Cuplock Scaffolding System with Heavy Load Capacity

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
20000 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.   Structure of Cup-lock Scaffolding

Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings. The adapter plug of cup-lock is the core and consists of top cups, bottom cups, post ,ledger connections and limit pins of top cups.

   Cuplock scaffolding is a very popular and versatile metal scaffold system wildly used all over the world. The ease of handling, easy storage space requirements and high load bearing capacity are the main reasons for its immence popularity. We manufacture Cuplock Metal Scaffolding System in Hot Dip Galvanised as well as Painted coated finish as per customer's requirement.


2.   Main Features of Cup-lock Scaffolding


.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.

.Avoid using bolt in assembly and low down labor intensity

.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal


3.   Cup-lock Scaffolding Images

 

4.   Cup-lock Scaffolding Specification

.There is a pair of adapter plugs of cup-lock every 0.5m-0.6m on the post and top bar

.5 times fast of adapter plug assembly and disassembly than normal

.Assuring construction of high-rise scaffolding with the whole safety facilities, the safety and reliability in usage

 

5.   FAQ of Cup-lock Scaffolding

 

1) What promises can be done by us?

  . If interested in Cup-lock Scaffolding, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 3) What about the package and shipping time?

   .Packing:  As Customer's Requirements

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Cup-lock Scaffolding, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The bowl locking conditions of scaffolding, to determine what,
Don't need the bowl buckle is up on the line.
Q:The contents of the inspection and evaluation of steel tubular scaffold with bowl buckle are as follows.
Disclosure and protection acceptance. General projects include: frame protection, material, load, channel. Option A, B error.
Q:why is dimmesdale on the scaffold in chapter 12 of the scarlet letter?
dawww when I saw dimmesdale' I thought you were going to talk about Fairly Odd Parents. If you want to know, try reading the book or watching the movie. According to the movie easy A, you have to watch the old movie not the new, better one.
Q:Scaffolding level net height, spacing
1 horizontal horizontal bar should be set in the vertical horizontal bar and the vertical pole intersect the main node, both ends and the large cross bar fixed;2) the laying of the floor of the operating board should be increased to set the small cross bar;3) single row horizontal horizontal bar inserted into the wall should be greater than 18cm.
Q:i just got a scaffold piercing and its all swollen and purple..?
That piercing is ugly!!
Q:More than 3 floors of the building can be erected with bamboo scaffolding
3, the structure of the scaffold, the components of the initial defects, such as the initial bending of the rod, corrosion, erection size error, eccentric load, etc.;4, and the wall of the connection point, the binding of the scaffold variation. The study of the above issues and lack of systematic accumulation of statistical data, does not have the independent probability analysis of the conditions and structure of the resistance is less than 1 of the adjusted coefficient multiplied by the value determined by calibrating system and safety coefficient used in the past. Therefore, the design method used in this specification is essentially a semi probabilistic, semi empirical. Scaffolding to meet the requirements of this specification is the basic requirements of the design calculation.
Q:has any1 got a scaffold *the bar piercin thru the cartilage*?
no...but i got a hoop on my cartilage......but when i first got it pierced it was a stud..the woman that peirced it for me used a gun so i got a stud......after a few weeks(about 7)i took the stud off and replaced it with a hoop
Q:A 105 kg scaffold is 6.2 m long. It is hanging with two wires, one from each end. A 520 kg box sits 2.2 m from?
assuming the 105 kg scaffold is uniform taking moment abt left end T * 6.2 = 105 *g * 3.1 + 520 g *2.2 T = 2322.76N answer tension in the right hand side wire
Q:Barbell /Scaffold earrings?
Scaffold Earrings
Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
To make sure the components are securely locked together and will not collapse when used.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range