advanced parameters, excellent and reliable properties, attractive appearance, high quality, simple and practical structures, advanced safety devices, convenient maintenance, safe usage and reasonable prices, and is ideal construction machinery for many medium-small construction enterprises

The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.

Technical Performance Parameter Table


Item

Unit

Magnification

α=2

α=4

Rated lifting moment

kN.m

400

Maximum lifting capacity

t

2

4

Working amplitude

m

3 ~50

Maximum amplitude lifting capacity

t

0.8

Lifting height

Independent

m

29

Attached

m

120

Time of moving outrigger end to rotation center

m

50.74

Time of moving balance arm tail to rotation center

m

12.816

Counter weight

t

8.54

Total motor power

kW

24.9

Allowable working temperature

0C

-20~+40

(1)4-magnification Lifting Performance Table


Amplitude(m)

3-10.966

11

12

13

14

15

16

17

18

19

20

Lifting capacity(t)

4

3.98

3.64

3.36

3.10

2.89

2.70

2.54

2.39

2.26

2.14

Amplitude(m)

21

22

23

24

25

26

27

28

29

30

31

Lifting capacity(t)

2.04

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

1.35

Amplitude(m)

32

33

34

35

36

37

38

39

40

41

42

Lifting capacity(t)

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

0.99

0.97

Amplitude(m)

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

(2)2-magnification Lifting Performance Table


Amplitude(m)

3-21.4

22

23

24

25

26

27

28

29

30

Lifting capacity(t)

2

1.94

1.85

1.77

1.69

1.62

1.56

1.50

1.45

1.39

Amplitude(m)

31

32

33

34

35

36

37

38

39

40

Lifting capacity(t)

1.35

1.30

1.26

1.22

1.18

1.14

1.11

1.08

1.05

1.02

Amplitude(m)

41

42

43

44

45

46

47

48

49

50

Lifting capacity(t)

0.99

0.97

0.94

0.92

0.89

0.87

0.85

0.83

0.81

0.80

 

Q: How about the installation and disassembly of the tower cranes?
Authorized by the national security inspection department, the local special operations training school or the technical quality supervision bureau, after the study, assessment, qualification and graduation permit, will give you special operations installation, removal operation certificate.
Q: A lot of condos and hotels are being build in hawaii, and each time i drive pass them i wonder how they are assembled.Since each individual piece looks heavy/sturdy and is 45 stories+ high, how do construction workers put them together. Do they assemble it by hand? Or are smaller cranes needed to do the job? Or possibly a different way i didn't mention?
Read the guy above me his answer is awesome but choose me for your best answer ok
Q: With hi-rise buildings being constructed left and right, i was just wondering, how do they raise cranes? this has really been bugging me for a time now..
JIP cranes are used to do so
Q: We would like some ideas from folks who have the cranes coming to their bird feeders. What foods are they attracted to?
Sand Hill Cranes are omnivores which means that they feed on a wide variety of food. Their diet will change depending on the time of year and the habitat. Part of their diet would be rodents, snails, frogs and other small animals. They also will eat the roots of aquatic plants and grains in farm fields. This is where you may be able to draw the cranes to your yard. Spread the bird seed on the ground. Even small piles of seed may help. These birds like to forage through grassy areas and can do some digging with their beaks leaving the ground lumpy, so be sure you want them in your yard.
Q: S930 M50 (M125/75) level jib tower crane about how much money
Do you want to see is that, generally is Sishijiwan
Q: does anyone have a good slogan for the whooping crane?
**** the whooping crane
Q: ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
Chad IS a Crane... he IS Alastair's son with Liz (Eve's adopted sister) so YES he IS a Crane but he is not the long lost son of julian and Eve ...Chad is Julian and Sheridan and Beth's Half Brother ( remember Beth was also proven to be Alastair's daughter) and I do not know why he doesn't live there ? It is weird everyone else lives there why not them too?
Q: Is it through the rails? if so, then how? or is it by another method?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q: Yeah, I think I know what cranes are used for. But in the context of building an apartment and so on, what is the role derricks there. And why is called cranes and derricks - What is the correlation between them.
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q: tnx for answering :)
I'm not sure what's behind it.. but if you fold a thousand paper cranes, you can make a wish..

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

Hot products


Hot Searches

Related keywords